READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-13-2009 regular — reading text
Part 19 of 46. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-24086-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
liability for any
135 damage or cost in any action accruing to persons or property as a result of any act
136 or by reason of an act or omission in the discharge of official duties. Any suit
137 instituted against an officer or employee because of an act performed by that
138 officer or employee in the lawful discharge of duties and under the provisions of
139 this code shall be defended by legal representative of the jurisdiction until the
140 final termination of the proceedings.
141
142 h. Requirements not Provided in the F.B. C. Any requirements necessary
143 for the strength, stability or proper operation of an existing or proposed building,
144 structure, electrical, gas, mechanical or plumbing system, or for the public safety,
145 health and general welfare, not specifically covered by this or the other technical
146 codes, shall be determined by the building official.
147
148 3. 01. 03. Building Permit Required.
149 Any owner or authorized agent who intends to construct, enlarge, alter,
150 repair, move, demolish, or change the occupancy of a building or structure, or to
151 erect, install, enlarge, alter, repair, remove, convert or replace any required
152 impact- resistant coverings, electrical, gas, mechanical or plumbing system, or
153 alter, improve, change, enlarge or repair any parking area, stormwater
154 management system, or infrastructure, or any other installation of which is
155 regulated by this chapter, the F.B. C., or the land development code, or to cause
156 any such work to be done, shall first make application to the building official and
157 obtain the required permit.
158
159 3. 01. 04 Exceptions
160 Ordinary minor repairs may be made with the approval of the building
161 official without a permit. Minor repairs may include but are not limited to:
162 a. painting and the replacement of nonstructural flooring;
163 b. repairing flush and snap switches, replacing fuses, changing lamp
164 sockets and receptacles, taping _joints and repairing drop cords; for the installation
165 of wiring, devices or equipment for telephone, telegraph, district messenger or
166 tele -autograph systems or any signaling system ( other than a commercial radio
167 n/stem ) operating at 50 volts or less, when installed by a public utility subject to
168 regulation as such by the Florida Public Service Commission or an agency of the
169 United Stages;
170 c. repairing or replacing any fixture;
171 d. service conducted to maintain the system, including minor part
172 replacement on any piece of the system; or
173 e. repairing or replacing any plumbing fixture.
174
60-
175
176 3. 01. 05 Penalty for Commencement Prior to Permitting
177
Any person who commences any work on a building, site, structure,
178 electrical,
gas,
mechanical or plumbing system before obtaining the necessary
179 pennits, or any individual who acquires a permit issued in error for either
18o incorrect or false information provided on the application shall be subject to a
181 penalty of 300 percent of the usual pemlit fee or the amount of $250, whichever is
182 greater, in addition to the required pennit fees.
183 Emergency repairs e. g. over weekends or holidays) may be made without
184 subsequent penalty as long as the required -permit is gplied for on the first
185 working day following the day the emergency repairs are made. The building
186 official will determine the validity of the emergency in administering this
187 provision.
188 The building official may deny any permit application which is requested
189 by a person who has violated the provisions of this section three times or more.
190
191 3. 01. 06 Permit Fees.
192 Permit application requests shall be accompanied by fees and charges as
193 may be established by the city council by resolution in the comprehensive fee
194 schedule for proper filing and processing.
195
196 3. 01. 07 Fees for Checking Plans.
197 A fee for checking plan shall be paid to the engineering services
198 department at the time of submitting a plan and specifications. Such fee shall be
199
equal to one -half of the building permit fee. Such plan- checking fee is in addition
200 to the building_permit fee and shall be considered nonrefundable.
201
202 3. 01. 08 Fee for Re- issuance.
203
The permit holder must pay the entire permit fee to have reissued any
204 building permit that has expired, but shall not pay a plan check fee unless new
205 plans are submitted for review.
206
207 3. 01. 09 Fee for Sewer & Water Connections Required.
208 In those instances where the issuance of a permit for connecting to city
209 sewer and water is required, the fee ( including connection or impact fees) for
210 connecting to the sewer and water system of the city shall be collected at the same
211 time the fee is collected for the building permit.
212
213 3. 01. 10 Refund of Fees.
214 A refund of permit fees may be made to the permit holder under the
215 following conditions: the permit is still valid and in effect and the project is
216
cancelled and a written notice of project cancellation is filed with the building
217 official and a written request for refund is filed with the building official not more
218 than fourteen ( 14) calendar days from the date of cancellation. When no work
61-
219 under the pennit has commenced, a refund may be made of the full permit fee.
220 When any portion of the work has commenced under the pennit, no refund shall
221 be made. Refunds shall be made for duplicate permits issued for the same work.
222
223 3. 01. 11 Specific Elevation Required.
y
224 No building permit shall be issued for construction of a commercial
225 building in the city unless the elevation of the floor of such building, as shown on
226 the submitted plans, is at least 12 inches above the higher of the elevation of the
227 surface of the center of the street or of the curb of the street abutting or adjacent to
228 such property where the building is to be constructed. When, in the opinion of the
229 building official or the city engineer, by examination of the plans submitted, a
230 dwelling unit requires the same elevation requirements as stated for commercial
231 buildings, the official will make such elevation requirements a condition of the
232 issuance of the building permit.
233
234 3. 01. 12 Transfer of Permit.
235 A permit holder may transfer a pennit, whether or not work under the
236 pennit has commenced, upon filing of the following information with the building
237 official: a written, notarized request from the new permit holder for the transfer of
238 the permit; a written, notarized statement from the original permit holder agreeing
239 to the transfer of the permit; along with the appropriate fees for transferring the
240 permit. Upon issuance of a transferred pennit, the new permit holder shall assume
241 full responsibility for the project and continuation of the permit.
242 In the event the contractor of record ceases to serve as the contractor on
243 the project, and the aforementioned transfer of permit does not occur, the owner
244 or the contractor must provide the building official written notice as soon as
245 possible. Upon receipt of such notice, the engineering services department will
246 perform a final inspection under this permit and close it out. Before construction
247 can continue, a properly qualified person must obtain a new permit.
248
249 3. 01. 13 Threshold Buildings.
250 Any- threshold building submitted for plan review may at the discretion of
251 the building official be required to have a third party plan review service. The cost
252 for review by the outside plan review service will be in addition to the plan
253 review fees charged by the building department and will be borne by the
254 a pl cant.
255
256 3. 01. 14 Survey of Building Foundations Required.
257 a. Survey Required. The permit holder shall submit to the building
258 official, within 21 calendar days of the foundation inspection, an as -built survey
259 m_ap depicting the foundation, pilings or similar element of the building that
260 identifies the location of the outer walls of the building_or addition as installed
261 and the location of such foundation or pilings, precisely dimensioned in relation
262 to each and every relevant property line of the property upon which a structure is
62-
263 being constructed and any other foundation or building _
on the site.
264 For waterfront properties, the mean high water line and required view
265 corridors shall be clearly indicated on the drawing. The flood zone and finished
266 floor elevation shall also be shown. The survey shall be prepared by or under the
267 direct supervision of a registered land surveyor or professional engineer and
268 certified by a registered land surveyor or professional engineer.
269
270 b Review of Survey The building official shall have seven business days
271 to review the survey, any supplemental drawings and certification provided for by
272 this section, and shall approve the survey, supplemental drawing( s) and
273 certification if all requirements have been met.
274
275 c Any work commenced within the 28
Permit Holder' s Liability.
276 calendar day period from the date of the submission of the required as- built
277 foundation survey, which is required by this section, shall be at the permit holder's
278 risk Any deficiencies or encroachments detected by the building official's review
279 shall be corrected by the permit holder forthwith and prior to further progressive
280 work being permitted to proceed Failure to submit the survey, supplemental
281 drawing and certification required by this section, or failure to make such
282 corrections, shall be cause to issue a stop work order for the project. No vertical
283 inspections shall be performed by the building official until the as -built
284 foundation survey has been submitted and approved.
285
286 d Waiver of Survey Reyuirement The building official may waive the as-
287 built foundation survey or certification for minor construction on single- family
288 residential property involving an addition or accessory building or structure if
289 1 the location of the property line can be readily ascertained, and
290 2 it can be readily and unquestionably determined that the new
291 construction is within the required building setbacks.
292
293 3. 01. 15 Enforcement of Provisions
294 Any licensed individual or company who violates the provisions of this
295 chapter or the F. B. C.may be subject to review
