READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 96-25-Amendment of DRI for Pirates Bay — reading text
Part 2 of 5. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-8513-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
reviewed and approved by
Attorney.
A
D c...-
w f e..
p
o
c CITY OF PORT WALTON BEACH
DBPARTMENT OF COMMORITY DBVBLOPMBRT SERVICES
STAFF REPORT
A. APPLICANT INFORMATION:
Name: Pirates' Bay Community Association
Address: 214 Miracle Strip Parkway SW- Fort Walton Beach
Location: 214 Miracle Strip Parkway SW- Fort Walton Beach
Authorized Agent: Thomas H. Carter, Secretary
Address: 214 Miracle Strip Parkway SW- Fort Walton Beach
B. REQUEST:
The through its authorized agent, Thomas Carter, has
applicant,
requested that the Development Order ( DO) for the Pirates' Bay
Development be amended follows:
c
as
1. The reconstruction original 121 slip marina destroyed
of the
as a result of Hurricane Opal on October 4, 1995.
Construction of the marina will be pursuant to the attached
DEP Permit ' 462864931 date of issue, July 8, 1996 and D. O. A
permit.
2. The construction of two( 2) bulkheads totaling 464 feet in
length with two( 2) returns each SO feet in length. The
bulkhead is to be three feet ( 3') in height. The bulkheads are
to be constructed above the mean high water line and
will be taken to see that all natural
appropriate measures
vegetation seaward will not be disturbed by the construction.
Construction will be pursuant to State and Federal Agency
permits already issued.
The applicants' agent has submitted the form
RPM- BSP- PROPCHANGE- l entitled " Notification of a proposed change
to Previously Approved Development
a of Regional Impact ( DRI)" to
support his application.
C. BACKGROOHD :
The Pirates' Development Order was approved by the
original Bay
of Fort Walton Beach as Resolution 85- 10, March 12, 1985.
City
c The development was proposed to include mixed development
Page 2
Pirates' Bay 0 o
Nov. 1, 1996
including 200 condominium apartment units, 450 hotel units, a 121
slip marina and an unspecified amount of supporting commercial
c uses. The Development Order ( Resolution 85- 10) was to be in
effect for ten ( 10) years with a phased development to be
completed by June 1988. In 1985, construction began on 120 ( 2 -
60 D. U.) condominium units and the 121 slip marina. Upon
completion of these projects, the poor area economy stalled,
resulting in no further construction until 1990.
In September 1990 new owner- developers, Marina Vista, Inc.,
approached the City to amend the Master Development Plan of the
Application for Development Approval ( ADA) to downgrade the
intensity of the project to include 120 residential condominium
units, 150 hotel units, a 121 slip marina and supporting
commercial uses including 9, 100 square feet of sit- down restaurant
and 2, 800 square feet of fast food restaurant. This was
accomplished by Resolution 90- 30 on September 11, 1990 an amended
Development Order. That Development Order was found unacceptable
to the Florida Department of Community Affairs, and was
subsequently amended by Resolution 90- 34 on November 27, 1990 to
include a project build out date ( phasing) until December 31,
1993, and the DO remained in effect until March 12, 1995. In
addition to the DO revisions Sail- Away Bay Subdivision, a three
3) lot commercial subdivision was platted in the center portion
of the si.
te and the land was rezoned from DR- 4 Multi- family to
DC- 3 Community Commercial. The Olive Garden Restaurant was
developed on one lot in that development by the General Mills
i'
Corporation in 1991.
In June 1991, a new plan for the
development of Lot 3 was
submitted to the City for approval. Once again the ADA Master
Plan was revised and an amended Development Order issued in the
form of Resolution 91- 17. The DO now called for 120 condominium
units, a 121 slip marina, 9100 square of sit- down restaurant,
feet
2, 800 square feet of fast food restaurant and twenty ( 20)
residential townhouses. Again, no change was made in the DO
regarding the project phasing or the ten ( 10) year effective
date.
The developer came before the City in June 1995 to exercise
owner/
his option to apply for an extension to the duration of the DO.
The City Council through the adoption of Resolution 95- 16 extended
the build out date of the project until March 12, 1998. This
action amended the land use types allowed on the last remaining
parcel of undeveloped property in the development to include
certain commercial uses which were considered compatible with the
existing DRI development rather than a fast- food restaurant.
The process of approval for a proposed change includes the
evaluation of the applicability of numerous criteria, called
thresholds, specified in Florida Statutes. The impact of
major/ minor changes in the master plan for development are
considered. These criteria are enumerated in Section 380. 06 ( 19),
c Florida Statutes entitled " Substantial Deviations".
Page 4
Pirates' Bay
0
Nov. 1, 1996
DRI means any development which because of its character,
c magnitude
the health,
or location, would have a substantial effect upon
safety or welfare of citizens of more than one
county. Staff is not aware of any issue of regional impact
not previously reviewed by the WFRPC or of any additional
regional impacts which would result because of the request to
add bulkheads to the Project' s Master Plan.
19)( b) Any proposed change
to a previously approved
development of
regional impact or development order
condition which, either individually or cumulatively with
other changes, exceeds any of the following criteria shall
constitute a substantial deviation and shall cause the
development to be subject to further
development- of- regional- impact review without the necessity
for a finding of same by the local government:
1. An increase in the number of