READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — January 19, 2016 — FWC Grant — reading text
Part 9 of 14. These parts divide the reading text for browsing; they are not the source document's page numbers.
FWC Grant — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
is
constructed within the permitted area and at the designated center point locations of each
permit area. The COMMISSION will not pay for materials used in construction of a patch
reef that do not meet the minimal navigational clearance requirements as described in the
U.S. Army Corps of Engineers regulatory permit conditions for the respective permit areas.
Precise depth measurements during construction are important to insure the reef is
constructed within the permitted navigational clearance.
9. The GRANTEE's Project Manager or GRANTEE's designated official observer shall
remain on site during the entire deployment phase of the operation and confirm the GPS
coordinates of the individual artificial reef placements as well as the maximum vertical
relief of the constructed reefs using a fathometer after the reef construction has been
completed.
10. Both the GRANTEE and its contractor shall have on site current nautical charts of the
deployment areas, with the permitted Fish Haven areas indicated on the chart. The
proposed patch reef coordinates and the corner coordinates of the reef sites will also be in
possession of the GRANTEE's observer and the contractor when on site. The
GRANTEE's observer shall also be in possession of a copy of the Army Corps permits
for the areas where the deployments are taking place. The GRANTEE shall be
responsible for insuring that all permit condition terms are complied with.
ALLOWABLE EXPENDITURES ASSOCIATED WITH THE REEF PROJECT
11. Funds from this Agreement may be expended on the activities listed pursuant to Chapter
68E-9.004(1) (a), F.A.C. No more than $5,000 or 10% (whichever is less) of project
funds granted under the program may be expended for ‘engineering services’. Any funds
required in excess of this amount must be provided by the applicant. See Chapter 68E-
9.004(1) (a), F.A.C. for the complete list of eligible activities.
12. If the GRANTEE chooses to conduct a post-deployment SCUBA assessment at the
deployment location(s) (this is not required, but is an eligible activity for reimbursement
under Chapter 68E-9.004(1)(a), F.A.C.), in order to be eligible for reimbursement, work
Version 1.0 – June 2013 Attachment A, Page 4 of 12
Attachment A – SCOPE OF WORK
Project Name: Okaloosa County Artificial Reef FWC Agreement No. 15274
Construction 2016-17
must be completed prior to the grant expiration date and the following items, at a
minimum, must be included:
a. Methods: name and type of vessel, anchored or live boated, type of GPS unit(s),
divers, survey methods;
b. Conditions: cloud cover, wind speed and direction, sea conditions, visibility, water
temperature, currents;
c. Chronology: dive plan, start and end of each dive, dive profile, maximum depth,
dive time, distance and bearing searched;
d. Coordinates: Describe the GPS unit(s) used to navigate to the site (model number).
Describe whether differential or WAAS coordinates were recorded. Compare the
dive locations to deployment location numbers. How well do they match the
published numbers?
e. Physical observations: Describe the number and size of material observed. What
is the proximity of concrete pieces and pre-cast units to each other? What percent
material was damaged or partially damaged as a result of the material transport and
deployment process? Are there material outliers dropped away from the patch reef?
What is the maximum and minimum relief of the site? How do these observations
compare to the Material Placement Report Form information submittal?
f. Footprint area: Measure the approximate total area covered by each patch reef
through standard in situ survey practices.
g. Biological observations: Describe any fishes observed, or other general biological
observations.
h. Video and photographs: Provide representative still and/or video footage of each
deployment location (digital format preferred when available).
LIABILITY AND RESPONSIBILITY FOR REEF MATERIALS
13. Upon initiation of the handling and movement of these artificial reef materials by the
GRANTEE's contractor, all liability, risk of loss and responsibility for the safe handling,
storage, transportation and deployment of the materials shall be borne by the contractor.
This liability, assumption of risk and responsibility shall remain with the contractor until
the materials are deployed at the permitted reef site in accordance with the specifications
in this Agreement.
B. BACKGROUND
Chapter 379.249 Florida Statutes creates the Florida Artificial Reef Program to enhance
saltwater opportunities and to promote proper management of fisheries resources associated
with artificial reefs for the public interest. Under the program, the COMMISSION may
provide grants and financial and technical assistance to coastal local governments, state
universities, and nonprofit corporations qualified under s. 501(c)(3) of the Internal Revenue
Code for the siting and development of artificial reefs as well as for monitoring and evaluating
such reefs and their recreational, economic, and biological effectiveness. Chapter 68E-9
Florida Administrative Code defines the procedures for submitting an application for financial
assistance and criteria for allocating available funds. The purpose of this rule is to govern the
development of state and federally funded artificial reefs, the review and ranking of project
Version 1.0 – June 2013 Attachment A, Page 5 of 12
Attachment A – SCOPE OF WORK
Project Name: Okaloosa County Artificial Reef FWC Agreement No. 15274
Construction 2016-17
applications eligible for funding, and the administration of funds from the Florida Artificial
Reef Program.
This artificial reef construction project was selected for funding by the COMMISSION based
upon ranking of competitive applications submitted to the Artificial Reef Program pursuant to
the criteria for allocating funds described in Chapter 68E-9, Florida Administrative Code.
C. SUPPORT OF COMMISSION MISSION
Construction of these artificial reefs will create marine hard bottom habitat with well-planned
stable and durable artificial reefs for purposes of providing marine reef fish habitat, marine
recreational fishing and diving opportunities, and reduced user conflicts by providing
additional recreational fishing and diving locations within state waters off Okaloosa County.
The proposed artificial reefs will make marine fisheries resources available for the long term
benefit of local Florida residents and visitors.
D. DEFINITIONS
The terms and abbreviations used herein shall have the meanings as defined below.
i. “Artificial reef” means one or more manufactured or natural objects intentionally
placed on the bottom in predominantly marine waters to provide conditions believed
to be favorable in sustaining, or enhancing the spawning, breeding, feeding, or growth
to maturity of Florida’s managed reef associated fish species as well as to increase the
productivity of other reef community resources which support fisheries. Included in
this definition are artificial reefs developed with one or more of the following
additional objectives: enhancement of fishing and diving opportunities, fisheries
research, and fisheries conservation/preservation purposes.
ii. “Permitted area” means an area with discrete boundaries inside of which one or more
artificial reefs may be located and for which all required permits and authorizations
have been obtained. These active permits and authorizations include: artificial reef
permits issued by the Florida Department of Environmental Protection and/or the
Army Corps of Engineers and other permits, licenses, or authorizations required by
any governing body.
iii. “Staging area” means a land-based holding area for artificial reef material where such
material is stored and prepared for transportation to an approved artificial reef site.
2. DELIVERABLES
A. Deliverable #1 (Artificial Reef Construction)
Construction of two marine artificial reefs by loading, transporting and deploying the
maximum tonnage of COMMISSION approved GRANTEE donated intact concrete culverts,
and Eglin Air Force based donated concrete or concrete and steel pre-cast target materials
procured through a COMMISSION reviewed competitive bidding process to select a qualified
subcontractor reviewed by the COMMISSION. No more than $60,000 in available
Version 1.0 – June 2013 Attachment A, Page 6 of 12
Attachment A – SCOPE OF WORK
Project Name: Okaloosa County Artificial Reef FWC Agreement No. 15274
Construction 2016-17
COMMISSION funding and $67,000 in GRANTEE funding is available for this project. The
selected reef material will be deployed to create two individual patch reefs of approximately
equal tonnage. One patch reef will be constructed at the center point of each of two permitted
areas known as Fish Havens 15 and 16 in state waters of the Gulf of Mexico off Okaloosa
County, Florida. Patch reef center point locations are indicated in Paragraph 6, Table 1. Each
of the two patch reefs will consist of artificial reef materials placed as a single pile within the
permitted reef areas. The size and configuration of patch reefs deployed will depend on the bid
prices received with bid selection based on the lowest cost per ton of material proposed for
transport from material staging areas and subsequent offshore deployment at the designated
artificial reef locations as well as the availability of acceptable reef materials. At least 80% of
the individual concrete units loaded onto the deployment vessel for each deployment trip will
weigh a minimum of 1,000 pounds. No more than 20% of the individual concrete units or
concrete rubble pieces loaded on the deployment vessel will weigh less than 1,000 pounds but
not less than 500 pounds. No individual concrete rubble pieces weighing less than 500 pounds
