READ ALONGSIDE THE SOURCE
Fort Walton Beach Council minutes — 12-19-2000 Special — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-3429-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
87
r.~} ". ,
TIll!
QfW.-
CmQf_ ~~:
19;'" . .' ---.. -
t ;" ':' '.':.. ;:' , :
i" , ...,-. --'.. .' ',' -, ,- {.. .....',....
A Special Meeting of the City Council of Fort Walton Beach, Florida, was held on Tuesday, December 19,
2000, at 5:30 p.m. in the Council Chambers at City Hall with the following members present
I
Mayor Glenda Glover
Councilmen: Clay Carnathan, Janet Baggett, Jim Dowling, Jim Tucker, Dean Covey, Chuck Kelley, and
Margie Collins
Also Present: Reid Silverboard, City Manager; Helen Spencer, City Clerk; Joyce Shanahan, Finance
Director; Charles W. Turner, Project Manager; Department Directors; Media
cALL TO ORDGj
The Mayor called the meeting to order to review the Design Development plans of the
library.
JoISIGN,DIVI.1ONINT~"' U1Sbb1
John Bozarth, architect with Harvard Jolly Clees Toppe, advised he would discuss the drawings and the
budget of the library and take comments from Council during the presentation.
Discussion ensued regarding the possibility of
running a sewer line underneath the library to service the
adjoining car wash and law office and the feasibility of rerouting the service to Florida Place; narrowing
the lanes in the parking lot and adding entrance and exit
signage; the location of the retention pond and
water quality vs. quantity; the use of wood trusses in raised roof area; and
saving costs on the north
tower.
Further discussion included glass/ windows in the Friends' Store; the cable connection into the
meeting
for the satellite feed; exterior and interior
room
lighting; the use of impact resistance glass in lieu of
shutters on clere story; and the feasibility of having a clock in the tower.
Mr. Tucker left the meeting at 6: 20 p.m.
Robert Blythe of Blythe Engineering discussed the use of
fogger mist heads and a wet pipe system rather
then sprinklers throughout the building, and having separate controls for the thermostat in the
conference/ meeting room.
Landscaping for the courtyard/ public plaza was discussed as well as an easement for landscaping on the
southwest side of the library.
Mr. Bozarth advised that the project is within
budget at this time.
The City Manager advised he needed a motion from Council to
approve the design and development
I plans authorizing the architect to proceed with the construction documents.
Council briefly reviewed their main issues of concern
understood the direction they would like him to follow.
previously discussed and felt that Mr. Bozarth
Mrs. Collins moved to approve the
design and development plans and to authorize the architect to
proceed with the construction documents. Motion was seconded by Mrs. Baggett and carried
unanimously with Carnathan,Baggett, Dowling,Covey, Kelley, and Collins in favor f(ucker absent).
