Fourth Street The theme of Uptown Station will be used for the street lights. This
is the Eglin Parkway neighborhood.
ANALYSIS:
A request for proposals was issued in March, 2003. Only one response was received which is
Schmidt Dell Assoc. Since they were the only respondent, their references were checked and
were satisfactory. Staff has met with them and
they provided a scope of work which is
attached as Exhibit 1. They have divided the project into two phases, the first phase will be the
Master Plan and the second phase will be production of the construction documents based on
the proposed Master Plan. The construction documents may be broken into several different
projects and shall coordinate the requirements of the multiple utility modifications and phasing.
The budget and phasing may require that the construction be implemented over several years.
The actual utility modifications will be preformed by the individual utility companies. The
engineering design fees shall be established based on the phasing and construction values
determined during the Master Plan ( Phase 1).
Their fee for the first phase will be $53,829. The second phase will be to produce construction
documents based on the proposed Master Plan.
Phase 1: Master Plan will consist of:
1. Topographic Route Survey along Eglin Parkway between Hughes and Fourth S1.;
2. Interaction with power, cable TV and telephone companies;
3. Preliminary lighting layout with construction estimate
4. Phased construction plan to account for the utility relocation and budget restraints;
5. Report on requirements for individual properties along Eglin Parkway; and
6. Monthly meetings for at least six months.
Jt- C'--
fi Y
06- 2004( TUE) 08: 09 SCHMIDT DELL ASSOCIATES. INC. FAX) 850 432 8631 P. 001/ 002
January 5, 2004
Paul Zimmerman, P. E.
City Engineer ,
CitY of Fort Walton Beach
I ~..: i P. O. Box 4009
Fort Walton Beach, FL 32549,
P~ N5ACOlA OffiCE:
13'1 r Ar.T GCJvrr.NMrNT r..
rnrrr
N: N5.\ COI..\
fLORlCA 3~ 50~
I', IU~ OI4JU (JOjO
F: 1~~ OI 432-81.. 3 I
RE: Engineering Services for Eglin Parkway Lighting Master Plan
91l0XI OFFICE:
2/ 10 ~ c...
CH ~ [ . $ IJm l)
OIJLEVAP.1 l\
MI5~,I~,:. JPrl ~'
AIInx\. 1
Dear Paul,
nn) 360.9527
r: { 22UI JUU,>,
jJ4
I have reviewed the project requirements and suggest we perform a two phase
DAI'HNo OfFICE:
approach to the above referenced project. , We have enough information now to
uo~ ~ L1AI'HNt AVtNUt develop the engineering fees for the first phase ( Master Plan). The second
1'.0. aO)i 2246
DAPI INr, M?t, ~
AIAflAM'<'
phase engineering fees will be established after the total scope of work can be
1'$ 11 625. JOOJ identified during the Master Plan.
r; { 2jI162~ 0020
The Master Plan scope is as follows:.
1. Perform a Topographic Route Survey along Eglin Parkway beginning at
Forth Street and ending at Hughes Street. The survey shall include a
complete location of all improvements. pavement, driveways. utilities, etc.
within the full width of the Eglin Parkway right- of-way to include ten feet
beyond each side of 'the right- of-way ( fee breakdown - $ 21, 729 base
rate). The survey fee is a pass- through for our firm with a 15% adder for
administration and management. Baskerville Donovan is the company
being proposed to perform the survey work. There are several properties
that are farther off the right-of-way than the 10' allowance. These
properties will have to be addressed indviua!ly with the City whether or
not they will be impacted by the utility relocation. If additional surveying is
required, it could be performed by the City or as an add service ( hourly) to
above proposal. Eglin Parkway is a very busy corridor and the proposal
could be impacted by restrictions on access or requirements for flag or
police personnel. The basic survey will be as follows:
a. HorizontalDatum shall be based on the Florida State Plane
Coordinate System. Vertical Datum shall be based on NGV
Datum of 1929.
b. The survey shall be performed in accordance with the Minimum
Technical Standards set forth by the Florida Board of Professional
Surveyors and Mappers in Chapter 61 G17 -6, Florida
Administrative Code. pursuant to Section 472. 027, Florida
Statutes.
c. The survey win be prepared in AutoCAD 2000 format. Five ( 5)
certified copies of the survey along with a digital file on disc will be
submitted to the City.
MeCHANICAL · tLt:CTRICAL · COMMUNICAIION~ . INou~ rRIAL. STRUCTURAL
4CTUE) 08: 09 SCHMIDT DELL ASSOCIATES. INC. FAX) 850 432 8631 P. 002/ 002
PAGE 20F 2
2. Perform interaction with power, cable TV and telephone companies.
Work out solution ;and cost estimate for associated work. ( fee breakdown
5,400)
3. Provide preliminary lighting layout with construction estimate. Lighting
layout to meet minimum FDOT light level requirements. ( fee breakdown -
12, 000). .
4. Provide a phased construction plan to account for the Utility relocation
and budget restraints. ( fee breakdown - $ 3, 600)
5. Provide report on requirements for individual properties along Eglin
Parkway. Report to include photos of property, utility requirements, and
construction opinion. ( fee breakdown - $ 7,500)
6. Meetings to be billed at standard hourly rates. I would budget monthly
meetings for at least six months at foor hours/ meeting. ( fee breakdown -
3, 600). Actual fee to be adju$~ed to account for specific requirements.
Total Phase I ( Master Plan) Engineering Service Fee - $ 53,829.
The next phase will be to produce construction documents based on the
proposed Master Plan. The construction documents may be broken into several
different projects and shall coordinate the requirements of the multiple utility
modifications and phasing. The budget and phasing may require that the
construction be implemented over several years. The actual utility modifications
will be' performed by the individual utility companies. The engineering design
fees shall be established based on the phasing and construction values
determined during the Master Plan ( Phase I).
Please feel free to call me if you would . like to discuss any portion of this
proposal. I am excited to be associated with the City of Fort Walton Beach on
such a high profile endeavor and look forward working with you and your staff.
Respectfully Yours,
SCHMIDT DELL ASSOCIATES. INC.
H. L.Dell, P. E.
Senior Vice President
CITY COUNCIL MEETING
MARCH 9, 2004
PUBLIC HEARING
Consideration of Ordinance 1576 amending Chapter 20 Land Development Code-
nonconfonning uses.
Second Reading
Municipal Planning Board Recommendation: Approval 6- 0 ( 2/ 5/ 04)
Agenda Item No. - PH 5
1 ORDINANCE 1576
2
3 AN ORDINANCE OF THE CITY OF FORT WALTON BEACH, FLORIDA;
4 PROVIDING FOR AUTHORITY; AMENDING CHAPTER 20. LAND
5 DEVELOPMENT CODE, ARTICLE III. ZONING,