BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: STORMWATER
PROGRAM DESCRIPTION: The Stormwater Division of Public Works provides stormwater construction,
solutions to failures, maintenance tasks, and storm recovery and restoration. The division also develops future
funding needs list, develops Best Management Practices (BMPs), managaes data and associated reports to
maintain compliance with National Pollutant Discharge Elimiation System (NPDES) requirements to prevent
sanctions from the State. Additionally, staff provides support services for the Public Works work order system.
REVENUE: Stormwater Division is funded within the County Transportation Trust Fund. Supporting
revenue of the County Transportation Trust Fund (CTTF) is fuel taxes, intergovernmental revenue, charges for
services, miscellaneous revenue and transfers. Supporting revenue of the CTTF are gas taxes and local option
gas tax (LOGT), constitutional gas taxes (CGT) and federal and state shared revenue, state and federal grants,
and an annual allocation of revenue from the general fund. Total funding for FY13 was $400,000 from all
funding sources. Unexpended funding pledged in previous years has remained in the Stormwater budget as
available cash which has provided funding to support operations and maintenance costs which now totals
$800,000 per year. These funds are depleted to critical levels by ever increasing stormwater needs and
operational costs.
EXPENDITURES:
Expenditures Budget
FY11 FY12 FY13 FY14
Category Actual $ Actual $ Original $ Approved $
Personal Services 428,929 433,495 444,085 500,653
Operating Expenses 171,499 239,146 292,479 335,168
Capital Outlay 303,971 28,845 366,00 617,446
Reserves 0 0 0 0
Total 904,399 701,486 1,102.564 1,453,267
HISTORICAL STAFFING SUMMARY:
Category FY11 FY12 FY13 FY14
Full-time 5 4 4 4
Part-Time 0 0 0 0
Relief 0 0 0 0
Total 5 4* 4 4
* FY12 Moved an existing Road Division Foreman, and two existing Road Division Light Equipment Operators
(for Stormwater retention pond maintenance) to the Stormwater budget at 50/50 salary split. No new positions.
MAJOR ACCOMPLISHMENTS LAST YEAR:
Keyser Mill Road – Installed stormwater system at intersection of Galiver Cut-Off for dirt to pave project
Pocahantas Drive – Replaced failing stormwater pipe
West Plympton Road – Replaced all cross drains and head walls
Lake Ella Road – Installed pipe and headwalls at new bridge
Tanglewood Pond – Replaced failing stormwater overflow structure
Monahan Drive – Replaced failing stormwater pipe, new inlet, and conflict box
Ag Extension Building – Constructed stormwater system, formed & poured sidewalks
Hidden Springs – Replaced failed stormwater pipe
#5 Bay Cove Lane – Replaced failing stormwater pipe and outfall structure
Woodland Street – Replaced failing cross drain and headwall
Tommie Steele Road – Installed 48” pipe and repaired dam
6th Street, Shalimar, from 5th Ave to 6th Ave – Replaced failing stormwater pipe
Provide technical support for work order process for Public Works.
Maintaining a database system detailing the size, type, and location of all stormwater features owned and
maintained by Okaloosa County.
Assimilated and managed data related to 727 storm structures and 118 stormwater basins into the
infrastructure database.
Logged 2384 instances of sediment removal totaling 37,144 cubic yards for NPDES permit compliance.
(Now tracking more efficiently by load tickets.)
PROGRAM GOAL:
The primary goals of the Stormwater Division are to construct, maintain and catalogue the stormwater
management systems to minimize the potential for flooding and improve water quality runoff throughout
Okaloosa County.
KEY OBJECTIVES:
1. Complete stormwater management infrastructure improvement projects to reduce flooding potential and
improve discharged water quality.
2. Continue to research alternate funding sources such as a Stormwater Utility, MSTU, State Revolving Fund
loans.
3. Provide data and reporting for NPDES permit compliance review. Prepare new Notice of Intent. (Due early
2014.)
4. Complete update to Stormwater Master Plan.
5. Record information related to site inspections and enforcement actions
6. Provide adequate training to survey and drafting staff in order for all created data to be compatible with
existing policies and procedures.
7. Create visual aids (maps) for use by the Board of County Commissioners, County staff, and the general
public related to County activities and projects.
8. Provide technical assistance throughout Public Works to ensure the quality and compatibility of all aspects
of stormwater data collection and storage.
9. Maintain the drainage structures in an open and flowing condition.
10. Mow stormwater retention ponds twice per growing season.
11. Provide solutions to catastrophic stormwater failures.
12. Support/Research Emergency Watershed Grant Projects.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY11/12 FY12/13 FY13/14
Number of Full-Time Equivalents (FTEs) 11 11 14*
Input
Salaries & Operating Expenditures $1.5M $1.5M $890,411
Catastrophic Stormwater Repairs Cost (Materials only) $51,444 $66,922 $100,000
Stormwater maintenance/projects tracked (now by Work
15 450 400**
Orders)
Output
Tracked and notated information related to site inspections 74 41 60
Stormwater structures located, identified, assessed, to date 530 727 800
Retention Ponds Maintained 88 118 130
Personnel trained in Stormwater, Erosion and
12 15 18
Efficiency
Sedimentation Control
Best management practices reviewed for efficiency 3 2 2
NPDES Review 1 1 1
Effectiveness
Catastrophic stormwater repairs tracked 15 24 30
Footage of stormwater pipe slip lined (proactive repair) 1053 300 500
*No new employees. Moved a Foreman, and 2 Light Equipment Operators to Stormwater with a 50/50% salary
split with Road Division.
**Track all stormwater maintenance/projects by work order.