August 4, 2015

Okaloosa County BOCC — August 4, 2015 — past Agenda Request 02.19.2013

past Agenda Request 02.19.2013 in the August 4, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the August 4, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1275). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used July 7, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
past Agenda Request_02.19.2013
Date
August 4, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

past Agenda Request 02.19.2013 — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 4.9 KB · 2

Download ↓

past Agenda Request 02.19.2013 — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 42.7 KB · 2

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

past Agenda Request 02.19.2013 — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: February 19, 2013 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Polyengineering Task Order 122 DEPARTMENT: Water and Sewer BCC DISTRICT: 1, 2 & 3 STATEMENT OF ISSUE: The scope of services for this task order includes professional engineering and technical services required to design and permit a new force main from the East County Repump Station to the Eglin Main Base Sewer Pump Station. This project, in conjunction with the above-mentioned stations, will divert East County/Bluewater Bay wastewater flow from the old Niceville Valparaiso Regional WWTF, and transmit it to the new Arbennie Pritchett Water Reclamation Facility (APWRF). The Scope of Work for this task order has been developed and negotiated with Polyengineering per the terms of our Master Services Agreement to perform these services and requires approval by the Board of County Commissioners. Task Order 122 is attached for your review. BACKGROUND: In July of 2009, OCWS entered into a Memo of Understanding with Eglin Air Force Base (Eglin) to upgrade the 7th Special Forces Group (7SFG) force main in order to accommodate future wastewater flows from Duke Field, Camp Rudder, and Eglin Main Base. In the September of 2012, OCWS entered into a contract with Eglin to treat the wastewater from Eglin Main Base and to construct the necessary infrastructure to transmit the wastewater to APWRF. Included in this scope of work is for OCWS to design and construct a new sewer pump station near the Main Base WWTP (at the Northwest Gate). This pump station will transmit the Base's wastewater to the 7SFG force main, ultimately leading to APWRF. Following construction, the new Main Base Sewer Pump Station will be owned and maintained by OCWS. As a result of negotiations of the contract, Eglin allows conveyance of the wastewater from the East County/Bluewater Bay Service Area to the Main Base Lift Station. The cost to upsize the new sewer pump station in order to accommodate East County flows is borne by OCWS. The agreement allows OCWS to reduce the total force main footage required to convey wastewater to the APWRF as well as reduce the horsepower requirements needed for pumping. The benefit of this arrangement for Eglin AFB is that it reduces the size of the easement and it eliminates potential conflicts with possible future runway construction. In April of 2012, OCWS entered into an interlocal agreement with the City of Niceville and City of Valparaiso to transfer its ownership and treatment capacity at the NVOC Regional Wastewater Treatment Plant to the City of Niceville. As part of this agreement, OCWS transferred its cost sharing responsibility of the NVOC facility, and will divert of all of the flows from the East County/Bluewater Bay Service Area to the APWRF. As part of this planned diversion of flow, OCWS would need to construct a new sanitary sewer force main and repumping station to convey its flows to the APWRF. The proposed East County Repump Station is shown as Phase 9 on the attached East County Master Sewer Plan (labeled as "Proposed College Blvd Lift Station"). The sanitary sewer force main is shown as Phase 10. Note that Eglin has agreed to the alternate route for Phase 10, which allows for the alignment of the force main into the Eglin Main Base Sewer Pump Station (Phase 5). OCWS has budgeted $4.5M in FY2012-2014 for the above-mentioned force main (Phase 10), repump station (Phase 9), and upsize to the Eglin Main Base Lift Station (Phase 5). This $4.5M is funded from the $15M 2012 bank loan. Similar to the approach chosen for the design of the 7SFG force main and sewer pump station, OCWS is proposing for Constantine Engineering to design the repump station and Polyengineering to design the force main. For a project this large and complex, we feel

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — August 4, 2015 — past Agenda Request 02.19.2013.” August 4, 2015. past Agenda Request_02.19.2013. Crypt of Echoes evidence ID LED-2026-dda8f11b21034fe5ac95bf29e6c5997f. http://127.0.0.1:58097/evidence/LED-2026-dda8f11b21034fe5ac95bf29e6c5997f. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, past Agenda Request 02.19.2013, meeting materials for August 4, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=8887&MeetingID=1275

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓