door and lights for plumbing chase between bathrooms -
Cost $ 535. 00 + 10 % GC.
facilitate maintenance access for the auto flush valves and plumbing.
Recommend approval.
to meet roof manufacturers
Item 4. Steel support at sun shades. This additional support is necessary
requirements. Cost $ 800 + 10% GC. Recommend approval.
involves in slab adjustments to
Item 5. Additional Electrical for book security system - This change
accommodate the book security system selected. Costs $ 190 + 1 0% GC. Recommend approval.
specific
is necessary to provide adequate
Item 6. Structural support of brick at South Tower - This change
Cost $ 1505 + 1 0% GC. Recommend approval.
support which was left off the original drawings.
relates that the flashing is included in a previous
Item 7. Step flashing at South tower - The architect
of this item.
change order and does not recommend approval
the fire alarm panel from inaccessible
an
Item 8. Electrical revisions - This change includes moving
location in the equipment room to behind the service desk and the relocation of numerous power outlets,
and fixtures selected and to
communication jacks and television jacks to accommodate the furniture
10% GC. Recommend approval.
correct oversights in the original drawings. Costs $ 4932 +
valves, etc were left
Item 9. Electrical for lavatory sinks, toilets, etc.- Power for all the automatic flush
off the original drawings. Costs $ 1150 + 10% GC. Recorrunend approval
included in the original
Item 10. Mounting cabinets and variable speed motor controllers. - This item is
specifications. Not recommended by the architect.
The architect does
Item 11. One week additional supervision. - The remarks of the architect pertain.
not recommend approval..
In addition, Change Order Number 7 includes a cost of$ 1130 for removing
felt under a portion
ofthe metal roof. That work was not accomplished. The architect recommends that the next AlA issued
Change Order deduct this cost :trom the contract.
the
The changes and requests, as stated in the attached correspondence and as modified by
architect appear to be consistent with work completed.
RECOMMENDATION:
21 to include items or
It is recommended that Council approve Change Order Request Number
as recommended by the
portions of numbers 1, 2, 3, 4, 5, 6, 8, and 9 in an amount not to exceed $ 13, 904
architect thereby increasing the construction budget by that amount.
Respectfully submitted,
c~
Project/ Construction Manager
cwt: CWT
Page 2
Iii
January 22, 2002
Mr. Charlie Turner, Project Manager
HARVARD City of Fort Walton Beach
JOllY P. O. Box 4009
CLEES
TOPPE Fort Walton Beach, Florida 32549
e_
ARCHITECTS, P.A.
A I A
RE: Contractor' s Request for Change Order # 21
Dear Charlie,
Directors
R. John Clees. / IJA Please find attached Group VI's Request for Change Order #21, dated 1/21/ 02, with associated
Jeffrey E, Cobble, / IJA
William B. Harvasd, / IJA
back- up material. My recommendation for each item is noted below.
Steven M. Helser. AlA
Blanchard E. Jolly, /IJA
lames A. Shawhan, AJA 1. Grate at entry doors Add $ 2845 + 10% GC
Jonathan R.Tappe, /IJA
This is an Owner requested item to reduce dirt tracked into the library. I believe this cost
to be reasonable and recommend approval for inclusion in the project.
2. + 3. Provide access door and lights at plumbing chase Add $ 535 + 10% GC
This is an Owner requested item to provide ease of accessibility for future maintenance. I
believe this cost to be reasonable and recommend approval for inclusion in the project.
4. Steel support at sun shades Add $ 800 + 10% GC
This is required to meet the spacing requirernents of the roof manufacturer. At the time the
drawings were completed, the roof manufacturer was unknown as several are listed in the
specifications. I recommend approval of this work.
5. Additional electrical for Book Security System Add $ 190 + 10% GC
This is an Owner requested item. I believe this cost to be reasonable and recommend
approval for inclusion in the project.
6. Structural support of brick at south tower Add $ 1505 + 10% GC
Additional support was required for the brick along the north face of the south tower. Our
structural engineer worked out the additional requirements in the field and has reviewed
this cost. I recommend approval of this work and inclusion in the project.
7. Step flashing at south tower Add $ 1250 + 10% GC
It is my understanding that the step flashing is included in the previous Change Orders for
roofing work as it relates to details
provided by Williamson & Associates. I do not
Ft. Myers
recommend approval of this item.
Orlando
Panama City
St.Petersburg
8. Electrical revisions as per Proposal Request # 4 Add $4932 + 10% GC
Tampa
This includes relocation of the fire alann panel and additional data outlets requested by the
451 Magnolia Ave, Owner. The electrical engineer has reviewed this item and I recommend approval of this
Panama City, FL
3 2 4 0 1 work.
850/ 7691815
AA C000119
9. Electrical for lavatory sinks, toilets, etc. Add $ 1150 + 10% GC
The engineer has reviewed this cost. I recornmend this item be approved as a not to exceed
cost.
Contractor' s Request for COR #21
January 22, 2002
Page 2 of2
10. Mounting cabinets and variable speed motor controllers Add $2250 + 10% GC
In a merno to Group VI dated 12/ 6/ 01, our office noted that the mechanical contractor is
responsible for the controllers and their installation. The memo also noted that the electrical
specifications state that the electrician is responsible for providing connections to all
equipment furnished under other sections. I do not recommend approval of this item.
11. One week additional supervision Add $ 1500 + 10% GC
I do not see where any of these items would require one week' s additional time on top of
the time extension being considered as part of the watertightness change order request. I
do not recommend approval of this item.
In addition, Change Order Number 7 included a cost of$ I, 130 ( including the 10% GC mark- up)
for removal of the felt at the portion of the building to receive metal roofing.
The new ice and water shield was installed over the felt. I recommend that the next AlA issued
Change Order deduct this cost from the contract.
Recommended items for approval:
1 2, 845
2, 3 535
4 800
5 1, 900
6 1, 505
8 4, 932
9 1, 150
TOTAL 13, 667
1, 367 10% GC
TOTAL ADD 15, 034
DEDUCT 1, 130
TOTAL RECOMMENDED
FOR APPROVAL 13, 904
If you have any questions regarding these recommendations, please do not hesitate to call me.
Thank you.
Sincerely,
NCARB
cc: Toby Tillem, Group VI (w/ o enclosure)
Enclosure
SERVER5V\ OLl \ WPDAT A \00- 555 FWB Library\ Corespondec\2002\ Owner\ 0 l2202Ie- tumer- COR# 21- recommendations. doc
REQUEST FOR CHANGE ORDER
GROUP VI CORPORATION
900 Westpark Drive # 300
Peachtree. City, GA 30269
PH: 770- 389- 9100
FX: 770- 631- 7279
Date: 1/ 21/ 02
CHANGE ORDER REQUEST#: 21
PROJECT: Fort Walton Public Library
PROJECT NUMBER: # 3130
REQUESTED BY ( OWNER): City of Fort Walton Beach
SUBMITTED BY ( G. C): Group VI Corporation
DESCRIPTION
1. Provide walk off mat & related concrete work as indicated. Add $ 2, 845
2. Provide access door at plumbing chase as indicated. Add $ 270
3. Provide lighting & circuit inside plumbing chase as indicated. Add $ 265
4. Provide steel bracing & support on the awning frames as Indicated. Add $ 800
5. Provide under slab electrical for book detection system. Add $ 1. 900
6. Provide structural support for brick at the tower. Add $ 1 . 505
7. Provide step flashing & re- install brick on back of towers / columns. Add $ 1 , 250 .
8. Provide