door and lights for plumbing chase between bathrooms - Cost $ 535. 00 + 10 % GC. facilitate maintenance access for the auto flush valves and plumbing. Recommend approval. to meet roof manufacturers Item 4. Steel support at sun shades. This additional support is necessary requirements. Cost $ 800 + 10% GC. Recommend approval. involves in slab adjustments to Item 5. Additional Electrical for book security system - This change accommodate the book security system selected. Costs $ 190 + 1 0% GC. Recommend approval. specific is necessary to provide adequate Item 6. Structural support of brick at South Tower - This change Cost $ 1505 + 1 0% GC. Recommend approval. support which was left off the original drawings. relates that the flashing is included in a previous Item 7. Step flashing at South tower - The architect of this item. change order and does not recommend approval the fire alarm panel from inaccessible an Item 8. Electrical revisions - This change includes moving location in the equipment room to behind the service desk and the relocation of numerous power outlets, and fixtures selected and to communication jacks and television jacks to accommodate the furniture 10% GC. Recommend approval. correct oversights in the original drawings. Costs $ 4932 + valves, etc were left Item 9. Electrical for lavatory sinks, toilets, etc.- Power for all the automatic flush off the original drawings. Costs $ 1150 + 10% GC. Recorrunend approval included in the original Item 10. Mounting cabinets and variable speed motor controllers. - This item is specifications. Not recommended by the architect. The architect does Item 11. One week additional supervision. - The remarks of the architect pertain. not recommend approval.. In addition, Change Order Number 7 includes a cost of$ 1130 for removing felt under a portion ofthe metal roof. That work was not accomplished. The architect recommends that the next AlA issued Change Order deduct this cost :trom the contract. the The changes and requests, as stated in the attached correspondence and as modified by architect appear to be consistent with work completed. RECOMMENDATION: 21 to include items or It is recommended that Council approve Change Order Request Number as recommended by the portions of numbers 1, 2, 3, 4, 5, 6, 8, and 9 in an amount not to exceed $ 13, 904 architect thereby increasing the construction budget by that amount. Respectfully submitted, c~ Project/ Construction Manager cwt: CWT Page 2 Iii January 22, 2002 Mr. Charlie Turner, Project Manager HARVARD City of Fort Walton Beach JOllY P. O. Box 4009 CLEES TOPPE Fort Walton Beach, Florida 32549 e_ ARCHITECTS, P.A. A I A RE: Contractor' s Request for Change Order # 21 Dear Charlie, Directors R. John Clees. / IJA Please find attached Group VI's Request for Change Order #21, dated 1/21/ 02, with associated Jeffrey E, Cobble, / IJA William B. Harvasd, / IJA back- up material. My recommendation for each item is noted below. Steven M. Helser. AlA Blanchard E. Jolly, /IJA lames A. Shawhan, AJA 1. Grate at entry doors Add $ 2845 + 10% GC Jonathan R.Tappe, /IJA This is an Owner requested item to reduce dirt tracked into the library. I believe this cost to be reasonable and recommend approval for inclusion in the project. 2. + 3. Provide access door and lights at plumbing chase Add $ 535 + 10% GC This is an Owner requested item to provide ease of accessibility for future maintenance. I believe this cost to be reasonable and recommend approval for inclusion in the project. 4. Steel support at sun shades Add $ 800 + 10% GC This is required to meet the spacing requirernents of the roof manufacturer. At the time the drawings were completed, the roof manufacturer was unknown as several are listed in the specifications. I recommend approval of this work. 5. Additional electrical for Book Security System Add $ 190 + 10% GC This is an Owner requested item. I believe this cost to be reasonable and recommend approval for inclusion in the project. 6. Structural support of brick at south tower Add $ 1505 + 10% GC Additional support was required for the brick along the north face of the south tower. Our structural engineer worked out the additional requirements in the field and has reviewed this cost. I recommend approval of this work and inclusion in the project. 7. Step flashing at south tower Add $ 1250 + 10% GC It is my understanding that the step flashing is included in the previous Change Orders for roofing work as it relates to details provided by Williamson & Associates. I do not Ft. Myers recommend approval of this item. Orlando Panama City St.Petersburg 8. Electrical revisions as per Proposal Request # 4 Add $4932 + 10% GC Tampa This includes relocation of the fire alann panel and additional data outlets requested by the 451 Magnolia Ave, Owner. The electrical engineer has reviewed this item and I recommend approval of this Panama City, FL 3 2 4 0 1 work. 850/ 7691815 AA C000119 9. Electrical for lavatory sinks, toilets, etc. Add $ 1150 + 10% GC The engineer has reviewed this cost. I recornmend this item be approved as a not to exceed cost. Contractor' s Request for COR #21 January 22, 2002 Page 2 of2 10. Mounting cabinets and variable speed motor controllers Add $2250 + 10% GC In a merno to Group VI dated 12/ 6/ 01, our office noted that the mechanical contractor is responsible for the controllers and their installation. The memo also noted that the electrical specifications state that the electrician is responsible for providing connections to all equipment furnished under other sections. I do not recommend approval of this item. 11. One week additional supervision Add $ 1500 + 10% GC I do not see where any of these items would require one week' s additional time on top of the time extension being considered as part of the watertightness change order request. I do not recommend approval of this item. In addition, Change Order Number 7 included a cost of$ I, 130 ( including the 10% GC mark- up) for removal of the felt at the portion of the building to receive metal roofing. The new ice and water shield was installed over the felt. I recommend that the next AlA issued Change Order deduct this cost from the contract. Recommended items for approval: 1 2, 845 2, 3 535 4 800 5 1, 900 6 1, 505 8 4, 932 9 1, 150 TOTAL 13, 667 1, 367 10% GC TOTAL ADD 15, 034 DEDUCT 1, 130 TOTAL RECOMMENDED FOR APPROVAL 13, 904 If you have any questions regarding these recommendations, please do not hesitate to call me. Thank you. Sincerely, NCARB cc: Toby Tillem, Group VI (w/ o enclosure) Enclosure SERVER5V\ OLl \ WPDAT A \00- 555 FWB Library\ Corespondec\2002\ Owner\ 0 l2202Ie- tumer- COR# 21- recommendations. doc REQUEST FOR CHANGE ORDER GROUP VI CORPORATION 900 Westpark Drive # 300 Peachtree. City, GA 30269 PH: 770- 389- 9100 FX: 770- 631- 7279 Date: 1/ 21/ 02 CHANGE ORDER REQUEST#: 21 PROJECT: Fort Walton Public Library PROJECT NUMBER: # 3130 REQUESTED BY ( OWNER): City of Fort Walton Beach SUBMITTED BY ( G. C): Group VI Corporation DESCRIPTION 1. Provide walk off mat & related concrete work as indicated. Add $ 2, 845 2. Provide access door at plumbing chase as indicated. Add $ 270 3. Provide lighting & circuit inside plumbing chase as indicated. Add $ 265 4. Provide steel bracing & support on the awning frames as Indicated. Add $ 800 5. Provide under slab electrical for book detection system. Add $ 1. 900 6. Provide structural support for brick at the tower. Add $ 1 . 505 7. Provide step flashing & re- install brick on back of towers / columns. Add $ 1 , 250 . 8. Provide

Download this text file with its original spacing ↓