READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 01-08-08 regular agenda — reading text

Part 17 of 17. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-15248-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

container, it must be serviced by a front loader system. Service may be by automated cans or dumpster. b. Automated cans must be able to be placed within 2 feet of the curb with at least 3 feet of clearance around each can and accessible to the right side of the truck. Automated cans must be stored in a location where they are screened from the street. c. A site for the dumpster must be shown on the plan at a location that provides easy access and departure of a garbage truck with no overhead lines in the vicinity of the pickup point. Contact Joe Menda or Jerry Gunn at ( 850) 833 -9654 to discuss specifics regarding the dumpster location. d. The dumpster must be screened from the street. The clearance through the gates of the enclosure shall not be less than 10 feet 6 inches. This must be specified on the plans. e. Public Works recommends that a concrete dumpster pad be provided to reduce ruts in the asphalt caused by the sanitation truck during pickups. A detail drawing of the dumpster pad will be provided at the DRC meeting. 4) Other Requirements a. Submit a set of Civil Site Improvement plans that show the proposed improvements. b. Submit a Stormwater management meets the City's stormwater regulations. Stormwater runoff from the entire site must be treated, including runoff from the driveways. c. The Florida Department of Transportation ( DOT) must be notified of all work along a State Road. Contact the DOT asset manager, VMS, at 850) 678 -2993. If a permit is required from DOT, notice of approval r shall be provided to the City prior to the issuance of a building permit.

Download this text file with its original spacing ↓