READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 28, 2017 — 2 Final Clean Copy Inland (existing Carts) 2-23-17 (with Asset Management Revisions)(signed) — reading text
Part 9 of 17. These parts divide the reading text for browsing; they are not the source document's page numbers.
2 Final Clean Copy Inland (existing Carts) 2-23-17 (with Asset Management Revisions)(signed) — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
required to comply with this Agreement, shall solely be the responsibility of
Contractor in accordance with Article 4.2.3 of this Agreement.
4.2. Contractor Responsibilities
4.2.1. Transition
No later than thirty (30) Days after the Effective Date of this Agreement, the Contractor and
Contract Manager, together with any subject matter experts the Contract Manager may select to
provide it assistance, shall conduct a joint inspection of the Transfer Stations to document the
existing condition of the facility to define and document the Required Turn Back Condition for
Page 16
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, and Processing/Disposal Agreement (using existing bins)
the Transfer Stations. Details regarding the Required Turn Back Condition shall be defined,
including who is responsible for making repairs or replacements immediately or in the future,
and estimated cost of repairs or replacements, if feasible.
4.2.1.1. In order to establish the Required Turn Back Condition of all real property at the
Transfer Stations, the County and Contractor shall conduct a joint inspection(s) of the
facilities’ sites and buildings, to include utilities, no later than thirty (30) Days after the
Effective Date of this Agreement. The County and Contractor shall develop a list of
any necessary repairs or replacements that, following completion of such repairs and
replacements, shall be the Required Turn Back Condition, allowing for normal wear
and tear commensurate with the time of use, and considering the Contractor’s
responsibilities for maintenance, repair, and replacement.
4.2.1.2. As part of documenting the Required Turn Back Condition, the County’s engineering
consultant will evaluate and document the percentage of wear on the tip floors. The
Contractor shall be required to leave the tip floors in equal or better condition upon
the termination of this Agreement. If the Contractor fails to leave the tip floors in
equal or better condition than documented in the Required Turn Back Condition
report, the Contractor shall reimburse the County one hundred and twenty five
percent (125%) of the cost of returning the tip floor(s) to its Required Turn Back
Condition to cover both the cost of the work and the County’s administrative and
overhead costs.
4.2.1.3. At least ninety (90) Days prior to the conclusion of the term of this Agreement, the
County and Contractor shall jointly inspect the Transfer Stations to identify any repairs
or replacements needed to bring the facilities to the Required Turn Back Condition.
The Contractor, pending the Contract Manager’s approval, shall develop a list of any
and all necessary repairs or replacements that the Contractor, at its sole cost and
expense, must perform and shall establish a schedule for completing all such work.
4.2.1.4. At the termination of this Agreement, the Contractor shall have restored the Transfer
Stations to its Required Turn Back Condition. Contractor may remove any fixed assets
as long as Contractor restores the area to its pre-existing condition, unless otherwise
approved by the Contract Manager. The County reserves the right to require the
Contractor to remove any fixed assets and restore the area to its pre-existing
condition at the Contractor’s expense.
4.2.1.5. During the transition prior to the termination of this Agreement, the Contractor shall
cooperate with the County and, if applicable, the incoming contractor. Such
cooperation includes, but is not limited to, allowing site visits of the Transfer Stations
by the County and the incoming contractor, upon receipt of reasonable advance
notice, and ensuring all facilities are in Required Turn Back Condition. The Contractor
shall coordinate and cooperate with the newly selected contractor, if applicable, and
the County, to minimize any disruptions in the service provided.
4.2.1.6. At the termination of this Agreement, the Contractor shall transfer all active facility
permits for the Transfer Stations to the County, or its designated contractor as
requested by the County, in a timely manner so as to avoid any disruption of service.
4.2.2. Capital Improvements
Contractor shall be solely responsibility for all the cost of all capital improvements to the Transfer
Stations.
4.2.3. Permits and Licenses
4.2.3.1. The Contractor shall be responsible for and bear all costs of maintaining, modifying,
and renewing all operational and environmental permits and approvals from any
Page 17
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, and Processing/Disposal Agreement (using existing bins)
governmental entity required to operate the Transfer Stations. The County will
coordinate with the Contractor and permitting agencies, as needed.
4.2.3.2. The Contractor shall perform and pay for any groundwater, surface water, leachate, or
other routine environmental monitoring at the Transfer Stations that is required by
the Florida Department of Environmental Protection (FDEP) or any regulatory agency
with jurisdiction over the activities at the facilities.
4.2.3.3. The Contractor shall be responsible for compliance with all environmental and
operational permits. Should the County receive a Notice of Violation (NOV), the
County will forward the NOV to the Contractor within twenty-four (24) hours. The
Contractor shall take immediate action to remedy the violation and regain compliance.
The Contractor shall bear any and all costs associated with remedying a violation and
regaining compliance.
4.2.3.4. Contractor’s failure to properly maintain or obtain permits and licenses shall result in a
breach of this Agreement.
4.2.4. Hours and Holidays
4.2.4.1. The Transfer Stations will be open to the public from 6:00 a.m. to 5:00 p.m. CDT,
Monday through Friday and 6:00 a.m. to 12:00 noon CDT, Saturday. The County
reserves the right to alter the operating hours of the facilities. Contractor and County
agree to negotiate a reasonable fee adjustment if such change in operating hours
affects operating costs.
4.2.4.2. Contractor will close the Transfer Stations on the following Holidays: New Year’s Day,
Thanksgiving, and Christmas.
4.2.4.3. The County reserves the right to require the opening and operating of the Transfer
Stations outside of the regular hours during times of emergency or urgent need. The
Contractor shall staff and equip the facility to meet the needs of the County during
such emergency openings.
4.2.5. Acceptance of Waste
In accordance with applicable operational protocol established by Contractor and with the
approval of the County, Contractor shall provide, operate, and maintain facilities for the receipt
of Acceptable Waste. Contractor shall assume ownership of all waste once tipped at the Transfer
Stations. The County makes no assurances or guarantees regarding the quantity of materials
that will be delivered to the Transfer Stations.
4.2.5.1. Acceptable Waste: Contractor shall process Acceptable Waste received at the
Transfer Stations in accordance with all Applicable Law and in a manner which would
not pose a threat to public health and safety.
4.2.5.2. Unacceptable Waste: Contractor shall exercise its best efforts to avoid the acceptance
of Unacceptable Waste at the Transfer Stations. Contractor shall process all
Unacceptable Waste received at the facilities in accordance with Applicable Law and in
a manner which will not pose a threat to public health and safety. Contractor shall
indemnify the County for any liability claims or damages imposed as a consequence of
Contractor’s failure to process such material in accordance with Applicable Law.
4.2.6. Operations
4.2.6.1. Contractor shall be responsible for and shall bear all costs and expenses associated
with operating and maintaining the Transfer Stations in full compliance with the FDEP
Transfer Station Permits, Operations Plans, Applicable Law, and this Agreement.
4.2.6.2. Contractor shall weigh and record all inbound and outbound vehicles carrying
materials, including transfer trucks, at the STS. Each vehicle delivering waste or
Page 18
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, and Processing/Disposal Agreement (using existing bins)
recyclables shall be properly identified and authorized in a manner satisfactory to the
County and Contractor. Weights of all materials shall be recorded in the County’s
WasteWorks system.
4.2.6.3. The weight of all materials shall be determined using the scales at the Transfer
Stations. Contractor shall, at least every six (6) months, test the accuracy of the STS
weight scales. The scales shall be tested by a scale company registered with the
Florida Department of Agriculture and Consumer Services.
4.2.6.4. Contractor shall regularly, at a minimum every ninety (90) Days, update tare weights
used to determine material weights.
4.2.6.5. Recyclables
