READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — June 16, 2015 — Award Recommendation - Consultant — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Award Recommendation - Consultant — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

POLYENGINEERING, INC, ARCHITECTURE. ENGINEERING. SOLUTIONS. May 26, 2015 Mr. Jeff Littrell, Director Okaloosa County Water and Sewer Department 1804 Lewis Turner Boulevard, Suite 300 Fort Walton Beach, FL 32547 Subject: Engineers Recommendation of Award Camp Rudder Pump Station Project Okaloosa County Bid No. RFB WS 29-15 Dear Mr. Littrell, Equipment only bids were received and opened for the Camp Rudder Pump Station project at 2:15 p.m. on May 20, 2015. The Board of County Commissioners received three (3) bids for the project. The project was bid with a Total Base Bid and two (2) optional bid items. The Base Bid was for a complete fiberglass wetwell, two submersible wastewater pumps, guiderails, ductile iron discharge piping, control panel and backup level monitoring devices. The optional bid items were as follows: Alternate Bid Item No. 1 — Upgrade to 316 stainless steel discharge piping Alternate Bid Item No. 2 — Add 5-year extended warranty to soft starts Okaloosa County Water & Sewer is under contract with the Federal Government to transmit wastewater from Auxiliary Field No. 6 (Camp Rudder) to the County’s Arbennie Pritchett Water Reclamation Facility (APWRF). The remote location, extremely long forcemain (approximately 18 miles) and the high head/low flow pumping condition makes this a very unique and difficult pumping scenario with a very limited selection of pumps capable of suitable performance. As a result, no bids were received based around pumps on the Okaloosa County Water and Sewer pre-approved pump list. According to the project specifications (Section 11145, 2.1-E.2.a), the Okaloosa County Water & Sewer Engineering Department is tasked with making the final determination of whether the submitted pump is to be considered an approved equal. To assist in that determination, Polyengineering offers the following analysis of the submitted pumps. Pumps submitted by the three vendors are as follows: Pump & Process Equipment, Inc. proposed a Fairbanks-Morse Pump Gilbert Pump & Mechanical, Inc. proposed a Grundfos Pump Jim House & Associates, Inc. proposed a Flygt Pump PHONE 850-609-1 100 Fax 850-609-1 101 PosT OFFICE Box 84 | FL AA COO 1543 |02 SUNSET LANE CIvIL, MECHANICAL, ELECTRICAL, ENVIRONMENTAL ENGINEERING WWW .POLYENGINEERING . COM SHALIMAR, FLORIDA 32579 ARCHITECTURE * ENVIRONMENTAL CONSULTING AND LAB TESTING ® PLANNING Due to the complexities of the pumping condition, the remoteness of the pump station and the fact that all three pumps would be operating to the far left limits of their pump curves, it is important to analyze the pumping characteristics of each pump throughout a range of conditions. The following table displays the shutoff head info for each pump. If the pressure in the line at the pump station reaches shutoff head, the pumps will cease to pump at all. As the data shows, the Fairbanks-Morse pump has the least amount of safety factor in this area and the Flygt has the most room to handle intermittent increases in pipeline head. Such intermittent increases could be caused by a buildup of air from malfunctioning air release valves (31 total in forcemain) or foreign objects in the line. Proposed Fairbanks | Proposed Grundfos | Proposed Flygt Shutoff Head (ft) 187 198 206 Normal Operating Head (ft) 168 175 180 Normal Operating Flow (gpm) 321 332 343 Allowable Head Increase in Line Before Flow = 0 GPM (ft) 19 23 26 Due to the long forcemain, large number of air release valves and the remote location of the pump station, it is prudent, reasonable, most advantageous and in the best interest of the County to select the pump with the largest range between operating head and shutoff head (Flygt) to allow County Staff more time to identify problems in the line and remedy them before any sewage backup occurs at Camp Rudder. Based on the analysis set forth above, Polyengineering, Inc. finds that Jim House and Associates is the lowest, most responsive bidder and recommends that the Board of County Commissioners award this project to Jim House and Associates, Inc. for the Base Bid and both Additive Alternates (1 & 2) for a combined lump sum total of $148,980.00. Should any questions arise, please do not hesitate to contact me directly at 850.609.1100. Sincerely, Polyengingering, Inc et ol Michael C. Evans, P.E. Project Manager cc: Mark Wise, P.E., OCWS Jeb Chessher, OCWS Mark Schmeltzer, OCWS JOB# 41-445 TABULATION OF BIDS OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS CAMP RUDDER PUMP STATION (EQUIPMENT ONLY) NOTE: BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. Pump & Process Equipment, | Gilbert Pump & Mechanical, Bid Date: Wednesday, May 20, 2015 Inc. Inc. Jim House & Associates, Inc. 3820 Hopkins St. 632-B Lovejoy Rd. NW 24312 Highway 98 BASE BID Pensacola, FL 32505 Ft. Walton Beach, FL 32548 Fairhope, AL 36532 [TEMNO. EST.QTY UNIT DESCRIPTION UNIT PRICE TOTAL|| UNIT PRICE TOTAL|| UNIT PRICE TOTAL 1 1 LS Al Equipment, Supplies, Material, and all other incidentals required to furnish and deliver the Camp Rudder Pump Station, including FRP wet well, pumps, motor control center (MCC) panel, SCADA termination points, piping inside wet well and above grade to first flange, piping seals, conduit seals, cable seals, incoming gravity line penetration & seal, 2" PVC transducer housing pipe, aluminum hatch (w/safety grate), backup control floats, guide rails, base elbows, pull cables,and all other appurtenance (EXCEPT GENERATOR AND ATS) (see attached Plans and Specifications for additional detail) $ 131,037.00 $132,388.00 $ 146,130.00 TOTAL BASE BID $ 131,037.00 $132,388.00 $146,130.00 ADDITIVE ALTERNATE BID - 1 (SST Wet Well Piping) 1 1 LS Upgrade all Wetwell Discharge Piping & Fittings to Sch 40 316 SST $ (500.00) $ 1,500.00 $ 1,250.00 ADDITIVE ALTERNATE BID - 2 (Extended Warranty on Soft Starts) 1 1 LS Add extended warranty as specified in Addendum #2 Item 2.1.B.16 no cost no bid $ 1,600.00 TOTAL ADDITIVE ALTERNATE $ (500.00) $ 1,500.00 $ 2,850.00 TOTAL BASE BID AND ADDITIVE ALTERNATE| $ 130,537.00 $133,888.00 $148,980.00 As read at bid ODenian $ 130,537.00 $133,888.00 $148,980.00 AL Michéel Evans, P.E. POLYENGINEERING, INC. 1 of'1 N A\'fi\‘\\\\ 2, 25 ’I,,’, FSS’ o .’Illl,l R UG A

Download this text file with its original spacing ↓