TOURIST DEVELOPMENT DEPARTMENT MEMORANDUM
DATE: October 23, 2014
TO: Tourist Development Council
FROM: Ed Schroeder, Tourist Development Department Director
Anthony Austermann, Marine Economic & Tourist Development Resource Coord
SUBJECT: Non-Deployment of the Tenneco Vessel
Background
The TDC allocated $75K for deployment of the Tenneco vessel as an artificial reef on May 30, 2013.
The BCC approved the acquisition of the Tenneco on June 18, 2013 pending the following conditions
being met: after hurricane season, hazardous materials inspection, insurance secured, and positive Coast
Guard inspection.
Discussion
The permit for the Tenneco deployment area has been approved by the FDEP, but it is still pending
USACE approval. It is unknown when the County will receive USACE approval for Fish Haven 19. A
positive HazMat inspection has been received from SCS Engineering, and a positive Coast Guard
inspection has been completed. The approved/awarded marine contractor’s insurance should provide
coverage during transport of the vessel, but the County will need to provide coverage once the vessel is
docked.
Before the Tenneco can be deployed as artificial reef material, it will need to be completely cleaned and
stripped of all wooden materials, tanks, and hazardous materials. Very little of the original deck
structure (structures that visually define it as a vessel) will remain intact. The Tenneco will essentially
be a cigar shaped concrete hull resting in approximately 60 feet of water. The logistics for prepping the
vessel for deployment will include the coordination of volunteer groups to perform the work, dumpsters
and barrels for the disposal of waste oils, fuel, and other hazardous materials, and heavy equipment may
be required to efficiently deconstruct the entire upper wooden deck area. The Tenneco is currently
moored in Bayou Chico, directly adjacent to the Barrancas Ave Bridge and Pelican’s Perch Marina.
Unless a safe harbor can be found within Okaloosa County, the Tenneco will need to be cleaned and
prepped for deployment in Pensacola. Preparation of the Tenneco has not been yet begun, but it will
take a significant effort and may present Okaloosa County with additional liabilities. In addition, the
marine contractor that removed the vessel from the Pelican’s Perch Marina berth pointed out that they
felt that the vessel was “a little fragile” and stated that they used great caution when they pulled it away
from the dock and off of the bottom where it had been resting for approximately 30 years. The Pelican’s
Perch Marina is under pressure from the FDEP to dispose of the Tenneco as a condition of their
submerged land lease renewal, and Okaloosa County TDD was recently contacted for support regarding
the FDEP’s requirement to remove the vessel from Bayou Chico.
The FY 2014-15 budget includes $75,000 for Boat Reef (account 1175-563753). Staff requests this
activity no longer be pursued due to logistical, liability, and financial concerns.
TDC Recommendation to BCC
Recommend discontinuing pursuit of deployment of the Tenneco as an artificial reef.
The Tenneco
A concrete hulled vessel constructed in St. Marks, Florida in 1942.
Originally intended to be deployed as an artificial reef that would
serve as a dive certification platform.
The primary objective was to deploy the Tenneco vessel as an alternative location for open-water dive certifications.
The Okaloosa County TDC earmarked 75k for the Tenneco Deployment on May 30, 2013.
The Okaloosa County BCC discussed and approved the acquisition of the Tenneco on June 18, 2013 once the
following conditions have been met:
After hurricane season
Hazardous materials inspection
Insurance Secured
Positive Coast Guard inspection
However, before the Tenneco can be deployed as an artificial reef, it must be completely cleaned of all tanks,
hazardous materials, and stripped of all of its wooden materials. Very little of the original deck structure (structures
that visually define it as a vessel) will remain intact.
The preparation of the Tenneco will take a significant County effort:
The marine contractor that removed the vessel from the Pelican’s Perch Marina berth expressed that they felt the vessel was “a
little fragile” and stated that they used “great caution” when they pulled the vessel away from the dock, and off of the bottom,
where it had been resting for approximately 30 years.
The County does not have a suitable location to store the vessel and prepare the vessel for deployment.
Staff believes that the 75k will be better spent on deploying donated concrete materials from Eglin AFB, and the
County should avoid the risks of towing and deploying an aging vessel of questionable structural integrity.
Staff is continuing to research other structures (possibly prefabricated) that will better serve as a optimal and stable
dive certification platform.
The Tenneco
BEFORE
AFTER
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: June 18, 2013
TO: Honorable Chairman and Members of the Board
FROM: John Hofstad
SUBJECT: Shirley J Brown Memorial Reef
DEPARTMENT: Public Works
BCC DISTRICT: All
STATEMENT OF ISSUE: The Okaloosa County Artificial Reef Program requests approval to
acquire, transport, prepare and deploy the vessel Tenneco for the construction of the Shirley J.
Brown Memorial Reef. A request for funding for these activities has been presented to the TDC
Advisory Board. The TDC Advisory Board evaluated the project and determined that funding is
consistent with the TDC mission. The TDC Advisory Board recommended submission of the
project for approval by the Okaloosa County Board of County Commissioners and approval to
allocate $75,000 to the project.
BACKGROUND: Mr. Ted Brown, son of Captain Shirley J Brown, contacted the Okaloosa
County Artificial Reef Program (OCARP) in early 2012 to determine whether OCARP would be
interested in the donation of the 125 foot, concrete-hulled, recreational vessel Tenneco for the
construction of an artificial reef. Captain Brown was the owner and operator of Brown Marine
and was involved in many maritime operations throughout the northern Gulf region. They were
also involved in the transportation and construction of many of the public reef deployments off
of Okaloosa County shores for several decades. The involvement of Brown Marine in local
maritime operations in Okaloosa county waters is currently memorialized at the Destin History
& Fishing Museum.
The Tenneco was constructed in St. Marks Florida in 1942 by the Tennessee Gas and
Transmission Company and served as a platform to entertain select clientele. During the 1980s,
Brown Marine acquired the Tenneco and made it available to local entities for business meetings
and social gatherings. For the past 20 years, the Tenneco has been out of service and moored at
Pelican Pointe Marina in Pensacola, Florida.
Over the past several years, members of the local dive community have asked OCARP to
consider building a reef in shallow water (60 feet) that would be accessible to divers who wish to
complete their open water dive certification. In the meantime, OCARP has been on the lookout
for material(s) that would satisfy this need and offer all recreational divers a safe and remarkable
underwater experience. The Tenneco vessel would suit both of these uses. Because of its unique
construction, the vessel offers a flat stable upper deck approximately 10 feet above the keel.
This deck can be used by dive training providers to have a stable location to gather several
students around for technical instruction. In fact, the deck is long enough to accommodate
several of these functions simultaneously. The interior of the vessel is large and has very few
structural obstructions making ingress/egress relatively safe and accessible.
Several locations for deployment are under consideration. The key to the deployment to best
serve the diving community is to place the vessel in waters less than 60 feet deep. Sixty feet is
the maximum depth allowed during open water dive certification testing. A restriction to
deployments one-mile from shore is the Gulf Sturgeon Exclusion Zone (GSEZ). The presence of
this restriction does not prohibit deployments in this area but the additional permitting scrutiny is
undesirable. Depths along 60 feet contour are found beyond the GSEZ with a higher frequency
west of the Destin Pass. A location west of the Destin Pass has been identified at approximately
4.8 miles at a heading of 79°. A location east of Destin Pass has been identified at 4.9 miles at a
heading of 103°. Both of these locations are within formerly permitted reef construction areas
which will presumably make the permitting process easier. The location east of Destin Pass is
approximately 0.6 miles southwest of the Miss Louise which is the other popular open water dive
certification destination. Other artificial reefs in this area could prove to add to the congestion.
The location to the west of the pass has very few reefs in the immediate area and would serve to
spread out the user groups. OCARP will continue to evaluate locations during the permit
preparation process.
The State and Federal permits for the vessel deployment have not yet been solicited. The Florida
Department of Environmental Protection has already conceptually approved of the project and
has stated that a Noticed General Permit (NGP) can be applied for based on the preliminary
project description. The NGP application will take about 2 months for OCARP to develop. The
FDEP is required to approve the permit or request additional information within 30 days of
receipt of the application. Being a vessel, it is expected that the US Army Corps of Engineers
will require a more robust permitting vehicle though the NGP may be acceptable. Regardless,
the permit application for the USACE review will be developed while the preparation activities
for the vessel are being conducted.
The vessel is currently located at Bayou Chico in Pensacola Florida. While the vessel is being
donated at no charge; the towing, preparation and deployment costs are not. The estimated cost
of the towing, preparation and deployment is $75,000. The Tourist Development Council has
endorsed the project. Approval of the project by the Board will allow OCARP to begin the
process of acquiring the vessel title and transporting the vessel to the County for deployment
preparation.
OPTIONS: Approve/Disapprove
RECOMMENDATIONS: Approve the $75,000 TDC allocation for the procurement
transportation, permitting, preparation, and deployment of the Shirley J Brown Memorial Reef.