READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 30, 2013 (meeting #1144) — reading text
Part 19 of 28. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
5,000 Chlorine Leak Detectors E Water Operations
FY16 411 6,000 Pallet Jack E Plant Maintenance
FY16 411 20,000 Disc Filter E Plant Maintenance
FY16 411 500,000 Water - New Lines I Replace aging transit water mains and/or increase fire protection
FY16 411 75,000 Existing Wells I Improvements to wells (i.e. flowmeters & chlorine upgrades)
FY16 411 50,000 Large Meter Replacement I Replacement of meters above 2" which have been in the ground for an extended
period of time & no longer register accurately.
Packet Pg. 112
Page 4-42
Okaloosa County
Capital Improvement Program
Fiscal Years 2014-2018
WATER & SEWER
FY Fund Amount Project Name Cat Narrative
FY16 411 150,000 State/County Relocation Projects (Water) I Relocations of water lines to accommodate County & FDOT projects
FY16 411 75,000 Radio Read System I Replace/upgrade meters w/ transmitters in East County Area
FY16 411 100,000 Highway 90 East - New Water Line I Continue construction eastward towards future well & development
FY16 411 100,000 Future Water Supply I Continue Planning Stage - Evaluate options to implement new strategy
FY16 411 2,000,000 Residential Water Meter Replacement I Replacement of residential meters which have been in the ground for an extended
period of time & no longer register accurately.
FY16 411 500,000 Rehab - Sewer Collection I Point repairs, relining and replacement of vitrified clay sewer mains
FY16 411 50,000 Bob Sikes WRF Upgrades I Replace/upgrade/rehab components of 1.0 MGD facility
FY16 411 225,000 SCADA Replacements/Upgrades (Sewer) I Monitor and control systems at sewer collection sites
FY16 411 50,000 West County Pump Stations I Heavy flow station upgrade
FY16 411 50,000 F.W. Stephenson WRF Upgrades I Replace/upgrade/rehab components of 1.0 MGD facility
FY16 411 50,000 Sanitary Collection (LS Rehab) I Replace/upgrade/rehab aging lift stations
FY16 411 100,000 Sanitary Collection (Misc Sewering) I Install miscellaneous new collection systems
FY16 411 50,000 Arbennie Pritchett WRF Upgrades I Replace/upgrade/rehab components of 10 MGD facility
FY16 411 3,000,000 Arbennie Pritchett WRF 5 MGD I Upgrade 10 MGD facility to 15 MGD with Capacity Expansion Charges rec'd
Expansion
FY16 411 150,000 State/County Relocation Projects (Sewer) I Relocations of sewer lines to accommodate County & FDOT projects
FY17 411 15,000 Engineering Plotter E Engineering
FY17 411 30,000 GPS Based Station E Engineering
FY17 411 17,500 Sensus Meter Reading Equipment E Information Technology for Meter Reading
FY17 411 15,000 Blade Server E Information Technology
FY17 411 10,000 Server / VMWARE E Information Technology
FY17 411 5,000 API Document Imaging Scanners E Information Technology
FY17 411 20,000 C2G Server Upgrade E Information Technology
FY17 411 20,000 PCs (replace aging/outdated) E Information Technology
FY17 411 55,000 Radio Read Meter System E Information Technology for Meter Reading
FY17 411 10,000 C2G Tracking Software E Information Technology
FY17 411 10,000 One Point Kiosk E Information Technology
FY17 411 10,000 SunGard PS QREP Analytics E Information Technology
FY17 411 10,000 MAXIMO Interface(SunGard PS) E Information Technology
Packet Pg. 113
Page 4-43
Okaloosa County
Capital Improvement Program
Fiscal Years 2014-2018
WATER & SEWER
FY Fund Amount Project Name Cat Narrative
FY17 411 10,000 Selectron (IVR) upgrade/additions E Information Technology
FY17 411 20,000 SCADA equipment & software E System Control and Data Acquisition
FY17 411 60,000 CL 12 Machine - Large Taps E Water & Sewer Maintenance
FY17 411 10,000 Ground Pentrating Radar E Water & Sewer Maintenance
FY17 411 125,000 Excavator 135 E Water & Sewer Construction
FY17 411 100,000 Dump Truck E Water & Sewer Construction
FY17 411 170,000 Boring Machine E Water & Sewer Construction
FY17 411 5,000 Replace Ice Machine E Logistics
FY17 411 7,000 Pipe racks - Large Pipe E Logistics
FY17 411 60,000 F350, Utility Body, 4X4, VMAC, INV. E Replace 02G14560
FY17 411 55,000 3/4 Ton, Utility body, 4X4 E Replace 02G14641
FY17 411 36,000 Sport Utility, 4 Dr., 4X4 E Replace 03A14782
FY17 411 36,000 Sport Utility, 4 Dr., 4X4 E Replace 04B15622
FY17 411 55,000 3/4 Ton, Utility body, 4X4 E Replace 04G15609
FY17 411 36,000 1/2 Ton, P/U, 4X4, Ext Cab E Replace 05C15946
FY17 411 36,000 1/2 Ton, P/U, 4X4, Ext Cab E Replace 05C14948
FY17 411 60,000 1 ton, Utility Body, 4 x 4 E Replace 04G15611
FY17 411 36,000 1/2 Ton, P/U, 4X4, Ext Cab E Replace 05C14947
FY17 411 10,000 Still for Tlen E Lab
FY17 411 350,000 Vactor truck E Electronics/Pump Crew
FY17 411 41,000 4 x 4 Tractor E Russell Stephenson Improvements
FY17 411 15,000 Disk Prime E Russell Stephenson Improvements
FY17 411 6,000 Refrig Comp Sampler E Russell Stephenson Improvements
FY17 411 18,000 Tractor / Mower E Bob Sikes WWTF
FY17 411 5,000 Chlorine Leak Detectors E Water Operations
FY17 411 5,000 Chlorine High-Low Vacuum Alarm E Water Operations
FY17 411 12,000 Bush Hog E Plant Maintenance
FY17 411 500,000 Water - New Lines I Replace aging transit water mains and/or increase fire protection
FY17 411 75,000 Existing Wells I Improvements to wells (i.e. flowmeters & chlorine upgrades)
FY17 411 50,000 Large Meter Replacement I Replacement of meters above 2" which have been in the ground for an extended
period of time & no longer register accurately.
FY17 411 150,000 State/County Relocation Projects (Water) I relocations of water lines to accommodate County & FDOT projects
FY17 411 100,000 Highway 90 East - New Water Line I Continue construction eastward towards future well & development
Packet Pg. 114
Page 4-44
Okaloosa County
Capital Improvement Program
Fiscal Years 2014-2018
WATER & SEWER
FY Fund Amount Project Name Cat Narrative
FY17 411 100,000 Future Water Supply I Continue Planning Stage - Evaluate options to implement new strategy
FY17 411 75,000 Radio Read System I Replace/upgrade meters w/ transmitters in East County Area
FY17 411 2,000,000 Residential Water Meter Replacement I Replacement of residential meters which have been in the ground for an extended
period of time & no longer register accurately.
FY17 411 500,000 Rehab - Sewer Collection I Point repairs, relining and replacement of vitrified clay sewer mains
FY17 411 50,000 Bob Sikes WRF Upgrades I Replace/upgrade/rehab components of 1.0 MGD facility
FY17 411 200,000 SCADA Replacements/Upgrades (Sewer) I Monitor and control systems at sewer collection sites
FY17 411 50,000 West County Pump Stations I Heavy flow station upgrade
FY17 411 50,000 F.W. Stephenson WRF Upgrades I Replace/upgrade/rehab components of 1.0 MGD facility
FY17 411 50,000 Sanitary Collection (LS Rehab) I Replace/upgrade/rehab aging lift stations
FY17 411 100,000 Sanitary Collection (Misc Sewering) I Install miscellaneous new collection systems
FY17 411 50,000 Arbennie Pritchett WRF Upgrades I Replace/upgrade/rehab components of 10 MGD facility
FY17 411 150,000 State/County Relocation Projects (Sewer) I Relocations of sewer lines to accommodate County & FDOT projects
FY18 411 30,000 GPS/GIS Integration Unit E Engineering
FY18 411 57,500 Sensus Meter Reading Equipment E Information Technology
FY18 411 20,000 Blade Server E Information Technology
FY18 411 10,000 Server / VMWARE E Information Technology
FY18 411 5,000 API Document Imaging Scanners E Information Technology
FY18 411 25,000 PCs /Laptops
