READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-22-2007 regular agenda — reading text
Part 26 of 39. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13460-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
State of Florida and attach copies of all such licenses issued to the business
entity.
6. 2. 10 Firms submitting proposals as a joint venture shall submit to the City, as
part of
their proposal, a copy of joint agreement.
6. 2. 11 Proposed schedule of work to include the estimate of man hours and cost to
complete each task.
6.3 Requirements:
Proposers must provide documentation, which demonstrates their ability to satisfy all of the
minimum qualification requirements outlined below. Proposers who do not meet the minimum
qualification requirements or who fail to provide supporting documentation shall not be
considered for award.
6.3. 1 Capabilities of Firm:
A statement of proposer' s qualifications to serve as consultant for the services
required, including a listing of all key project personnel, proposer' s shall also provide
a description of in house
professional and technical support as well as outside or
subcontracted services. Qualification statements shall include detailed evidence
and/or the proposer' s ability to perform the
necessary services. Determination of
proposer' s successful ability to perform will be at the discretion of the City of Fort
Walton Beach.
6. 3. 2 Past Performance:
Provide a minimum of five ( 5) references with specific names, addresses,
telephone
and fax numbers, for similar services performed for other
public entities, specifically
any pertaining to governmentaVmunicipal facilities.
6.3. 3 Willingness of firm to work within budget and time constraints:
Describe of proposer to work within the City' s
willingness budget and time
constraints and manner in which the proposer will work with the
City to ensure
requirements of the scope of work are met. A statement of disclosure thecertifying
proposer bears no relationship, past or present, with any potential bidder or
contractor, which may hinder, impede or in
any way compromise efforts to perform
complete, unbiased and objective services for the City. Include your estimate level of
work and proposed schedule in this section.
6. 3.4 Experience of the firm with regard to consolidations/ privatization studies, A-76
studies or similar type services.
6.3. 5 Provide a brief detailed breakdown of estimated man- hours and cost to
complete each
task. Each task shall state estimated man- hours and hourly wage rates of the
contractor and employees.
Purchasing Department Page: 8
study of Alternative Delivery Methodologies for City Services Request for Proposal 07- 117
6. 3. 6 Location of Firm:
Identify location of proposer' s main office and branch offices. Also, identify the
office which will be responsible for performing the services contained herein.
the City in
6. 3. 7 Any other pertinent information, which the proposer believes will assist
making its selection.
7. EVALUATION OF PROPOSALS:
7. 1 An evaluation committee will be established to review and evaluate each proposal.
to which a short
Proposers may be required to make a brief presentation to City Staff subsequent
list will be from such ratings.. The information provided in response to paragraphs
developed
6.3. 1 through 6.3. 7 will be rated, utilizing a system as follows:
a. Capabilities
b. Past Performance
c. Level of Work and Proposed Schedule
d. Price
e. Experience
f Local knowledge
g. Additional Information
SELECTION OF PROPOSALS:
The evaluation committee will make a recommendation to City Council who shall make the final
determination and award of this contract. Initial plans call for a recommendation to be submitted to
City Council at their 22, 2007
May Project specific discussions will be conducted with the
meeting.
to negotiate a services agreement
top ranked firm. Following the discussion, the committee will attempt
with the top ranked firm. If no agreement can be reached with the top ranked firm that firm shall be
dismissed and the City shall proceed with discussions with the second firm. The procedure may be
repeated as times as necessary until an agreement can be negotiated that is satisfactory to both
many
parties.
9. OUESTIONS REGARDING SPECIFICATIONS OR PROPOSAL PROCESS:
9. 1 To ensure fair consideration for all proposers, the City prohibits communication to or with any
in paragraph
department, bureau or employee during the submission process, except as provided
9. 2. Additionally, the city prohibits communications initiated by a proposer to the City Official
an award decision has been
or employee evaluating or considering the proposals prior to the time
made. Any communication between proposer and the City will be initiated by the appropriate
needed to develop a
City Official or employee in order to obtain information or clarification
Such communications initiated by a proposer may
proper, accurate evaluation of the proposal.
be grounds for disqualifying the offending proposer from consideration for award of the proposal
and/or any future proposal.
Purchasing Department Page: 9
Study of Alternative Delivery Methodologies fOT City Services Request for Proposal 07- 117
9. 2 Any questions relative to interpretation of specifications or the proposal process shall be
addressed to the Director of Purchasing in writing, in ample time before the period set for the
receipt and opening of proposals. Inquiries will not be given any consideration if not received
within ten ( 10) days of the date set for receipt of proposals. Any interpretation made to
prospective proposers will be expressed in the form of an addendum to the specifications which,
if issued, will be conveyed in writing to all
prospective proposers no later than five ( 5) days prior
to the date set for receipt of proposals.
9.3 It will be the responsibility of the proposer to contact the Purchasing Department prior to
submitting proposal to ascertain if any addenda have been issued, to obtain all such addenda,
a
and to return executed addenda with the proposal.
9.4 Direct inquiries to:
City of Fort Walton Beach
Mike Tatum, Purchasing Director
Purchasing Department
143 Hollywood Boulevard NW
Fort Walton Beach, FL 32548
Telephone: ( 850) 833- 9522
Fax: ( 850) 833- 9643
Web site: www.fwb. org
http://
10. CONDffiONS OF PROPOSALS:
10. 1 Late Proposals:
Proposals received by the City after the time specified for receipt will not be considered.
Proposers shall assume full responsibility for timely delivery of the proposals to the location
designated for receipt of proposals.
10. 2 Completeness:
All information required by the Request for
Proposal must be supplied to constitute a legitimate
proposal.
10.3 Public Opening:
All proposals will be publicly opened at the time and
place specified and made available for
public inspection within ten ( 10) days after the proposal opening or when an award decision is
made, whichever is earlier.
10.4 Award Presentation:
Upon successful completion of negotiations, final award of the Contract must be approved by
City Council.
Purchasing Department Page: 10
Study of Alternative Delivery Methodologies fOT City Services Request fOT Proposal 07- 117
11. TERMS AND CONDITIONS OF AGREEMENT:
The Agreement to be entered into with the successful proposer will include, but not be limited to, the
following terms and conditions.
11. 1
