BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: December 16, 2014
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Planning Assistance to States (PAS) Phase IV Agreement with USACE
DEPARTMENT: Water and Sewer
BCC DISTRICT: All
STATEMENT OF ISSUE: Staff requests the Board of County Commissioners (BCC) to
approve and authorize the Chairman to execute Planning Assistance to States (PAS) Phase IV
Grant Agreement with the United States Army Corps of Engineers (USACE), Mobile District, in
support of our future public water supply program. The agreement is attached for your
consideration, along with the County Contract Review Coordination Sheet.
BACKGROUND: Beginning with the PAS Phase I Agreement executed on July 28, 2010,
Okaloosa County Water and Sewer (OCWS) has been partnering with the USACE to perform
preliminary planning activities related to future public drinking water supply utilizing surface
water from a proposed offline reservoir near the Shoal River via this program. Thru the PAS
Program, the USACE partners with local sponsors by a 50/50 cost share to perform planning
work related to water supply and other activities. The initial Phase I effort of $100,000 ($50,000
USACE and $50,000 OCWS) focused on the overall site selection for the proposed water
treatment facility and pump station. The Phase II effort of $290,000 ($145,000 USACE and
$145,000 OCWS) begun in 2011 included a comprehensive treat ability, bench-scale and pilot-
scale study of the Shoal River to determine the treatment plan for the future surface water
treatment facility. The most recent effort (Phase III) started in June 2012 and totaled $300,000
($150,000 USACE and $150,000 OCWS). Phase III was utilized to prepare a comprehensive
hydraulic water and water quality model of the County’s water distribution systems. The water
model will be used to evaluate potential transfer of water from the proposed surface water
treatment facility throughout Okaloosa County as well as evaluate alternatives to optimize the
water distribution network to increase reliability and reduce cost. It is possible that there may be
future issues with combining treated surface water from the proposed offline reservoir with
treated ground water in our distribution system. The model can help us to determine solutions to
future scenarios. The model files and the software have been provided to the County to be used
for future issue resolution. In total, the partnership with the USACE has provided $345,000 in
assistance to Okaloosa County in our efforts to provide for a long-term safe and reliable drinking
water supply for our citizens, businesses, industry, and off base military personnel.
With three phases now complete, in an effort to continue this partnership and future planning
effort, OCWS and USACE have worked together to identify additional activities and partnership
funding to move forward. The PAS Phase IV Agreement (attached) will provide the contractual
mechanism to continue this effort. The scope of work proposed for Phase IV (attached) will
include a detailed alternative analysis of the various sites previously proposed for the future
water supply offline reservoir and document the process required to obtain a USACE Section
404 Permit necessary to construct the future offline reservoir. The amount for this grant is a total
of $165,000 to again be shared 50/50 between USACE ($82,500) and OCWS ($82,500).
The process for moving forward with Phase IV is somewhat different than the previous three
phases from a financial standpoint. In previous phases, OCWS wired our dollar portion, as the
local sponsor, to USACE soon after the agreement was executed; and then USACE would sign
the agreement and complete the Scope of Work, keeping OCWS in the loop. For PAS Phase IV,
new USACE policies require the agreement to be executed prior to securing their funding.
USACE also plans to utilize in-house resources for their $82,500 portion. Table 1 of the
attached Scope of Work depicts all work tasks to be completed and the funding breakdown line
by line. It is anticipated that Okaloosa County’s portion of the cost-share will be accomplished
thru "in kind" work performed by one of OCWS’s consulting engineers, CH2M HILL. Once
USACE funding is identified, OCWS will return to the BCC for approval to move forward with
the work and for approval of a task order for CH2M HILL as Okaloosa County’s "in kind"
portion of the cost-share. With the above-mentioned new process, no money will need to be
wired from OCWS to USACE after the agreement is executed.
OPTIONS: Approve or deny.
RECOMMENDATIONS: OCWS staff recommends BCC approval and authorization for the
Chairman to execute the PAS Phase IV Grant Agreement with the USACE, Mobile District for a
total project cost of $165,000, to be shared 50/50 between the two parties.