Install Conduit
B1010 Directional Bore Conduit 3d 3d 0% 12-Jan-13 14-Jan-13 78d Directional Bore Conduit
B1020 Pull Wire 5d 5d 0% 28-Jan-13 01-Feb-13 -1d Pull Wire
B1030 Set Base for Lights/Signs 15d 15d 0% 28-Jan-13 04-Feb-13 -1d Set Base for Lights/Signs
Phase 3 - 7 Day Runway Closure 11-Feb-13, Phase 3 - 7 Day Runway Closure
C1000 Close Runway - 7 Days 0d 0d 0% 04-Feb-13 -1d Close Runway - 7 Days
C1010 Mill Existing Runway 4d 4d 0% 04-Feb-13 06-Feb-13 -1d Mill Existing Runway
B1040 Install Lights/Signs 10d 10d 0% 04-Feb-13 08-Feb-13 39d Install Lights/Signs
B1060 Demo Old Lighting 10d 10d 0% 04-Feb-13 08-Feb-13 41d Demo Old Lighting
C1020 Layout - Paving 4d 4d 0% 05-Feb-13 07-Feb-13 -1d Layout - Paving
C1060 Dress Runway Shoulders 6d 6d 0% 06-Feb-13 08-Feb-13 37d Dress Runway Shoulders
C1030 Pave Leveling Course 4d 4d 0% 07-Feb-13 08-Feb-13 -1d Pave Leveling Course
C1070 Sod Runway Shoulders 4d 4d 0% 08-Feb-13 09-Feb-13 37d Sod Runway Shoulders
B1050 Test New Light System 2d 2d 0% 08-Feb-13 08-Feb-13 39d Test New Light System
C1040 Pave Surface Course 4d 4d 0% 08-Feb-13 09-Feb-13 -1d Pave Surface Course
C1050 Install Temp Striping 4d 4d 0% 09-Feb-13 11-Feb-13 33d Install Temp Striping
C1080 Survey Finished Surface 1d 1d 0% 09-Feb-13 10-Feb-13 35d Survey Finished Surface
C1090 Open Runway 0d 0d 0% 11-Feb-13 33d Open Runway
Phase 4 - 35 Day Cure/Final Striping
Strip 18-Mar-13, Phase 4 - 3
D1000 30 Day Asphalt Cure 30d 30d 0% 09-Feb-13 11-Mar-13 -1d 30 Day Asphalt Cure
D1010 Haul Off Millings 10d 10d 0% 11-Feb-13 25-Feb-13 6d Haul Off Millings
D1020 Cleanup Stockpile Area 7d 7d 0% 26-Feb-13 06-Mar-13 6d Cleanup Stockpile Area
D1030 Regrass Stockpile Area 1d 1d 0% 07-Mar-13 07-Mar-13 6d Regrass Stockpile Area
D1040 Apply Final Paint Application to Runw 5d 5d 0% 12-Mar-13 18-Mar-13 -1d Apply Final Paint Applic
D1050 Final Completion 0d 0d 0% 18-Mar-13 -1d Final Completion
Actual Work Critical Remaining Work Summary Page 1 of 1 TASK filter: All Activities
Packet Pg. 313
Remaining Work Milestone © Primavera Systems, Inc.
6.7.e.a
Attachment: Construction Timeline 11 26 12 (1218 : Destin Airport Runway Construction)
7.1
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: December 4, 2012
TO: Honorable Chairman and Members of the Board
FROM: James D. Curry
SUBJECT: Jim Curry Retirement Information
DEPARTMENT: County Administrator
BCC DISTRICT: All
RECOMMENDED BY:
APPROVED BY:
James D. Curry, County Administrator
Packet Pg. 314
7.1.a
Packet Pg. 315
Attachment: Retirement letter (1200 : Jim Curry Retirement Information)
7.2
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: December 4, 2012
TO: Honorable Chairman and Members of the Board
FROM: James D. Curry
SUBJECT: Discussion on Consideration of Internal BCC Auditor Position
DEPARTMENT: County Administrator
BCC DISTRICT: All
STATEMENT OF ISSUE: Commissioner Windes has requested that the Board consider and
discuss a potential Internal BCC Auditor position.
RECOMMENDED BY:
APPROVED BY:
James D. Curry, County Administrator
Packet Pg. 316
COMMISSIONERS
BOARD OF COUNTY
ROLE OF BCC INTERNAL AUDITOR
OKALOOSA COUNTY, FLORIDA
7.2.a
Packet Pg. 317
Attachment: BCC Internal Auditor (1201 : Discussion on Consideration of Internal BCC Auditor Position)
7.2.a
Attachment: BCC Internal Auditor (1201 : Discussion on Consideration of Internal BCC Auditor Position)
Mission of BCC Internal Auditor
2
For activities relating to the responsibility of the Board
of County Commissioners, the Internal Auditor, would be
engaged to:
¨ Improve internal controls.
¨ Minimize future fraud.
¨ Foster and document best practices.
Packet Pg. 318
7.2.a
Attachment: BCC Internal Auditor (1201 : Discussion on Consideration of Internal BCC Auditor Position)
Authority of the BCC Internal Auditor
3
¨ The Internal Auditor would report directly to the
Board of County Commissioners.
¨ However the position would work with the County
Administrator, Department Heads, the Clerk of Courts
and the Clerk’s employees due to their relationship as
accountant to the Board.
¨ Management team input (Board and Clerk Finance)
will also be critical in the risk assessment process.
Packet Pg. 319