READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-03-08 workshop agenda — reading text
Part 8 of 128. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-15459-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
............................. 25
6. 1 Introduction .............................................................................................................. ............................... 25
6.2 Data Analysis ............................................................................................................. .............................25
6.3 Residential Units ........................................................................................................ ............................. 27
6. 4 Commercial Units ...................................................................................................... ............................. 27
6. 5 Multi -Family Units ...................................................................................................... ............................. 29
6. 6 Miscellaneous Land Use ............................................................................................ ............................. 29
6. 7 Projected Revenue .................................................................................................... ............................. 30
7.0 DISPUTE RESOLUTION PROCEDURE .......................................................................... ............................. 32
8.0 BILLING AND COLLECTION OF USER FEES ................................................................ ............................. 33
9.0 DRAFT STORMWATER UTILITY ORDINANCE .............................................................. ............................. 34
10.0 CONCLUSION .................................................................................................................. ............................. 35
APPENDICES
APPENDIX A - PRELIMINARY OPINIONS OF CONSTRUCTION COSTS
APPENDIX B - COMMERCIAL PARCELS IMPERVIOUS AREAS AND ERUs ( Based On Property
Appraisers Database)
APPENDIX C - MULTI -FAMILY PARCELS IMPERVIOUS AREAS AND ERUs ( Based On Property
Appraisers Database)
APPENDIX D - EXISTING ERU COSTS FOR STORMWATER UTILITIES IN FLORIDA
APPENDIX E - DRAFT STORMWATER UTILITY ORDINANCE and DRAFT STORMWATER UTILITY FEE
RATE RESOLUTION
CITY OF FORT WALTON BEACH
STORMWATER UTIL TY IMPLEMENTATION PLAN REPORT TETRA TECH
May 28, 2008
i
LIST OF TABLES
TABLE 2 -1 CID PRIORITIZATION .................................................................. ............................... 8
TABLE 2 -2 SUMMARY OF OPINION OF CONSTRUCTION COSTS ...................... ............................... 9
TABLE 6 -2 SUMMARY OF OPINIION OF REVENUE PROJECTIONS ...................... ............................. 25
CITY OF FORT WALTON BEACH
STORMWATER UTILITY IMPLEMENTATION PLAN REPORT TETRA TECH
May 28, 2008
ii
LIST OF FIGURES
FIGURE 1 - 1 MISSION STATEMENT DEVELOPMENT ........................................ ............................... 3
FIGURE 2 -1 STORMWATER CIP PROJECT LOCATIONS .................................. ............................... 7
FIGURE 2 -2 EXISTING STORMWATER MANAGEMENT ORGANIZATIONAL STRUCTURE .................... 11
FIGURE 2 -3 PROPOSED STORMWATER MANAGEMENT ORGANIZATIONAL STRUCTURE ................. 14
FIGURE 5 -1 SINGLE FAMILY RESIDENTIAL SAMPLING LOCATIONS ................ ............................... 23
FIGURE 5 -2 SINGLE FAMILY RESIDENTIAL SAMPLING EXAMPLE LOCATION ... ............................... 24
FIGURE 6 -1 EXISTING LAND USE DESIGNATIONS ......................................... ............................... 26
FIGURE 6 -2 COMMERCIAL GIS MAPPING SAMPLED PROPERTIES ................... ............................... 28
CITY OF FORT WALTON BEACH
STORMWATER UTILITY IMPLEMENTATION PLAN REPORT TETRA TECH
May 28, 2008
iii
1. 0 PURPOSE
1. 1 INTRODUCTION
Since the City of Fort Walton Beach's incorporation in 1937 the area has seen great changes to its
natural landscape. Over the past several years, the City has developed an extensive inventory of
stromwater infrastructure that includes: 34 miles of stormwater pipe, 61 surface water outfalls, 11
stormwater retention ponds, three (3) miles of ditches and stream, and over 1, 300 curb and surface
drainage inlets. This infrastructure is in place to collect and convey stormwater runoff and protect
property of 20,000 plus City residents. The stormwater infrastructure, some of which was originally
install in the 1930's, networks through 29 local drainage basins covering more than 4,780 acres
7.4 square miles). The City recognizes the need for maintenance, rehabilitation, and new
construction is a costly endeavor, especially for an aging stormwater system.
Along with maintenance and infrastructure needs, regulations placed on water quality by state and
federal entities have increased the need for funding. According to the National Pollutant Discharge
Elimination System ( NPDES) currently enforced by the Florida Department of Environmental
Protection ( FDEP), the City has five ( 5) years to implement a multitude of Best Management
Practices (BMPs) addressing water quality in the City.
The State of Florida is also proceeding with implementing additional water quality requirements
across the state through the Total Maximum Daily Loads ( TMDL) program. The program is
currently in process in northwest Florida to determine the maximum amount of pollutant loads
allowed from an environmental capacity standpoint for all local surface waters surrounding Fort
Walton Beach. Once the TMDLs for the local surface waters are established, the FDEP will
implement criteria to keep drainage carrying pollutants into our local waters from exceeding the
established TMDLs through a variety of BMPs.
The requirements of maintaining and operating an aging stormwater system pained with the
NPDES and upcoming TMDL programs places pressure on the City's budget already strained by
other circumstances. This is in addition to having funds available to correct historical or newly
noted drainage deficiencies around the City.
1. 2 SUMMARY OF WORK
Tetra Tech will prepare a Stormwater Utility Implementation Report addressing pertinent items
regarding implementing the City's Stormwater Utility to develop a dedicated funding source for
flooding and water quality improvements and stormwater infrastructure maintenance and utility
administration. Each of the following items will be included in our Initiation Report and in our
Project Initiation activities.
Review City's Stormwater Needs
CITY OF FORT WALTON BEACH
STORMWATER UTILITY EMIPLEMENTATION PLAN REPORT TETRA TECH
May 28, 2008 I
Develop Utility Mission Statement
Finalize Program Costs
Assess Institution /Management Structure
Develop Recommended Utility Program to include:
Rate Structure
Calculate Proposed Rates
Analyze Qualifying Fee Exemptions
Draft Ordinance with Mitigation Credit Policy and Procedure
Develop Master Utility Database
Revenue Projections and Parcel Database Iterations
Dispute Resolution Procedure
Public Outreach Meetings and Presentations
Council and Staff Meetings and Presentations
Implementation Plan Report Preparation
1. 3 MISSION STATEMENT
Based on input received from the City associated with the history and ongoing conditions
associated with the City's stormwater management system, a mission statement was developed.
The intent of developing the mission statement for the stormwater utility program is to summarize
priorities of the identified stormwater management needs in the form of a short paragraph mission
statement. Figure 1 -1 shows the priorities identified in developing the mission statement and the
final mission statement.
CITY OF FORT WALTON BEACH
STORMWATER UTILITY IMPLEMENTATION PLAN REPORT TETRA TECH
May 28, 2008 2
Stormwater management priorities identified by City staff and Tetra Tech:
Develop prioritized list of stormwater management projects.
Create preliminary stormwater master plan.
Estimate construction costs for projects.
Prepare the City for existing and upcoming regulatory requirements.
Create dedicated funding source for stormwater management.
Implement an equitable billing methodology for the users.
Create long -term program for managing stormwater.
Include major users in the discussion and development of the utility.
Have flexibility in the utility billing applications.
Streamline city staff organization to create a more efficient program.
Include public education in the utility's program.
Improve and preserve water quality
PROPOSED MISSION STATEMENT
Help our community improve and preserve natural water quality, prepare for existing and
upcoming regulatory requirements, and create dedicated program for operation and man-
agement of existing stormwater infrastructure while establishing and maintaining fair, flexi-
ble, and equitable stormwater rates.
FIGURE 1 - 1
CITY OF FORT WALTON BEACH
STORMWATER UTILITY MASTER PLAN
MISSION STATEMENT DEVELOPMENT
complex world
CLEAR SOLUTIONS"
TETRATECH
2.0 STORMWATER PROGRAM COSTS
2. 1 INTRODUCTION
Stormwater utility programs consist of a base cost for a stormwater program which the utility will
fund. The program and determined utility rate will be for funding the NPDES permitting and
compliance, upcoming TMDL requirements, City's stormwater Capital Improvement Program (CIP),
and maintaining and operating the City's stormwater infrastructure to an appropriate level of
service for the City's residents including City maintained collector and arterial roads used by the
general public.
2.2 NATIONAL POLLUTION DISCHARGE ELIMINATION
