24,406.80 Construction Assistance & Inspection TOTAL $ 347,796.90 OWNER: CITY OF FORT WALTON BEACH PROJECT: PRELIMINARY STORMWATER MASTER PLAN PROJECT NO: ESTIMATE TYPE ( ROM, BUDGETARY, CONSTRUCTION): BUDGET DATE: SEPTEMBER 10, 2007 Alternative J: Sylvania Heights Area Item Description Quantity Units Unit Price Total Maintenance of Traffic 1 L.S. 12,000.00 12,000.00 2500 SY 12.00 30,000.00 Temporary Driveway MaYI Traffic Control 1 LS 25,000.00 25,000.00 Erosion/ Sedimentation Controls 25000 LF 4.00 100,000.00 1 LS 45,000.00 45,000.00 Clearing & Grubbing Demolition & Removal 2000 S.Y. 15. 00 30,000. 00 Excavation, Regular 1500 CY 15. 00 22, 500. 00 Concrete Sidewalk 3000 S.Y. 40. 00 120,000.00 Asphalt Type SP -9.5 4500 TN 90. 00 405, 000.00 Superpave Asphaltic Concrete 1500 TN 90. 00 135,000.00 Stabilization Type B ( 12" - LBR 40) 12000 SY 7. 00 84,000.00 Base Option Group (BG 06) 12000 S.Y. 26. 00 312,000. 00 Curb Inlet 25 EA 4,500. 00 112,500.00 Manholes 25 EA 4,500. 00 112,500.00 18" RCP Stormwater Pipe 4000 L. F. 60. 00 240,000.00 24" RCP Stormwater Pipe 4000 L. F. 70.00 280, 000.00 30" RCP Stormwater Pipe 2500 L. F. 85.00 212, 500.00 36" RCP Stormwater Pipe 2500 L. F. 90.00 225, 000.00 12" Exfiltration System 0 L. F. 70.00 0. 00 18" Exfiltration System 0 L. F. 75.00 0. 00 Manhole Adjustments 50 EA 600.00 30, 000.00 Water Valve & Meter Adjustments 50 EA 300.00 15, 000.00 Type F Curb and Gutter 15000 L. F. 24.00 360,000.00 Type E Curb 10000 L. F. 24.00 240,000. 00 Raised Pavement Markers 1000 EA 10.00 10,000. 00 50,000 L. F. 1. 50 75, 000.00 Thermoplastic Striping & Markings 1 LS 260,750. 00 260, 750.00 Landscape and Sodding Handrail 500 LF 45.00 22,500.00 500 LF 65.00 32, 500. 00 Retaining Wall 0 EA 2, 800.00 0. 00 Landscape Irrigation Well and Pump Pavers 0 S. F. 8.00 0.00 1 L.S. 0.00 0.00 Sub -Total $ 3, 548,750-00 Bonds and Insurance L.S. $ 354,875. 00 $ 354,875. 00 Mobilization ( 15% of Bid) L.S. $ 532,312. 50 $ 532,312.50 L.S. $ 887, 187.50 5887. 187.50 Contingency (25 %) Construcbon Sub -Total $ 5,323, 125-00 Hydrologic Evaluation & Wetland Assessments 500,000-00 Engineering Design & Permitting 425,850. 00 Construction Assistance & Inspection S319.387.50 TOTAL $ 6,568, 362.50 OWNER: CITY OF FORT WALTON BEACH PROJECT: PRELIMINARY STORMWATER MASTER PLAN PROJECT NO: ESTIMATE TYPE ( ROM, BUDGETARY, CONSTRUCTION): BUDGET DATE: SEPTEMBER 10, 2007 Alternative G: Jonquil/Sullivan Units Unit Price Total Item Description Quantity Maintenance of Traffic 1 L.S. 8, 000.00 8,000.00 300 SY 12. 00 3,600. 00 Temporary Driveway Mat'I Traffic Control 1 LS 5, 000. 00 5, 000. 00 Erosion/Sedimentation Controls 3400 LF 4.00 13,600. 00 1 LS 0. 00 0. 00 Clearing & Grubbing Demolition & Removal 100 S. Y. 15. 00 1, 500.00 Excavation, Regular 0 CY 15.00 0. 00 Concrete Sidewalk 1000 S.Y. 40.00 40,000.00 Asphalt Type SP -9.5 0 TN 90. 00 0. 00 Superpave Asphaltic Concrete 0 TN 90.00 0. 00 Stabilization Type B ( 12" - LBR 40) 0 SY 7. 00 0. 00 0 S. Y. 26.00 0.00 Base Option Group (BG 06) Curb Inlet 2 EA 4,500. 00 9,000.00 Manholes 2 EA 4,500. 00 9,000.00 18" RCP Stormwater Pipe 0 L. F. 60.00 0.00 1500 L. F. 70. 00 105, 000.00 24" RCP Stormwater Pipe 0 L. F. 85. 00 0. 00 30" RCP Stormwater Pipe 0 L.F. 90. 00 0.00 36" RCP Stormwater Pipe 0 L. F. 70. 00 0.00 12" Exfiltration System 0 L. F. 75. 00 0.00 18" Exfiitration System Manhole Adjustments 0 EA 600. 00 0.00 0 EA 300. 00 0.00 Water Valve & Meter Adjustments 0 L. F. 24.00 0.00 Type F Curb and Gutter 0 L.F. 24.00 0. 00 Type E Curb 0 EA 10. 00 0.00 Raised Pavement Markers 0 L.F. 1. 50 0. 00 Thermoplastic Striping & Markings 2500 SY 6.00 15,000.00 Sodding Handrail 0 LF 45.00 0. 00 0 LF 65.00 0. 00 Retaining Wall 0 EA 2, 800.00 0. 00 Landscape Irrigation Well and Pump 0 S. F. 8.00 0. 00 Pavers 1 L.S. 0.00 0. 00 Sub -Total $ 209, 700-00 Bonds and Insurance L.S. $ 20, 970.00 $ 20, 970.00 Mobilization ( 15% of Bid) L.S. $ 31, 455.00 $ 31, 455.00 L.S. $ 52, 425.00 $ 5 Contingency (25 %) Construction Sub -Total $ 314, 550.00 25,164. 00 Engineering Design & Permitting Construction Assistance & Inspection TOTAL $ 358,587.00 APPENDIX B COMMERCIAL PARCELS IMPERVIOUS AREAS AND ERUs Based On Property Appraisers Database) CITY OF FORT WALTON BEACH STORMWATER UTILITY IMPLEMENTATION PLAN REPORT TETRA TECH May 28, 2008 37 LL) v IL J W U W 8¢ F- U) O W W Z c m vUCiUJJaUU§ 0 oar c mbar aJJ u— ti O. UU32v w tn0N t at» t t 3 J (, W } W. W Q Q U_ Q Q J ! W W W W- W- W.- W W

Download this text file with its original spacing ↓