12.00 2, 400.00 Temporary Driveway Mat'I Traffic Control 1 LS 5, 000.00 5, 000.00 Erosion/Sedimentation Controls 2350 LF 4.00 9,400.00 1 LS 0.00 0.00 Clearing & Grubbing Demolition & Removal 500 S. Y. 15.00 7, 500.00 Excavation, Regular 0 CY 15. 00 0. 00 Concrete Sidewalk 450 S.Y. 40.00 18, 000. 00 Asphalt Type SP -9. 5 50 TN 90.00 4,500.00 Superpave Asphaltic Concrete 0 TN 90.00 0. 00 Stabilization Type B ( 12" - LBR 40) 150 SY 7.00 1, 050.00 0 S. Y. 26.00 0.00 Base Option Group ( BG 06) Curb Inlet 0 EA 4,500.00 0.00 Manholes 3 EA 4,500.00 13,500.00 18" RCP Stormwater Pipe 0 L.F. 60.00 0. 00 24" RCP Stormwater Pipe 0 L.F. 70.00 0. 00 30" RCP Stormwater Pipe 0 L. F. 85.00 0. 00 36" RCP Stormwater Pipe 0 L. F. 90.00 0. 00 42" RCP Stormwater Pipe 980 L. F. 100.00 98,000.00 12" Exfiltration System 0 L. F. 70.00 0.00 0 L. F. 75. 00 0.00 18" Exfiltration System Manhole Adjustments 3 EA 600. 00 1, 800.00 2 EA 300.00 600.00 Water Valve & Meter Adjustments Type F Curb and Gutter 0 L.F. 24.00 0. 00 Type E Curb 0 L. F. 24.00 0. 00 Raised Pavement Markers 0 EA 10. 00 0.00 0 L. F. 1. 50 0. 00 Thermoplastic Striping & Markings 1 LS 25,000.00 25, 000.00 Landscape and Sodding Handrail 0 LF 45.00 0. 00 0 LF 65.00 0. 00 Retaining Wall 0 EA 2,800.00 0. 00 Landscape Irrigation Well and Pump Pavers 0 S. F. 8.00 0.00 1 L. S. 0. 00 0.00 Sub -Total $ 188,250.00 Bonds and Insurance L.S. $ 18, 825.00 $ 18, 825.00 Mobilization ( 15% of Bid) L.S. $ 28,237.50 $ 28,237. 50 L.S. $ 47,062. 50 $ 47.062. 50 Contingency (25 %) Construction Sub -Total $ 282,375-00 22, 590.00 Engineering Design & Permitting 16, 942, Construction Assistance & Inspection TOTAL $ 321, 907.50 OWNER: CITY OF FORT WALTON BEACH PROJECT: PRELIMINARY STORMWATER MASTER PLAN PROJECT NO: ESTIMATE TYPE ( ROM, BUDGETARY, CONSTRUCTION): BUDGET DATE: SEPTEMBER 10, 2007 Alternate L: Eglin Easement/California Ditch Item Description Quantity Units Unit Price Total Maintenance of Traffic 1 L.S. 20,000.00 20,000.00 1000 SY 12. 00 12,000.00 Temporary Driveway Mat'I Traffic Control 1 LS 2, 500. 00 2,500.00 Erosion /Sedimentation Controls 2500 LF 4.00 10,000.00 1 LS 15, 000.00 15,000.00 Clearing & Grubbing Demolition & Removal 2300 S. Y. 15.00 34,500.00 Excavation, Regular 0 CY 15. 00 0. 00 Concrete Sidewalk 0 S.Y. 40. 00 0. 00 Asphalt Type SP -9.5 750 TN 90. 00 67,500.00 Superpave Asphaltic Concrete 0 TN 90.00 0. 00 Stabilization Type B ( 12" - LBR 40) 0 SY 7.00 0. 00 0 S.Y. 26.00 0.00 Base Option Group ( BG 06) Curb Inlet 3 EA 7, 500.00 22, 500. 00 Manholes 6 EA 7, 500.00 45, 000.00 18" RCP Stormwater Pipe 0 L. F. 60.00 0.00 24" RCP Stormwater Pipe 0 L. F. 70.00 0. 00 30" RCP Stormwater Pipe 0 L. F. 85.00 0. 00 48" RCP Stormwater Pipe 2000 L. F. 110. 00 220, 000.00 12" Exfiltration System 0 L. F. 70.00 0. 00 18" Exfiltration System 0 L. F. 75.00 0. 00 Manhole Adjustments 2 EA 600.00 1, 200.00 Water Valve & Meter Adjustments 3 EA 300.00 900.00 Type F Curb and Gutter 0 L. F. 24. 00 0. 00 Type E Curb 0 L.F. 24.00 0. 00 Raised Pavement Markers 10 EA 10. 00 100. 00 300 L. F. 1. 50 450.00 Thermoplastic Striping & Markings 1 LS 30, 000.00 30,000.00 Landscape and Sodding Handrail 0 LF 45.00 0. 00 0 LF 65.00 0.00 Retaining Wall Landscape Irrigation Well and Pump 0 EA 2,800. 00 0.00 Pavers 0 S. F. 8. 00 0. 00 1 L. S. 0. 00 0. 00 Sub -Total $ 481, 650.00 Bonds and Insurance L. S. $ 48, 165. 00 $ 48, 165.00 Mobilization ( 15% of Bid) L. S. $ 72,247.50 $ 72,247. 50 Contingency (25 %) L.S. $ 120,412.50 $ 120,412. 50 Construction Sub -Total $ 722,475.00 Engineering Design & Permitting 57,798.00 Construction Assistance & Inspection 4Z348.5 TOTAL $ 823,621.50 OWNER: CCIY OF FORT WALTON BEACH PROJECT: PRELIMINARY STORMWATER MASTER PLAN PROJECT NO: ESTIMATE TYPE ( ROM, BUDGETARY, CONSTRUCTION): BUDGET DATE: SEPTEMBER 90, 2007 Alternative J: Bay Drive & Brooks Street Item Description Quantity Units Unit Price Total Maintenance of Traffic 1 L.S. 1, 500.00 1, 500. 00 Temporary Driveway MaYI 120 SY 12. 00 1, 440. 00 Traffic Control 1 LS 2,500.00 2,500. 00 Erosion/Sedimentation Controls 1100 LF 4. 00 4,400. 00 Clearing & Grubbing 1 LS 0.00 0. 00 Demolition 8 Removal 100 S. Y. 15.00 1, 500.00 Excavation, Regular 50 CY 15.00 750. 00 Concrete Sidewalk 0 S. Y. 40.00 0.00 Asphalt Type SP -9.5 750 TN 90. 00 67,500. 00 Superpave Asphaltic Concrete 0 TN 90. 00 0.00 Stabilization Type B ( 12" - LBR 40) 1100 SY 7.00 7, 700.00 Base Option Group (BG 06) 1100 S.Y. 26.00 28,600.00 Curb Inlet 0 EA 4,500.00 0.00 Manholes 3 EA 4, 500.00 13,500.00 18" RCP Stormwater Pipe 475 LF. 60. 00 28,500.00 24" RCP Stormwater Pipe 0 L.F. 70. 00 0. 00 30" RCP Stormwater Pipe 0 L. F. 85.00 0.00 36" RCP Stormwater Pipe 0 L.F. 90.00 0. 00 12" Exfiltration System 0 L. F. 70. 00 0. 00 18" Exfiltration System 0 L. F. 75.00 0. 00 Manhole Adjustments 2 EA 600.00 1, 200. 00 Water Valve & Meter Adjustments 3 EA 300. 00 900. 00 Type F Curb and Gutter 475 L. F. 24.00 11, 400.00 Type E Curb 0 L.F. 24.00 0. 00 Raised Pavement Markers 50 EA 10. 00 500. 00 Thermoplastic Striping 8 Markings 1, 000 L. F. 1. 50 1, 500. 00 Landscape and Sodding 1 LS 30, 000. 00 30,000.00 Handrail 0 LF 45. 00 0. 00 Retaining Wall 0 LF 65. 00 0.00 Landscape Irrigation Well and Pump 0 Fro 2,800.00 0. 00 Pavers 0 S. F. 8.00 0. 00 1 L.S. 0. 00 0. 00 Sub -Total $ 203,390.00 Bonds and Insurance L.S. $ 20,339.00 $ 20, 339. 00 Mobilization ( 15% of Bid) L.S. $ 30,508. 50 $ 30, 508. 50 Contingency (25 %) L.S. $ 50, 847.50 $ 50.847. 50 Construction Sub -Total $ 305,085.00 Engineering Design 8 Permitting

Download this text file with its original spacing ↓