READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 06-03-08 workshop agenda — reading text

Part 15 of 128. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-15459-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Concrete 0 TN 90. 00 0. 00 Stabilization Type B ( 17'- LBR 40) 150 SY 7.00 1, 050.00 Base Option Group (BG 06) 150 S.Y. 26.00 3,900.00 Curb Inlet 0 EA 4,500. 00 0. 00 Manholes 1 EA 4,500. 00 4,500.00 18" RCP Stormwater Pipe 50 L.F. 60.00 3,000.00 24" RCP Stormwater Pipe 0 L. F. 70.00 0. 00 30" RCP Stormwater Pipe 0 L.F. 85.00 0.00 36" RCP Stormwater Pipe 0 L. F. 90. 00 0.00 12" Exfiltration System 0 L.F. 70.00 0.00 18" Exfiitration System 0 L.F. 75.00 0. 00 Manhole Adjustments 2 EA 600.00 1, 200.00 Water Valve & Meter Adjustments 1 EA 300.00 300.00 Type F Curti and Gutter 550 L.F. 24.00 13,200.00 Type E Curb 0 L. F. 24.00 0. 00 Raised Pavement Markers 60 EA 10. 00 600.00 Thermoplastic Striping & Markings 1, 000 L.F. 1. 50 1, 500.00 Landscape and Sodding 1 LS 12, 000.00 12, 000.00 Handrail 0 LF 45.00 0. 00 Retaining Wall 0 LF 65. 00 0.00 Landscape Irrigation Well and Pump 0 EA 2,800.00 0.00 Pavers 27500 S. F. 8.00 220, 000.00 1 L.S. 0.00 0. 00 Sub -Total $ 300,400.00 Bonds and Insurance L. S. $ 30,040. 00 $ 30, 040.00 Mobilization ( 15% of Bid) L.S. $ 45,060.00 $ 45,060. 00 Contingency (25 %) L.S. $ 75, 100.00 $ 75, 100. 00 Construction Sub -Total $ 450,600.00 Engineering Design & Permitting 36,048.00 Construction Assistance & Inspection 27-036.00 TOTAL $ 513,684.00 OWNER: CITY OF FORT WALTON BEACH PROJECT: PRELIMINARY STORMWATER MASTER PLAN PROJECT NO: ESTIMATE TYPE ( ROM, BUDGETARY, CONSTRUCTION): BUDGET DATE: SEPTEMBER 10, 2007 Alternative B: Brooks Bridge Parking Lot Rom Description Quantity Units Unit Price Total Maintenance of Traffic 1 L.S. 1, 450.00 1, 450. 00 Temporary Driveway Maf'I 100 SY 12. 00 1, 200. 00 Traffic Control 1 LS 0. 00 0. 00 Erosion/Sedimentation Controls 600 LF 4.00 2,400. 00 Clearing & Grubbing 1 LS 0. 00 0. 00 Demolition & Removal 350 S.Y. 15. 00 5,250. 00 Excavation, Regular 30 CY 15.00 450. 00 Concrete Sidewalk 200 S.Y. 40. 00 8,000. 00 Asphalt Type SP -9. 5 50 TN 90. 00 4,500. 00 Superpave Asphaltic Concrete 0 TN 90. 00 0.00 Stabilization Type B ( 12" - LBR 40) 150 SY 7. 00 1, 050.00 Base Option Group (BG 06) 150 S.Y. 26.00 3,900.00 Curb Inlet 0 EA 4,500. 00 0. 00 Manholes 1 EA 4,500.00 4,500.00 18" RCP Stormwater Pipe 50 L. F. 60. 00 3, 000.00 24" RCP Stormwater Pipe 0 L. F. 70.00 0.00 30" RCP Stormwater Pipe 0 L. F. 85.00 0.00 36" RCP Stormwater Pipe 0 L.F. 90.00 0.00 12" Exfiftration System 0 L. F. 70.00 0. 00 18" Exfiltration System 0 L. F. 75.00 0. 00 Manhole Adjustments 1 EA 600. 00 600.00 Water Valve & Meter Adjustments 1 EA 300.00 300.00 Type F Curb and Gutter 100 L. F. 24.00 2,400.00 Type E Curb 0 L.F. 24.00 0.00 Raised Pavement Markers 30 EA 10.00 300. 00 Thermoplastic Striping & Markings 1, 000 L. F. 1. 50 1, 500.00 Landscape and Sodding 1 LS 10, 000.00 10,000.00 Handrail 0 LF 45.00 0.00 Retaining Wall 0 LF 65.00 0. 00 Landscape Irrigation Well and Pump 0 EA 2, 800. 00 0. 00 Pavers 20000 S. F. 8.00 160,000. 00 1 L.S. 0.00 0.00 Sub -Total $ 210,800.00 Bonds and Insurance L. S. $ 21, 080. 00 $ 21, 080. 00 Mobilization ( 15% of Bid) L.S. $ 31, 620.00 $ 31, 620.00 Contingency (25 %) L.S. $ 52, 700. 00 $ 52,700. 00 Construction Sub -Total $ 316,200.00 Engineering Design & Permitting 25,256.00 Construction Assistance & inspection S18,972, TOTAL $ 360,468.00 OWNER: CITY OF FORT WALTON BEACH PROJECT: PRELIMINARY STORMWATER MASTER PLAN PROJECT NO: ESTIMATE TYPE (ROM, BUDGETARY, CONSTRUCTION): BUDGET DATE: SEPTEMBER 10, 2007 Alternative C: Oyster Reef Restoration Item Description Quantity Units Unit Price Total Maintenance of Traffic 1 L.S. 10,000-00 10, 000. 00 Temporary Driveway Marl 0 SY 12. 00 0. 00 Traffic Control 1 LS 10,000.00 10, 000.00 Erosion/Sedimentation Controls 3000 LF 4. 00 12,000. 00 Clearing & Grubbing 1 LS 0. 00 0.00 Demolition & Removal 0 S.Y. 15.00 0.00 Excavation, Regular 1000 CY 15.00 15, 000.00 Concrete Sidewalk 0 S.Y. 40. 00 0. 00 Asphalt Type SP -9.5 0 TN 90. 00 0. 00 Superpave Asphaltic Concrete 0 TN 90. 00 0. 00 Stabilization Type B ( 12" - LBR 40) 0 SY 7.00 0. 00 Base Option Group (BG 06) 0 S.Y. 26.00 0.00 Curb Inlet 0 EA 4,500. 00 0.00 Manholes 0 EA 4, 500. 00 0. 00 18" RCP Stormwater Pipe 0 L.F. 60.00 0.00 24" RCP Stormwater Pipe 0 L.F. 70.00 0. 00 30" RCP Stormwater Pipe 0 L.F. 85.00 0.00 36" RCP Stormwater Pipe 0 L.F. 90.00 0.00 12" Exfiltration System 0 L. F. 70.00 0. 00 18" Exfiltrabon System 0 L. F. 75. 00 0. 00 Manhole Adjustments 0 EA 600. 00 0. 00 Water Valve & Meter Adjustments 0 EA 300. 00 0. 00 Type F Curb and Gutter 0 L. F. 24. 00 0. 00 Type E Curb 0 L.F. 24.00 0.00 Raised Pavement Markers 0 EA 10. 00 0. 00 Thermoplastic Striping & Markings 0 L. F. 1. 50 0. 00 Reef Material (Shell) 1 LS 25,800.00 25,800. 00 Handrail 0 LF 45. 00 0. 00 Retaining Wall 0 LF 65.00 0.00 Landscape Irrigation Well and Pump 0 EA 2,800.00 0. 00 Pavers 0 S. F. 8. 00 0. 00 1 L.S. 0. 00 0. 00 Sub -Total $ 72,800.00 Bonds and Insurance L.S. $ 7,280.00 $ 7,280. 00 Mobilization ( 15% of Bid) L.S. $ 10,920.00 $ 10,920. 00 Contingency (25 %) L. S. $ 18,200.00 $ 18,200. 00 Construction Sub -Total $ 109,200.00 Engineering Design & Permitting 8,736.00 Construction Assistance & Inspection 16,552- TOTAL $ 124,488.00 OWNER: CITY OF FORT WALTON BEACH PROJECT: PRELIMINARY STORMWATER MASTER PLAN PROJECT NO: ESTIMATE TYPE ( ROM, BUDGETARY, CONSTRUCTION): BUDGET DATE: SEPTEMBER 10, 2007 Alternative D: Golf Course Stream Restoration Item Description Quantity Units Unit Price Total Maintenance of Traffic 1 L.S. 1. 00 1. 00 Temporary Driveway Marl 1000 SY 12. 00 12,000. 00 Traffic Control 1 LS 10,000. 00 10, 000.00 Erosion/ Sedimentation Controls 3500 LF 4.00 14,000.00 Clearing & Grubbing 1 LS 50, 000.00 50, 000. 00 Demolition & Removal

Download this text file with its original spacing ↓