About this source
WorldFiberFirstAmendment from the Okaloosa County BOCC meeting of February 18, 2014 (IQM2 meeting #1190). Original portal label: WorldFiberFirstAmendment. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- WorldFiberFirstAmendment
- Date
- February 18, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
FIRST AMENDMENT TO WORLD FIBER TECHNOLOGIES, INC.
CONTRACT C10-1838-IS
THIS AMENDMENT to the Agreement entered into by and between Okaloosa County,
the owner, hereinafter referred to as the Party of the First Part, and World Fiber Technologies,
Inc. or its successors, executors, administrators and assigns, hereinafter referred to as the Party of
the Second Part, signed November 17,2010, is hereby amended as follows:
First Amendment to Exhibit A (attached) to include additional items
ALL OTHER TERMS OF THE ORIGINAL AGREEMENT SHALL REMAIN THE
SAME.
IN WITNESS WHEREOF, this First Amendment to the World Fiber Technologies, Inc.
Contract has been executed by the County and World Fiber Technologies, Inc. this
_ _ _ _ _ day of ,2014.
ATTEST:
DON W. HOWARD BOARD OF COUNTY COMMISSIONERS
CLERK OF CIRCUIT COURT OKALOOSA COUNTY, FL
By: _ _ _ _ _ _ _ _ _ __ By: ___________________________
Gary 1. Stanford Charles K. Windes, Jr.
Deputy Clerk Chairman
WORLD FIBER TECHNOLOGIES, INC.
By: ("{\,,,\,-~ f4,v(;2)
Mar~ L. Battle, President/CEO
First Amendment to Exhibit A
World Fiber Technologies, Inc. Contract C10-1838-IS
Item Unit Price UOM
IInstall provided cable in existing conduit (already proofed) 1
$2. 18 LF
«=
Fiber counts 1 thru 72 1000 LF) 1
Install provided cable in existing conduit (already proofed) Fiber counts
$1.75 LF
<=
1 thru 72 (> 1000 LF and 3000 LF)
Install provided cable in existing conduit (already proofed) Fiber counts
$1.50 I LF
1 thru 72 (>3000 LF)
Install provided cable in existing conduit (already proofed) Fiber counts
$2.35 LF
96 thru 288«= 1000 LF)
Install provided cable in existing conduit (already proofed) Fiber counts
$2.15 LF
96 thru 288 (> 1000 LF and <= 3000 LF)
Install provided cable in existing conduit (already proofed) Fiber counts
$2.00 LF
96 thru 288 (> 3000 LF)
Proof existing duct (includes mule tape) $0.44 LF
Building Entries (if part of conduit install project) $250.00 EA
Install provided pull box less than 30"x48"x36" to FDOT standards
$828.00 EA
(concrete collar not ind uded)
Install provided pull box 30"x48"x36" or larger to FDOT standards
$1 ,570.00 EA
(concrete collar not included)
...
CON n~ CT # CIO-1838-IS
WORLD FIll ER TECIINO LOG lES, INC.
HilER OPTlC fEl"," OHK lAINTEN . \.~C
EXPffiES : 1 111712012
Maintenance Contract for Okaloosa County Fiber Optic Network
This Agreement, in triplicate, executed in Fort Walton Beach, Florida this J 7/J. day of
tVev~•.J,U'- ,2010 is between Okaloosa County, Florida, the owner, hereinafter called the
party of the First pati, and World Fiber Technologies, Inc. of its successors, executors,
administrators and assigns, hereinafter called the Party of the Second pali.
WITNESSETH:
That for and in consideration of payments, hereinafter mentioned, to be made by party of
the First Pali, the Party of the Second Pali agrees to furnish all equipment, machinery, tools and
labor; to furnish and deliver all materials required to be furnished and delivered in and about two
(2) years maintenance period to begin upon execution of signatures by both patiies, and to do
and perform the maintenance of the Okaloosa County Fiber Optic Network and pay the unit
prices as attached on Exhibit "A", which is made a part of this Agreement. Work to be issued on
task orders as needed and in strict conformity with the provisions of this Contract. This Contract
may be renewed for one additional two year period.
SCOPE OF WORK:
The project covers task orders for furnishing and installing 2" conduit, pull boxes, splice
boxes, fiber optic cable, termination, splices, splice enclosures, emergency response and trouble
shooting. All work on this contract is subject to the same standards as previous contracts for
Phase 1 through phase V.
The Contractor shall be prepared to begin work as required by the task orders. The place
where the work is to be started will be stated in the task orders. The work shall be prosecuted
from as many different points, in such part or patis and at such times as may be directed, and
shall be conducted in such a malUler and with sufficient materials, equipment and labor as is
considered necessary to insUl:e it s completion with the time set forth in the task orders.
All specifications relating to conduit installation shall be compliant with what is set forth
in the FOOT specifications for installation and the Technical Special provisions for Phase V.
INSURANCE REQUIREMENTS:
Contractor will provide a copy of insurance certificate listing Okaloosa County as
additional insured party.
Commercial General Liability $1,000,000,00
Workers Compensation
State Statutory Limits
Employer Liability $1,000,000.00 Each Accident
Business Automobile $1,000,000.00 Each OcculTence
(Combined Single Limit)
World Fiber Technologies, Inc. shall maintain Business Automobile Liability Insurance
Coverage throughout the life of this Contract. The insurance shall include Owned, Non
Owned and Hired Motor Vehicle coverage.
REPRESENTATIVES:
The authorized representative of the County shall be:
Don Vanderhoek
Director
Okaloosa County Information Systems
1804 Lewis Turner Blvd, Suite 402
FOlt Walton Beach, FL 32547
email: dvanderhoek@co.okaloosa.f1.us
The authorized representative for World Fiber Technologies, Inc. shall be:
JelTY Neely
Vice President/COO
World Fiber Technologies, Inc.
4070 Nine McFarland Dr
Alpharetta, GA 30004
email : jneely@ worldfibeltech.com
All notices required by this Agreement shall be in writing to the representative listed above with
a courtesy copy to the following:
Jack Allen
Purchasing Services Manager
Okaloosa County Purchasing Department
602C North Pearl St
Crestview, FL 32536
email: jallen@co.okaloosa.f1.us
IN WITNESS WHEREOF, the County Administrator, by authority vested in him, has
hereunto subscribed his name on behalf of Okaloosa County, Florida, the Owner, and the said
World Fiber Technologies, Inc. has hereto fixed his signature, the day and year above written.
WORLD FIBER TECHNOLOGIES, INC.
WITNESS: ffi~(~ £~((EO
f7rJ1kd. Mark L. Battle, President/CEO
By:
s D. Curry
ty Administrator
-
EXHIBIT "A"
UNIT PRICES
Maintenance Contract for Okaloosa County Fiber Optic Network
Small Addition Work Unit Price UOM
2" Conduit Underground $ 7.19 LF
Each Additional Conduit $ 1.75 LF
Conduit Under Pavement $ 12.80 LF
2" Schedule 80 PVC Bridge Conduit $ 30.85 LF
I Each Additional Conduit $ 2.75 LF
Fiber Pull Boxes $ 1,400.00 EA
Fiber Splice Boxes $ 2,500.00 EA
Coming 6 Fiber Drop Cable (no special marking) $ 2.50 LF
Coming 24 Fiber Drop Cable (no special marking) $ 2.62 LF
Coming 48 Fiber Drop Cable (no special marking) $ 3.06 LF
Coming 72 Fiber Drop Cable (no special marking) $ 3.31 LF
, Coming 96 Fiber Drop ~able (no special marking) $ 3.62 LF
, Coming 144 Fiber Drop Cable (no special marking) $ 5.00 LF
Coming 288 Fiber Drop Cable (no special marking) $ 6.50 LF
I Fusion Splices (includes Testing) $ 50.00 EA
I Fiber Terminations (includes Testing) $ 50.00 EA
I Splice Enclosures up to 72 fiber $ 908.00 EA
Splice Enclosures up to 144 fiber $ 1,058.00 EA
Splice Enclosures up to 288 fiber $ 1,320.00 EA
Fiber Distribution Centers up to 24 tiber $ 500.00 EA
Fiber Distribution Centers up to 72 fiber $ 765.00 EA
I Fiber Distribution Centers up to 144 fiber $ 980.00 EA
Fiber Distribution Centers up to 288 fiber
! $ 1,220.00 EA
I Building Entries $ 500.00 EA
ConduitlFiber ReQair Crew Hour (2-man crew) $ 151.00 HR
Fiber Trouble Shooting (John Nance) $ 123.00 HR
Emergency Response Level III (24-48 Hour Response) $ 1,250.00 EA
Emergency Response Level II (12-24 Hour Response) $ 2,500.00 EA
Emergency Response Level I (0-12 Hour Response) $ 3,500.00 EA