READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — July 2, 2013 — 3114 — reading text

Part 5 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 92-3114.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

27 1999 Mitigation in Flood- $540,000.00 X No Funding 1 year Existing Y 31 Loss Structures elevation or acquisition due Storm, Storm Surge Beach Beach Dept. Walton Beach prone locations to frequent flooding during storm events. All traffic signals that are not All Jurisdictions - currently on mast arms Building Construction mast arms are Intersection Mast rated at 140 mph need to be City of Fort Walton City of Fort Walton City of Fort Walton Beach - Public 28 2010 All hazards and Wind; $896,000.00 X No Funding 1 year Existing located on Y 30 Arms updated. There are six Beach Beach Works Dept. Communications Hurricane intersections for a total of evacuation routes 18 mast arms needed. The Kennedy Lakes area in NW Crestview is plagued by low water pressures, While the pressure is adequate to provide water to residences, Elevated Potable it is dangerously low for fire City of Crestview - Water & Sewer 29 Water Storage Tank- 2010 Wildfire yes City of Crestview City of Crestview $1,000,000.00 X No Funding 270 days Existing City of Crestview Y 30 protection. The storage tank Dept. Kennedy Lakes Area is necessary to provide additional storage and head pressure to flight wildfires or multiple structure fires in this area. Stormwater drainage analysis and infrastructure Unincorporated Hurricane & Tropical Port Dixie Stormwater repair/replacement for the Okaloosa County 30 2010 Storm; Flood; and yes Okaloosa County Okaloosa County Okaloosa County - Public Works Dept. $5,000,000.00 X No Funding 770 days Existing Y 30 System Repair Port Dixie drainage area to within the Port Severe Storms resolve regional flooding Dixie Area and stormwater problems. E-3 Okaloosa County 2011 LMS Appendex E YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE NEW COMPLETED DELETED DEFERRED Points Installation of standby generators at each of 8 existing un-interuptable standvy generators at power supply City of 31 8 power supply 2011 locations.Ensures All hazards yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $77,000.00 X No Funding 6 months Existing Y 30 Valparaiso locations continuted operation of cable communication system for emergency broadcast capabilities Northern Pines - Unincorporated Regional stormwater Hurricane & Tropical Forest Heights Okaloosa County 32 2010 management and drainage Storm; Flood; and yes Okaloosa County Okaloosa County Okaloosa County - Public Works Dept.

Download this text file with its original spacing ↓