READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 16, 2014 — Traffic Move Expense - World Fiber — reading text
Part 2 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 258-Traffic Move Expense - World Fiber.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
provided cable in existing conduit (already proofed) Fiber counts $935 | LE
96 thru 288 (<= 1000 LF)
Install provided cable in existing conduit (already proofed) Fiber counts $2151 LF
96 thru 288 (> 1000 LF and <= 3000 LF)
Install provided cable in existing conduit (already proofed) Fiber counts $2.00 | LE
96 thru 288 (> 3000 LF) |
Proof existing duct (includes mule tape) $0.44 | LF |
Building Entries (if part of conduit install project) $250.00 | EA
Install provided pull box less than 30"x48"x36" to FDOT standards 6398001 EA
(concrete collar not included)
Install provided pull box 30"x48"x36" or larger to FDOT standards $1.570.00| EA
(concrete collar not included)
PRINTED/ADDED BY BCC FINANCE
WORLD FIBER TECHNOLOGIES
OKALOOSA COUNTY INFORMATION SYSTEMS FIBER OPTIC MAINTENANCE
TASK ORDER #11
CONTRACT: C10-1838-IS
APPROVED DATE: 6/19/13
APPROVED BY: ERNIE PADGETT, COUNTY ADMINISTRATOR
TASK
ACTUAL WORK ORDER
(NOT TO EXCEED} TOTAL
ORGINAL TASK ORDER 45,000.00 __45,000.00
DATE CHECK# INVOICE -= = 0
9/12/2013 1308637 1212213A _—«=19,220. 00. 19,220.00
6/5/2014 RETURNED 12122178 19,507.24 19,507.24
38,727.24 38, er. 24
REFERENCE: PURCHASING'S ONLINE CONTRACTS
PRINTED/ATTACHED BY: BCC FINANCE
EXHIBIT “A”
UNIT PRICES
Maintenance Contract for Okaloosa County Fiber Optic Network
Small Addition Work © Unit Price UOM
2” Conduit Underground $7.19 LF
Each Additional Conduit $ 175 | LF
Conduit Under Pavement $ 12.80 LF
2” Schedule 80 PVC Bridge Conduit _|$ 30.85 LF
Each Additional Conduit _ $ 2.19 | LF
Fiber Pull Boxes $ 1,400.00 | EA
Fiber Splice Boxes | $ 2,500.00 EA
Corning 6 Fiber Drop Cable (no special marking) _ $ 2.50 LF
Corning 24 Fiber Drop Cable (no special marking) $ 2.62 LF
Corning 48 Fiber Drop Cable (no special marking) _ $ 3.06_ LF
Corning 72 Fiber Drop Cable (no special marking) $ 3.31 _LF
Corning 96 Fiber Drop Cable (no special marking) > 3.62 CF
Corning 144 Fiber Drop Cable (no special marking) $ 5.00. LF
Corning 288 Fiber Drop Cable (no special marking) $ 6.50 LF
Fusion Splices (includes Testing) _ $50.00 EA
Fiber Terminations (includes Testing) $ 50.00 EA
Splice Enclosures up to 72 fiber $ 908.00 EA
Splice Enclosures up to 144 fiber $ 1,058.00 EA
Splice Enclosures up to 288 fiber $ 1,320.00 EA
Fiber Distribution Centers up to 24 fiber $ 500.00 | #£4xEA
Fiber Distribution Centers up to 72 fiber $ 765.00 EA
Fiber Distribution Centers up to 144 fiber $ 980.00 EA
Fiber Distribution Centers up to 288 fiber $ 1,220.00 — EA
Building Entries 7 i$ 500.00 EA |
Conduit/Fiber Repair Crew Hour (2-man crew) $ 151.00 HR
Fiber Trouble Shooting (John Nance} $ «123.00 HR
Emergency Response Level III (24-48 Hour Response) $ 1,250.00 EA
Emergency Response Level II (12-24 Hour Response) $ 2,500.00 EA
Emergency Response Level I (0-12 Hour Response) $ 3,500.00 EA _
TO COPIES PROVIDED BY PURCHASING
PRINTED/ADDED BY: BCC FINANCE
Okaloosa County Information Systems Fiber Optic Maintenance
Contract Number C10-1838-I$
Task Order 11 FILED
CONTRACT #: Cj10-1838-I$
TASK ORDER #: J]
TASK ORDER AMOUNT: $45,000.00
OFFERED BY CONSULTANT.
World Fiber Technologies, inc.
DON W. HOWARD
(013 JUN 21 AM I7 33
“CLERK OF va CUIT COURT
OKALOOSA COUNTY, FL.
CRESTVIEW, FL.
FIRM’S NAME
JERRY youry
hy PRINTED NAME
SIBNATURE "
Yi Pres rae A S-a/-13
TITLE DATE
RECOMMENDED FOR APPROVAL
(Deparment Director)
ZL both
CZ 1
SIGNATURE
Rector, Dnscemaned Systems
TITLE
OL ¢ 213
DATE
-_
7 ‘ Vi, Yip
COUNTY ADMINISTRATOR fif applicable}
O/19/f3
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
© $25,000 or less approved by Purchasing
Director
e Between $25,001 and $50,000 approved
by Purchasing Director and County
Administrator |
e Inexcess of $50,000 approved by ihe
Board.
-ff / | len L. biunadd
rC/
PURCHASING DIRECTOR
Yb-17- (4
DATE
N/R
CHAIRMAN (if doplicable)
DATE
TO COPIES PROVIDED BY PURCHASING
PRINTED/ADDED BY: BCC FINANCE
Okaloosa County Information Systems Fiber Optic Maintenance
Contract Number C10-1/838-IS
Task Order 1}
This Task Order is issued pursuant to the Agreement for Maintenance for
Okaloosa County Fiber Optic Network dated November 17', 2010, Befween
Okaloosa County, Florida and World Fiber Technologies, Inc., which is
incorporated herein by this reference, with respect to
Scope of Basic Services
for
Okaloosa County Information Systems Fiber Optic Maintenance
PURPOSE
The purpose of this Task Order is to authorize and direct fhe CONTRACTOR
(World Fiber Technologies, Inc.) to proceed with necessary installation, testing or
maintenance services for the Okaloosa County Information systems Department
(OWNER}. The activities that are included are described in "Scope of Services.”
SCOPE OF SERVICES
The CONTRACTOR [World Fiber Technologies, Inc.) agrees to perform the
technical and construction related services in accordance with contract C10-
1838-IS dated November 17'", 2010 as requested and directed by the OWNER.
1. Emergency Response Level |, Il, or Ill as necessary to react quickly to
scheduled or unscheduled fiber optic outages.
2. Furnishing and installing 2" conduit, pull boxes, splice enclosures, fiber
optic cable, terminations, splices and troubleshooting and any other
related materials, equipment or labor to properly maintain or extend the
county fiber optic network on an as-needed basis.
COMPENSATION PROVISIONS
As compensation for providing the services under this Task Order, the OWNER
shall pay the CONTRACTOR in accordance with the November 17th, 2010
agreement for the actual work completed and accepied by the OWNER.
Invoicing must show specific quantities and grouped by each assigned task with
sufficient detail to fully report results, conclusions, and recommendations as
required. Each invoice will also show total to date of all invoices under this task
order.
The Not to Exceed (NTE) amount for this task order is: $45,000.00
TO COPIES PROVIDED BY PURCHASING
PRINTED/ADDED BY: BCC FINANCE
Okaloosa County Information Systems Fiber Opfic Maintenance
ontract Number C10-1838-IS
Task Order | 1
PERIOD OF SERVICE
The schedule for the services provided under this task order shall be in
accordance with the November 17, 2010 Agreement and will remain in effect
until the NTE amount ts reached or otherwise terminated by the OWNER
a
AUTHORIZED-F NTATIVES
The Authorized Representatives designated below are authorized to act with
respect to this Task Order. Communications between the parties shall be
through the Authorized Representatives:
For OWNER: For CONTRACTOR:
Dan Sambenedetio Jerry Neely
dsambenedeitto@co.okaloosa.il.us jneely@worldfiber.com
}804 Lewis Turner Blvd Suite 402 4070 Nine McFariand Dr
FWB, FL 32547 Alpharetta, GA 30004
850-651-7570, 850-200-5346 404-425-3340
REFERENCE: PURCHASING'S ONLINE CONTRACTS
PRINTED/ATTACHED BY: BCC FINANCE
EXHIBIT B
CONTRACT, LEASE, AGREEMENT CONTROL FORM
Date: 4) 2D /z0y
Contract/Lease Control #: C10-1838-IS
Bid #: NA Contract/Lease Type: AGREEMENT
Award To/Lessee: WORLD FIBER TECHNOLOGIES, INC.
Lessor/Owner: OKALOOSA COUNTY
Effective Date: 11/17/2010
Expiration Date: 11/17/2014 N° fence wal
a
Description of Contract/Lease: FIBER OPTIC NETWORK MAINTENANCE
Department Manager: IS
Department Monitor: DON VANDERHOEK
Monitor's Telephone #: 651-7570
Monitor's FAX # OR E-Mail: DVANDERHOEK@CO.OKALOOSA.FL.US
Date Closed:
Cc: Finance Dept Contracts & Grants Division:
: OR a OSE eer ae :
B You Nave ary questions please contact Jack Allen at 850-669-5960, %
| 4070 Nine McFariand Dr
EXPIRES: 11/17/2014
COUNTY REPRESENTATIVE
REFERENCE: PURCHASING'S ONLINE CONTRACTS
PRINTED/ATTACHED BY: BCC FINANCE
Board of County Commissioners
7 Purchasing Di Department
November 13, 2012
RENEWAL
CONTRACT # C10-1838-IS
Worl Fiber Nenntosies, Inc. WORLD FIBER TECHNOLOGIES, INC.
FIBER OPTIC MAINTENANCE
Alpharetta, GA 30004
Dear Jerry:
The Okaloosa County Information Systems Department wishes to renew the subject
comract/lease, for an additional two year term. The contract renewal period will be from
11/18/12 to 11/17/14.
ay please sign below and return this form along with a
Lewis Tamer Blvd, Suite 402, Fort Walton Beach, FL 32547.
AUTHORIZED COMPANY REPRESENTATIVE
O +:
naar gars Contractor: wolopey, Fee:
, CO Yo~ he hoe K DOK AAD Qaa/i20
proved By: §-“O2z HY w~ eh, fim © Approved By: | * N7\\ Pandy
Print Name: Don Vanderhoek Print Name: Mane, 6. QAt- IE
Title: Director Tie: Peesinwt / 72D |
Date: Date: il (4-1m%e
County Department Instructions:
1) Obtain signatures from Department Director and authorized Company
| Representative.
2) Make sure the compaerny provides a current Certificate of Insurance. (if
spplicable)
3) Keep a copy of this form for your records.
4) Send original to; Jack Allen, Purchasing Services Manager.
wrPuin
Dead
(nor washon CamyVace
ys EFERENCE: PURCHASING'S ONLINE CONTRA
PRMATED/ATTACHED BY: BCC FINANCE
frxed fee
Purpose: _ 2 At yanc etalananss of fr ber Oph NMolwork
EXHIBIT D Le
~cONTRAG RE
INTERNAL COORDINATION SHEET
Contract/Lease Number:_ | __ Tracking Number: /92 /D
| Contractor/Lessee Name: ria by ceNnolugiv: | nc
Date/Term: Year >
Amount: pur A pes han eat
| Department: | G
1. GY GREATER THAN $50,000
2. () GREATER THAN $25,001
3. [.) $25,000 OR LESS
Dept. Monitor Name: —__ 1). Vantecheck
oe eee
Purchasing Review
Date: W? 2a/j0 _
oes
—
a
i
Be
Risk Management Review
staan Date: Lark,
_L\ _
| County Attorney XK : Date: / Ly Aa
OO a aaanEEEeneeee te
Following Okaloosa County approval:
Contract & Grant 7
Document has been received:
Date:
Contracts & Grants Manager
REFERENCE: PURCHASING'S ONLINE CONTRACTS
: PRINTED/ATTACHED BY: BCC FINANCE
CONTRACT #C 10-1838-IS
WORLD FIBER TEC LINOLOGIES, INC.
EIBER OPTIC NETWORK MAINTENANCE
CX PIRES: PE/17/2012
Maintenance Contract for Okaloosa County Fiber Optic Network
This Agreement, in triplicate, executed in Fort Walton Beach, Florida this / A day of
(Vor bm he be , 2010 is between Okaloosa County, Florida, the owner, hereinafter called the
party of the First part, and World Fiber Technologies, Inc. of its successors, executors,
administrators and assigns, hereinafter called the Party of the Second part.
WITNESSETH:
That for and in consideration of payments, hereinafter mentioned, to be made by party of
the First Part, the Party of the Second Part agrees to furnish all equipment, machinery, tools and
labor: to furnish and deliver all materials required to be furnished and delivered in and about two
(2) years maintenance period to begin upon execution of signatures by both parties, and to do
and perform the maintenance of the Okaloosa County Fiber Optic Network and pay the unit
prices as attached on Exhibit “A”, which is made a part of this Agreement. Work to be issued on
task orders as needed and in strict conformity with the provisions of this Contract. This Contract
may be renewed for one additional two year period.
SCOPE OF WORK:
The project covers task orders for furnishing and installing 2” conduit, pull boxes, splice
boxes, fiber optic cable, termination, splices, splice enclosures, emergency response and trouble
shooting. All work on this contract is subject to the same standards as previous contracts for
Phase | through phase V.
The Contractor shall be prepared to begin work as required by the task orders. The place
where the work is to be started will be stated in the task orders. The work shall be prosecuted
from as many different points, in such part or parts and at such times as may be directed, and
shall be conducted in such a manner and with sufficient materials, equipment and labor as is
considered necessary to insure it s completion with the time set forth in the task orders.
All specifications relating to conduit installation shall be compliant with what is set forth
in the FDOT specifications for installation and the Technical Special provisions for Phase V.
INSURANCE REQUIREMENTS:
Contractor will provide a copy of insurance certificate listing Okaloosa County as
