READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 15, 2013 — AVCON Task Order 9 Cover Letter — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 54-AVCON Task Order 9 Cover Letter.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

AVCON, INC. ENGINEERS & PLANNERS 320 Bayshore Drive, Suite A Niceville, Florida 32578 Phone: (850) 678-0050 Fax: (850) 678-0040 TASK ORDER SUMMARY www.aveonine.com Professional Consulting Services Okaloosa County Public Works Task Order No. 09 AVCON Project No. 2013.125.01 Date: May 3, 2013 AVCON, INC., a Florida Corporation (hereinafter “CONSULTANT”) agrees to perform and complete the following services (hereinafter “Services”) for Okaloosa County Public Works (hereinafter “COUNTY”), in accordance with the terms and conditions of the Agreement for Consulting Engineering Services (Contract No.: C06-1347-PW2-119), dated March 24, 2006 (extended on March 5, 2008), all of which terms and conditions are incorporated herein by reference. 1. Task Location: Fort Walton Beach, Okaloosa County, Florida 2. Task Name: Palm Village Condominium Development 3. Task Description/Scope of Services; CONSULTANT shall perform professional services contained in Exhibit “A” dated May 3, 2013 and attached hereto. 4. Compensation: The collective project budget shall not exceed Fifty-Seven Thousand, Eight Hundred Eighty-Six and_00/100 dollars ($57,886.00 NTE). All services performed directly by CONSULTANT under this Task Order as described in Item 3 above shall be compensated on a Not-To-Exceed (time-and-materials) basis. CONSULTANT shall be compensated based on actual expenses incurred. Direct expenses necessary to perform the services, including printing/plotting charges, shall be reimbursed at actual cost. Subconsultant fees performed under this Task Order shall be compensated for on a Not-To-Exceed basis. The Not-To-Exceed limit for all services shall be Fifty- Seven Thousand, Eight Hundred _Eighty-Six and 00/100 dollars ($57,886.00 NTE). Progress payments shall be made monthly. CIVIL & STRUCTURAL ENGINEERING ® AIRPORT & AVIATION CONSULTING @& TRANSPORTATION DESIGN & PLANNING

Download this text file with its original spacing ↓