READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 24, 2013 — Sixel Consulting Group, Inc. Agreement and Invoice — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 46-Sixel Consulting Group_ Inc. Agreement and Invoice.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Air Service Development
Presented to:
Northwest Florida Regional Airport
NORTHWEST
FLORIDA _
x
Y VPS
" REGIONAL
AIRPORT
A SERVICE OF ORALCOSA COUNTY &
by:
bebeg
vamencrvne
tae weeray
Sixel Consulting Group, Inc.
Air Transportation and Airport Consulting Services
Alr Service Development Agreement
Northwest Florida Regional Airport « Sixel Consulting Group. inc.
December 2012 » Page | of 4
1. Contact Information
Client:
Mike Stenson
Deputy Airport Director
Northwest Florida Regional Airport
1701 State Road 85 North
Eglin AFB, FL 32542
www flyyps.com
phone: 850.651.7160
Consultant:
Mark Sixel
President
Sixel Consulting Group, Inc.
497 Oakway Road, Suite 220
Eugene, OR 97401
www.sixelconsulling.com
mark@sixelconsulting.com
phone: 541.341.1401
fax: 541.341.1603
Project Lead:
Michael Lum
Alr Service Strategy and Development
Consultant
michael. lum@sixelconsulting.com
phone: 972.896.9174
2. Project Overview
Sixel Consulting Group (“Consultant”) proposes to work with Northwest Florida Regional
Airport (“Airport”) on project(s) to recruit additional airline service to/from VPS. The
projects will include a number of components. detailing the Airport's catchment area
and demographics, historical air service, competing air service at nearby airports and
comparisons to other similarly sized markets around the country.
Targeted Airlines:
Frontier, United
For each Targeted Airline, Consultant will complete the following tasks:
Air Service Development Agreement
Northwest Florida Regional Airport ¢ Sixel Consulting Group, Inc.
December 2012 » Page 2 of 4
1. Determine and map the Airport's catchment area, providing specific
demographics of the area including, but not limited to, population
growth/decline, unemployment and economic background information.
2. Consultant will analyze passenger traffic and revenue and average fare data
to/from Airport over the prior six-year period. Consultant will analyze seasonality,
day of week and time of day demand for local traffic over the prior two year
period.
3. Consultant will propose flights and schedules by aircraft type, time of year, time
of week and time of day as well as project connecting flights available for each
inbound / outbound flight.
4. Consultant will prepare presentation and arrange conference call and / or
meeting with airline.
5. Consultant will provide follow-up information and information as requested
leading up to conferences as desired by airlines that is requested as a direct
result of information provided by Consultant, at the discretion of Consultant.
6 Consultant will provide all other pertinent information not specified above that
Consultant deems necessary to complete this section of Agreement.
3. Project Cost
presi tay =
Consultant is prepared to begin work immediately, with conference calls targeted to
occur from December 2012 through February 2013.
Project Costs:
Frontier Preparation and Conference Call: $6,500 {discounted from $10,000)
Travel to DEN for meeting (if needed)*: $ 0 (discounted from $ 1,500)
Alr Service Development Agreement
Northwest Florida Regional Airport « Sixel Consulting Group, Inc.
December 2012 « Page 3 of 4
United Airlines Preparation and Conference Call: $6,500 (discounted from $ 8,500)
Travel to ORD for meeting (if needed)*: $ 0 (discounted from $ 1,500)
Should Consultant be unable to secure any above conference calls by the end of
February 2013, Consultant will attempt to secure face-to-face meetings af Network USA
in March. The cost per meeting would revert to standard conference pricing; $4,500 for
initial meeting, $2,500 for subsequent meetings.
“Travel expenses will be approved by the Airport's designee before it is booked by
Consultant, billed af cost plus 10%. Color printing is charged ai $1 per page.
Renresenii Northwest Florida Regional Airport
Michel SO SG
{print name}
Dated this At day of | A on
Purchasing Director, Northwest Florida Régional Airport
(ete c. (Ode
{print name}
Dated this YY day ot HHL: poe */4G)
Mark Sixel, President, Sixel Coftsulting Group, Inc.
_O _
Dated this }© day of VEC-_ 2012
Air Service Development Agreement
Northwest Florida Regional Airport » Sixel Consulting Group, Inc.
December 2012 « Page 4 of 4
Sixel Consulting Group, Inc.
497 Oakway Rd, Ste 220
Eugene, OR 97401
Bill To:
NV Florida Regional Airport
Michael J. Stenson
Deputy Airport Director
4701 State Road 85 North
Eglin AFB, Florida 32542
ze on
Pca 3
he Sixel iro torg Grete ing
i A Sa ruice Bancotopriedt
invoice
Invoice #: VPS 021301
invoice Date: 2/14/2013
Due Date: 2/14/2013
Project:
P.O, Number:
Date Description Amount
1/24/2013 United Airlines Headquarters Meeting 6,500.00
1/24/2013 Airfare 513.80
1/24/2013 ; Lodging 126.88
1/24/2013: Transportation Costs 417,54
1/24/2013 In- House Printing Costs (2geplestaf 371.00
A@Stipage ees
1/24/2013 Administration Fee 75.82
Total $7,705.04
Payments/Credits $0.00
Balance Due $7,705.04
Phone # Fax:
E-Mail
Web Site
541-341-1601 f 541-341-1603
karen(@sixelconsulting,com
www,sixelconsulting.com
