Machine-extracted text — 83-MSBUpolicy_GTS-3--20140428-REVISED-MarkedVersion.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Ferdon Blvd
Crestview, FL 32536
(850) 689-5772
The request must identify:
• the area affected (e.g., community, subdivision or street)
• the type of improvement involved (i.e., street lighting)
• the type of district Unit contemplated (i.e., street lighting)
Application for DistrictUnit
Application can be made by interested property owners for establishment of a new
street lighting district Unit or changes or additions to an existing one.
In order to proceed with establishing a new district Unit interested homeowners or
property owners must submit the following as the official request for consideration:
• $100.00 application fee (per street lighting districtUnit) made payable to the
Board of County Commissioners, Okaloosa County.
• Contact individual and proposed liaison names, addresses and phone numbers.
• A copy of the cost estimate for streetlight improvements as prepared by the
appropriate power provider.
• Copy of a map with:
o Proposed boundaries for the district Unit outlined.
18
o Boundaries must be continuous and not split parcels or lots. Enclaves are
not allowed if the reason is to remove a lot or lots because the property
owner is not in favor of establishment of the districtUnit.
o Tracts for drainage, buffer zones, etc. are usually included in the
Unitdistrict but not assessed for street lighting.
o The district Unit to be assessed does not necessarily include an entire
subdivision if the entire subdivision does not materially benefit from the
proposed action.
o Districts Units must contain a minimum of two distinct taxable (or platted)
pieces of property.
Petition Submission
The Board of County Commissioners has determined that a petition may serve as an
indicator of the amount of community interest for a proposed project. The petition
process is not a requirement of Florida Law.
Public Works will prepare a petition for distribution by the District Unit Liaison. Only
petitions prepared by Public Works will be accepted.
The petition will reflect the various charges included in calculating the assessments.
The street lighting assessment will include: all costs associated with installation of the
streetlights, as determined by the appropriate power provider, 5% administrative fees
for collection of the assessments, and a reserve which totals 120% of the proposed
yearly expenditures.
Petition Acceptance
The petition, to be accepted, must be signed by at least 51% of the current property
owners (number of owners) representing at least 51% of property (number of lots or
number of front feet, measured consistent with the method of assessment) within the
district Unit boundaries.
• A property owner is the individual or group of individuals that own a parcel of
land.
• In determining eligible signatures of owners, all of the non-related current owners
of a parcel or the designated trustee must sign the petition for the ownership and
parcel to count towards the 51% requirements.
19
• Once submitted, names may not be withdrawn from the petition.
Upon return, Public Works will review the petition for acceptability, consulting other
departments as appropriate.
If the petition is acceptable, Public Works will request that the Board of County
Commissioners schedule a public hearing for consideration of the ordinance to establish
the district Unit or revisions to the ordinance for the existing district Unit to incorporate
the changes. Please note that once the petition is accepted and a public hearing is
authorized, the petition is no longer relevant to the final determination by the Board of
County Commissioners to proceed (or not) with the project. The final determination of
the scope and feasibility of a project will be determined by Okaloosa County.
Public Hearing
When the proposed ordinance and all documents are in order and a public hearing date
is scheduled, legal notices will be published. In addition, notification will be mailed by
U.S Postal first-class mail to all property owners listed on the tax roll within the
proposed districtUnit.
At the public hearing, the Board of County Commissioners may consider comments,
objections, and information relevant to the creation of the districtUnit. The County
Commissioners will enact or deny the ordinance. If the ordinance is enacted,
appropriate Board authorization to record the Ordinance in the Recording Department,
Okaloosa County Clerk’s Office, will be requested.
Implementation
Upon execution of the Ordinance by the Board, the local power provider can begin
installation of the lights and poles to be put in service.
Modifications to Existing Street lighting UnitsDistricts
Modifications to street lighting districts Units may be requested by property owners
within the existing districtUnit. Requests are made in writing to Public Works and must
follow all procedures listed above beginning with the petition submission. Cost
estimates, as provided by the appropriate power provider, for any modifications to an
existing district Unit will be included in the petition.
20
APPLICATION AND DESIGNATION OF SPECIAL DISTRICTUNIT
CONTACT/LIAISON INDIVIDUALS
Primary Liaison for designation on petition and coordination during implementation of
DistrictUnit:
Name _________________________________________________
Street Address______________________________________________________
City/Zip Code_______________________________________________________
Phone Numbers – Day________________________
After Hours___________________
Back-up Liaison:
Name _________________________________________________
Street Address______________________________________________________
City/Zip Code_______________________________________________________
Phone Numbers – Day________________________
After Hours___________________
Community, Subdivision or Street Name for the Project
_______________________________________________
Type of Improvement (streetlighting, road paving, etc.)
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
21
22