READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 6, 2014 — MSBUpolicy_GTS-3--20140428-REVISED-MarkedVersion — reading text

Part 4 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 83-MSBUpolicy_GTS-3--20140428-REVISED-MarkedVersion.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Ferdon Blvd Crestview, FL 32536 (850) 689-5772 The request must identify: • the area affected (e.g., community, subdivision or street) • the type of improvement involved (i.e., street lighting) • the type of district Unit contemplated (i.e., street lighting) Application for DistrictUnit Application can be made by interested property owners for establishment of a new street lighting district Unit or changes or additions to an existing one. In order to proceed with establishing a new district Unit interested homeowners or property owners must submit the following as the official request for consideration: • $100.00 application fee (per street lighting districtUnit) made payable to the Board of County Commissioners, Okaloosa County. • Contact individual and proposed liaison names, addresses and phone numbers. • A copy of the cost estimate for streetlight improvements as prepared by the appropriate power provider. • Copy of a map with: o Proposed boundaries for the district Unit outlined. 18 o Boundaries must be continuous and not split parcels or lots. Enclaves are not allowed if the reason is to remove a lot or lots because the property owner is not in favor of establishment of the districtUnit. o Tracts for drainage, buffer zones, etc. are usually included in the Unitdistrict but not assessed for street lighting. o The district Unit to be assessed does not necessarily include an entire subdivision if the entire subdivision does not materially benefit from the proposed action. o Districts Units must contain a minimum of two distinct taxable (or platted) pieces of property. Petition Submission The Board of County Commissioners has determined that a petition may serve as an indicator of the amount of community interest for a proposed project. The petition process is not a requirement of Florida Law. Public Works will prepare a petition for distribution by the District Unit Liaison. Only petitions prepared by Public Works will be accepted. The petition will reflect the various charges included in calculating the assessments. The street lighting assessment will include: all costs associated with installation of the streetlights, as determined by the appropriate power provider, 5% administrative fees for collection of the assessments, and a reserve which totals 120% of the proposed yearly expenditures. Petition Acceptance The petition, to be accepted, must be signed by at least 51% of the current property owners (number of owners) representing at least 51% of property (number of lots or number of front feet, measured consistent with the method of assessment) within the district Unit boundaries. • A property owner is the individual or group of individuals that own a parcel of land. • In determining eligible signatures of owners, all of the non-related current owners of a parcel or the designated trustee must sign the petition for the ownership and parcel to count towards the 51% requirements. 19 • Once submitted, names may not be withdrawn from the petition. Upon return, Public Works will review the petition for acceptability, consulting other departments as appropriate. If the petition is acceptable, Public Works will request that the Board of County Commissioners schedule a public hearing for consideration of the ordinance to establish the district Unit or revisions to the ordinance for the existing district Unit to incorporate the changes. Please note that once the petition is accepted and a public hearing is authorized, the petition is no longer relevant to the final determination by the Board of County Commissioners to proceed (or not) with the project. The final determination of the scope and feasibility of a project will be determined by Okaloosa County. Public Hearing When the proposed ordinance and all documents are in order and a public hearing date is scheduled, legal notices will be published. In addition, notification will be mailed by U.S Postal first-class mail to all property owners listed on the tax roll within the proposed districtUnit. At the public hearing, the Board of County Commissioners may consider comments, objections, and information relevant to the creation of the districtUnit. The County Commissioners will enact or deny the ordinance. If the ordinance is enacted, appropriate Board authorization to record the Ordinance in the Recording Department, Okaloosa County Clerk’s Office, will be requested. Implementation Upon execution of the Ordinance by the Board, the local power provider can begin installation of the lights and poles to be put in service. Modifications to Existing Street lighting UnitsDistricts Modifications to street lighting districts Units may be requested by property owners within the existing districtUnit. Requests are made in writing to Public Works and must follow all procedures listed above beginning with the petition submission. Cost estimates, as provided by the appropriate power provider, for any modifications to an existing district Unit will be included in the petition. 20 APPLICATION AND DESIGNATION OF SPECIAL DISTRICTUNIT CONTACT/LIAISON INDIVIDUALS Primary Liaison for designation on petition and coordination during implementation of DistrictUnit: Name _________________________________________________ Street Address______________________________________________________ City/Zip Code_______________________________________________________ Phone Numbers – Day________________________ After Hours___________________ Back-up Liaison: Name _________________________________________________ Street Address______________________________________________________ City/Zip Code_______________________________________________________ Phone Numbers – Day________________________ After Hours___________________ Community, Subdivision or Street Name for the Project _______________________________________________ Type of Improvement (streetlighting, road paving, etc.) ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 21 22

Download this text file with its original spacing ↓