READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 6, 2014 — MSBUpolicy_GTS-3--20140428-REVISED-MarkedVersion — reading text
Part 3 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 83-MSBUpolicy_GTS-3--20140428-REVISED-MarkedVersion.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
County identified in
the Detailed Procedures
DISSOLUTION PROCEDURES FOR MSBUs
Upon written request, the County will provide guidelines for dissolving an existing
districtUnit. The steps to take in requesting dissolution of a district Unit are:
9
• Submission of an application to dissolve the district Unit and $100 application
fee.
• Submission of a petition which includes a statement regarding funding to
pay for any outstanding financial obligations and distribution of credits of
the districtUnit.
• The petition, to be considered, must be signed by at least 66% (51% for
Street Lighting DistrictsUnits) of the current property owners (number of
owners) representing at least 66% (51% for Street Lighting DistrictsUnits)
of the assessed properties (measured consistent with the method of
assessment) within the district Unit boundaries.
• Notice and Public Hearing by the Board of County Commissioners to
establish final assessments
EXCEPTIONS TO THE GUIDELINES
The Board of County Commissioners may address exceptions to any of the guidelines
on a case-by-case basis.
QUESTIONS?
Contact the Okaloosa County Public Works 850-689-5772
NOTE: Detailed Procedures for each type of District Unit should be consulted for more
specific information concerning requirements and procedures.
10
DETAILED PROCEDURES, CONSTRUCTION DISTRICTSUNITS
11
CONSTRUCTION DISTRICTSUNITS
DETAILED PROCEDURES
Initial Request for MSBU Procedures
Upon request of the procedures to establish an MSBU, Public Works will forward a copy
of the “Guidelines and Procedures” booklet to the requestor. The request should be
made to:
Okaloosa County Public Works
1759 South Ferdon Blvd.
Crestview, Florida 32536
(850)689-5772
The request must identify:
• the area affected (e.g., community, subdivision or street)
• the type of improvement involved (e.g., paving or drainage)
• the type of district Unit contemplated (i.e., construction or street lighting)
Application for UnitDistrict
In order to proceed with establishing a Unitdistrict, interested homeowners must submit
the following as the official request for consideration:
1. Scope of Services for the proposed improvement or construction.
• Thoroughness in describing the desired scope of services is important as it
is the key to the development of more accurate preliminary cost estimates.
2. A map depicting the proposed district Unit boundary.
• Boundaries must be continuous and not split parcels or lots. Enclaves are
not allowed if the reason is to remove a lot or lots because the property
owner is not in favor of the establishment of the Unit.district.
• The district Unit to be assessed does not necessarily include an entire
subdivision if the entire subdivision does not materially benefit from the
proposed action.
• Districts Units may be established in unplatted residential areas where the
proposed action benefits the property owners in a definable geographic
12
area.
• Districts Units must contain a minimum of two distinct taxable (or platted)
pieces of property.
3. Contact person and proposed liaison names, addresses and phone numbers.
4. $100.00 application fee made payable to the Board of County Commissioners,
Okaloosa County.
Application Review/Preliminary Engineering Report
Upon receipt of the application for a MSBU, a letter may be mailed by U.S Postal first-
class mail to each property owner advising of the application’s submittal and the
imminent petition process. The District Unit Commissioner may request an informative
meeting with the property owners to discuss the MSBU process. Upon request by the
district Unit Liaison and with sufficient notice, Public Works is available to attend any
community meetings concerning the establishment of the districtUnit. Notification to
property owners of any County-sponsored meeting will be coordinated through Public
Works. Public Works would appreciate the opportunity to review any correspondence
relating to the establishment of the district Unit prior to circulation.
Public Works will review the items submitted as part of the application to confirm that
the information is complete. The application will then be forwarded to appropriate
departments for review of the scope of work and plat information.
Preliminary engineering is required for sidewalk and roadway/drainage construction or
replacement.
• All engineering and construction will be provided by County staff, contingent
upon approval by the Board of County Commissioners, up to the financial
limits as set forth by Florida State law. Projects exceeding the statutory limits
or staffing capabilities of the County will be competitively bid out for design
and/or construction.
• All material costs will be funded by the MSBU.
County staff will present any requests for County participation in capital projects to the
Board of County Commissioners for consideration.
Petition Submission
The Board of County Commissioners has determined that a petition serves as an
indicator of the amount of community interest for a proposed project.
13
The petition shall reflect the cost for preliminary engineering and the cost estimates for
final engineering and construction, provided by the preliminary engineering report. The
petition shall also reflect the appropriate reserves, contingencies, administrative fees
and interest expense during the construction period. The petition shall be prepared with
assistance from the Public Works Division and the District Unit Liaison.
County staff will identify a date for petition return of 30-60 calendar days based upon
target time frame for public hearing and upon length of time cost estimates will be valid.
Petition Acceptance
The petition, to be considered, must be signed by at least 66% of the current property
owners (number of owners) representing at least 66% of the assessed properties
(number of lots) within the proposed district Unit boundaries.
• A property owner is the individual or group of individuals that own a parcel of
land.
• Okaloosa County Property Appraiser and Tax Collector data shall be used to
determine eligible signatures of owners. All of the non-related current owners
of a parcel or the designated trustee must sign the petition for the ownership
and parcel to count towards the 66% requirements.
• Once submitted, names may not be withdrawn from the petition.
Upon return, County staff will review the petition for sufficiency.
No petition will be accepted without the signatures of all property owners who
would be required to dedicate right-of-ways or easements to the County.
If the petition is accepted, Public Works will request that the Board of County
Commissioners authorize a public hearing for consideration of the ordinance to
establish the districtUnit. Please note that once the petition is accepted and a public
hearing is authorized, the petition is not conclusive to the final determination by the
Board of County Commissioners to proceed (or not) with the project. The final
determination of the scope and feasibility of a project will be determined by Okaloosa
County.
Public Hearing
When the proposed ordinance and all documents are in order and a public hearing date
is scheduled, legal notices will be published. In addition, notification will be mailed by
U.S Postal first-class mail to all property owners listed on the tax roll within the
14
proposed districtUnit.
No public hearing will be scheduled unless all affected property owners have agreed to
dedicate the necessary right-of-way to the County.
At the public hearing, the Board of county Commissioners may consider comments,
objections, and information relevant to the creation of the districtUnit. The County
Commissioners may amend, enact, or deny the proposed ordinance.
Implementation
Final engineering plans are prepared by County staff for construction projects to include
sidewalk, and roadway/drainage work. Property owners are responsible for material
costs of any construction projects. County staff will perform construction work as
approved by the Board of County Commissioners.
• If recalculated project costs, using information derived from final engineering
data, would represent an increase of 20% or more, an additional petition
process will be required and an additional public hearing held. Notice of this
public hearing will be published; in addition, notification will be mailed by U.S
Postal first-class mail to all property owners.
Final Public Hearing
After construction is complete, all costs relating to the project will be compiled by Public
Works. Public Works will request to schedule a Final Public Hearing to adopt the final
assessment through a resolution or amending ordinance. The Public Hearing will be
advertised and notification mailed by U.S Postal first-class mail to all property owners
listed on the tax roll within the districtUnit. If adopted, the Resolution or Amending
Ordinance, including Final Assessment Liens, will be recorded in the Okaloosa County
public records. Term of the repayment for construction costs may be determined as
follows:
Individual Assessment Amount Term
$3,000 and up 10 years
$2,500 to $2,999 8 years
$2,000 to $2,499 6 years
$1,500 to $1,999 4 years
$1,000 to $1,499 3 years
$ 500 to $ 999 2 years
$ -0- to $ 499 1 year
Final determination as to the terms of repayment will be made by the Board of County
15
Commissioners in conjunction with Public Works and the Okaloosa County Clerk of
Courts. Annual Assessments are collected either through the Tax Collector of Okaloosa
County, in the same manner through their inclusion on the billing of either municipal or
Okaloosa County Water and Sewer utility billing or such other methods as approved by
the Board of County Commissioners.as all other County taxes are collected or
assessments will be reimbursed through municipal or Okaloosa County Water and
Sewer utility billing.
16
DETAILED PROCEDURES, STREET LIGHTING DISTRICTSUNITS
17
STREET LIGHTING DISTRICTSUNITS
DETAILED PROCEDURES
Initial Request for MSBU Procedures
Upon request of the procedures to establish an MSBU, Public Works will forward a copy
of the “Guidelines and Procedures” booklet to the requestor. The request should be
made to:
Okaloosa County Public Works
1759 South
