EXHIBIT A
STATEMENT OF WORK
The Scope of Work for. the Project is the complete (100%) construction plans and specifications,
as submitted to Eglin on October 1, 2012, attached as Exhibit 1, hereinafter incorporated into the
Agreement by reference. Plans will be revised to incorporate a tap and lateral to the Aircraft
Rescue and Fire Fighting Station. Line items and notes of the project are listed in Exhibit B. The
County shall provide all employees, equipment, tools, fuel, and supplies for the performance of its
duties as outlined in the scope of work. By execution of this Agreement, Eglin does grant the
County permission to enter upon Eglin Property and shall provide all necessary access required to
perform the tasks as set forth in the scope of work. If access to the area is to be closed or restricted
at any time during the duration of the project, Eglin will provide the County with reasonable
advance notice of such closure or restriction.
In addition to the Scope of Work as provided above, the Parties will be responsible for the
following:
A. EGLIN’S RESPONSIBILITIES:
i. Eglin will be responsible for coordinating and completing Air Force Form 813
(Environmental Review) and Air Force Form 332 (Work Request).
ii. Prior to any digging by the County, existing underground utilities will be located
and marked by Eglin. If Eglin fails to mark a line and it is damaged in the course
of the County’s work on this project, it is the responsibility of Eglin to repair the
line, at its own cost. Any other resulting damages would also be the responsibility
of Eglin,
iii. For safety reasons, Eglin shall provide the following:
i. Flight line drivers training and hand held radios necessary to establish and
maintain radio contact with the Air Traffic Control Tower for contractors
working on the airfield. One or more airfield escorts in communication with
the air traffic control tower will be available when work is being performed
within the Controlled Movement Area next to the runways. The escort(s)
will be responsible for coordinating all temporary airfield pavement
closures as required to facilitate waterline and hydrant installation
associated with the Project.
ii. Any temporary airfield barricades required to delineate County work areas
from active airfield pavements.
iii. Coordination and approval of Notices-to-Airmen (NOTAMs) as required.
iv. Approved access gates and haul routes on the airfield for County equipment
and personnel, including any notification, approval, or other maintenance
of traffic requirements.
v. Approved areas within the airfield perimeter fence for localized staging of
materials and equipment during construction and overnight storage.
vi. Guidance on all setbacks, object free areas, and height limitations for
equipment and personnel during the construction work to ensure airfield
safety.
vii. Immediate notification of any activities by the County related to the Project
incompatible with safe airfield and military activities.
B. COUNTY’s RESPONSIBILITIES:
1 County will be responsible for coordinating and completing Air Force Form
103 (Eglin Dig Permit).
ii. In an effort to double check for any lines prior to digging, the County shall
provide ground penetrating radar services. However, the County does not
assume any liability for unmarked lines that may be damaged.
Construction of the Project shall be substantially completed by March 31, 2017.! Final
Completion shall be April 30, 2017.
In performance of this project, the Parties will comply with all applicable regulatory requirements
including federal, state, special district, and local laws, rules, regulations, orders, codes, criteria
and standards, including, but not limited to, health and safety rules and regulations.
! Substantial Completion is defined as the Parties obtaining a Florida Department of Environmental
Protection (FDEP) clearance letter, so that the new infrastructure may be put into operation.
The County shall not be considered to be in default if delays in or failure to substantially complete
the work on time are due to uncontrollable forces, the effect of which, by the exercise of reasonable
diligence, the County could not avoid. The term “uncontrollable forces™ shall mean any event
which results in the prevention or delay of performance by the County of its obligations under this
Site Work Agreement and which is beyond the reasonable control of the nonperforming party. It
includes, but is not limited to, fire, flood, earthquakes, hurricanes, storms, lightening, epidemic,
war, riot, terrorist attack, civil disturbance, sabotage, and governmental action.