READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 4, 2013 — Exhibit B - Inspection Report — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 85-Exhibit B - Inspection Report.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Memorandum
TO: Edwin S. Sanguyo P.E., Public Works Engineer
FROM: Don Phillips, Engineering Division
DATE: November 5, 2013
SUBJECT: Mossy Oaks Plantation Phase II
Inspection Report for 18-Month Warranty Period
Mossy Oaks Plantation Phase II
MAILING ADDRESS: LENGTH: Approx. Total:
Northwest Florida Land Clearing, LLC
224 Texas Parkway
Crestview, Fl. 32536
TELEPHONE: (850) 978-2142
FILE #05-80953
Irrevocable Standby Letter of Credit NO. 244 (CCB)
Expiration Date: November 5, 2015
RIGHT OF WAY: 50 feet
PAVEMENT WIDTH: 24.0 feet
STREET SIGNS: In place
SUB-GRADE DENSITY: Standard 98%, In place 99.78% avg.
BASE DENSITY: Standard 98.0%, In place 100.00% avg.
ASPHALT DENSITY: Standard 92 (+3.00,-1.20)%, In place 92.23%
ASPHALT THICKNESS ROADWAY: _ Standard 1.50”, In place 1.75”
ASPHALT THICKNESS CUL-DE-SAC; Standard 2.00”; In place 2.25%
GRASSING AND SHOULDERS: Roadside swales and shoulders are
shaped and stabilized with seed & mulch. Sod is installed where additional
stabilization is required. Sod shall replace seeded swales and shoulders as
each lot is developed.
DRAINAGE AND EASEMENTS: All drainage structures are in place.
Retention areas are constructed and stabilized.
6,220’
