READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 6, 2015 — Engineering & Administration — reading text
Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Engineering & Administration — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: ENGINEERING & ADMINISTRATION
PROGRAM DESCRIPTION: The Engineering Division of the Public Works Department provides services
to the public in the areas of, roadway design, stormwater management, topographical and construction
surveying, Land Development Code conformance review, construction inspection, and construction contract
administration.
REVENUE: Engineering Division is funded within the County Transportation Trust Fund. Supporting
revenue of the County Transportation Trust Fund is fuel taxes, local government half-cent sales tax, charges for
services, interest, other miscellaneous revenue and transfers from other funds.
MAJOR ACCOMPLISHMENTS LAST YEAR:
Ø Worked with FDOT in the continued development and advancement of roadway projects on State and
County roads in Okaloosa County; examples include PJ Adams Parkway Improvements, Steel Road Bridge
Replacement and several new Local Agency Program (LAP) Agreements for Safety and Sidewalk projects.
Ø Continued administration and review of the design and right-of-way acquisition for the PJ Adams Parkway
TRIP Agreement with FDOT from SR 85 to I-10 ($4.4M). | Project Ongoing
Ø Worked closely with FDOT, FWB Chamber and Eglin AFB in obtaining a necessary easement for the
Shalimar Gateway Landscaping JPA Agreement. | Project Ongoing
Ø Provided input and review for the Foy Shaw Parkway PD&E Study. Attended the Public Meeting and BCC
Public Hearing on June 2, 2015. | Project Ongoing
Ø Completed the design and procurement of the Martin Luther King Jr. Blvd. / Green Acres Road resurfacing
contract ($2,000,000). | In Progress
Ø Procured, managed and inspected the contractual work for repairs to three roadways from the April 2014
floods: Jail Parking Lot, Oakhill Road, Sexton Road (FEMA). | In Progress
Ø Completed the design for a stormwater retrofit project in the Gap Creek basin. Amended the original 319
Grant Agreement with FDEP to reduce scope. Includes approximately $200,000 for construction costs.
Ø Constructed stormwater improvements for the Overbrook and Tanglewood Stormwater Ponds via MOEX
settlement grant from FDEP ($400,000).
Ø Submitted Transportation Alternative Program (TAP) grant applications for 5 new sidewalk projects.
Ø Submitted information for the widening and resurfacing of CR 2 to OWTPO for FDOT Rural Work
Program funding consideration.
Ø Procured two new five-year continuing services contracts for design and CEI services for LAP funded
projects.
Ø Worked with other County Departments (Administration, HR, etc.) in developing a countywide, federal
Title VI Policy.
Ø Processed 4 vacation of right-of-way requests; obtained and executed 11 easements/deeds from private
property owners to accommodate construction projects; performed various surveys for design, construction
or inspection purposes, plus survey work related to code enforcement issues, driveway construction,
easement location, FDEP compliance and NPDES data collection.
Ø Continued coordination and communication associated with the right-of-way acquisition for the Okaloosa
Lane and Fairchild Road dirt-to-pave projects.
Ø Provided engineering input on miscellaneous tasks performed by County staff.
Ø Attended applicable Board of County Commissioners, Transportation Planning Organization, Regional
Transportation Planning Organization, Eglin Noise Committee, Planning Commission, Comprehensive
Planning Committee, etc. meetings.
Ø Managed the Capital Improvement Project budget along with the Road Division.
PROGRAM GOAL: The Engineering division’s mission is to provide safe infrastructure and quality of life
related services to the residents and visitors of Okaloosa County. The division accomplishes this mission
through its four sections: Drafting and Design, Land Development Review, Right-of-Way, and Survey.
KEY OBJECTIVES:
1. Provide engineering services that enhance or maintain the health, safety and welfare of the general public.
2. Provide timely and courteous assistance to citizens.
3. Ensure that all projects are designed and constructed within established budgetary constraints, comply with
acceptable industry standards, and are performed in compliance with County policies and procedures.
4. Provide surveying services for design, construction, and enforcement purposes.
5. Acquire the necessary rights-of-way, easements, deeds, and agreements to construct and maintain County
infrastructure.
6. Provide recommendations to the Board of County Commissioners related to the operation and maintenance
of infrastructure owned by the County.
7. Maintain a database of record drawings for projects constructed, repaired or maintained by County forces.
8. Projects for FY 2016
• PJ Adams Parkway TRIP | Project Administration for the Design and Right-of-way Acquisition of
Segments 1-4.
• Foy Shaw Parkway PD&E | Preliminary Engineering & Document Review
• Rocky Bayou Drive Sidewalk Design | Administration of FDOT LAP Agreement
• Crestview Sidewalks Addition (3 Locations) | Administration of FDOT LAP Agreement
• PJ Adams Safety Striping and Signing | Administration of FDOT LAP Agreement
• Gap Creek Stormwater Improvements (319 Grant) | Construction Administration
• Shalimar Gateway Landscaping JPA | Project Management, Utility Coordination, Construction Admin.
• Fairchild Road Dirt to Pave | Right-of-Way Acquisition & Construction Administration
• Okaloosa Lane Dirt to Pave | Right-of-Way Acquisition & Construction Administration
• Martin Luther King Jr. Blvd. / Green Acres Road Resurfacing | Construction Administration
• Assist with dirt to pave conversion projects. | Design and Inspections
• Project Administration (Design and Construction) of any approved sidewalk TAP grants.
9. Verify that all submitted designs (both those intended for public dedication and private ownership/
maintenance) meet or exceed the minimum standards set forth in the Land Development Code to protect the
health, safety and welfare of the general public.
10. Coordinate public and private proposed improvements (across county and municipal jurisdictions) for
compatibility.
11. Inspect improvements to verify that they are constructed in accordance with the approved development
documents prior to making a recommendation to the Board of County Commissioners for acceptance of
maintenance responsibility.
12. Maintain open communication with project applicants from the pre-application meeting through
development approval.
13. Provide an efficient development review process.
14. Monitor stormwater and transportation concurrency in accordance with the Land Development Code and
Comprehensive Plan.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY13/14 FY14/15 FY15/16
Number of full-time employees 11 11 *26
Input Total Division Budget Request $1,064,367 $1,069,828 *$1,833,620
Grants acquired 6 3 4
Construction contracts finalized 3 2 3
Output
Project designs completed by staff 3 2 2
Project designs completed by consultants and administered
10 12 10
by staff
Efficiency
Average time (days) to process payment requests 10 15 10
Percentage of projects completed under budget 100 100 95
Effectivenes
Ratio of Grant dollars to County match dollars spent on
1.5:1 1.5:1 1.5:1
design/construction projects
s
• Includes Salaries, Benefits and Operating Expenses for:
Engineering Staff (5) | Survey Staff (5) | Development Review Staff including Inspectors (4)
• Included Salaries and Benefits only for:
Public Works Director (1) | Road Division Management Staff (2) | Administrative Staff (5) | Supply Staff (4)
• Includes 2 New Positions:
Program Technician II (Administrative)
Supply Specialist (Supply)
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: LAND DEVELOPMENT REVIEW AND PERMITTING
PROGRAM DESCRIPTION: The Review, Testing, and Inspection section of the Engineering Division in the
Public Works Department provides engineering review to ensure that all infrastructure improvements intended
for use by the public meet the standards of the Land Development Code and protect the health, safety, and
welfare of the general public.
REVENUE: The Review, Testing, and Inspection section is funded within the County Transportation Trust
Fund (CTTF). Supporting revenue of the County Transportation Trust Fund is fuel taxes, local government
half-cent sales tax, charges for services, interest, other miscellaneous revenue and transfers from other funds.
MAJOR ACCOMPLISHMENTS LAST YEAR:
Ø Received and reviewed development plans for 102 projects.
Ø Attended 26 pre-application meetings with Developers and Engineers.
Ø Reviewed and inspected 119 driveway permit applications.
Ø Received and inspected 22 "below the crown" exemption requests.
Ø Performed 188 periodic inspections for developments.
Ø Performed 401 NPDES inspections.
Ø Performed 35 bridge inspections/report filings.
Ø Performed final plat review and approval for 4 plats.
Ø Processed 12 FEMA-LOMR applications.
Ø Conducted roadway material density tests for the Road Division as required for roadway and stormwater
construction projects.
PROGRAM GOAL: The Land Development Review and Permitting section’s mission is to ensure that
infrastructure proposed and constructed for citizen use is compliant with minimum technical standards and
promotes the health, safety and welfare of the general public.
KEY OBJECTIVES:
1. Verify that all submitted designs (both those intended for public dedication and private
ownership/maintenance) meet or exceed the minimum standards set forth in the Land Development Code to
protect the health, safety and welfare of the general public.
2. Coordinate public and private proposed improvements (across county and municipal jurisdictions) for
compatibility.
3. Inspect improvements to verify that they are constructed in accordance with the approved development
documents prior to making a recommendation to the Board of County Commissioners for acceptance of
maintenance responsibility.
4. Maintain open communication with project applicants from the pre-application meeting through
development approval.
5. Provide an efficient development review process.
6. Monitor stormwater and transportation concurrency in accordance with the Land Development Code and
Comprehensive Plan.
PERFORMANCE MEASURES:
Actual Estimated Adopted
