2014 Fiber Network Overview from the Okaloosa County BOCC meeting of March 18, 2014 (IQM2 meeting #1193). Original portal label: 2014 Fiber Network Overview. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- 2014 Fiber Network Overview
- Date
- March 18, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
2014 Fiber Network Overview (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 3.1 MB
Download ↓Machine-extracted text — 136-2014 Fiber Network Overview.pdf
Text extracted on 2026-10-31 from 136-2014 Fiber Network Overview.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 13.7 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
• WHY:
• Why did the County create the Fiber Optic Network?
• WHAT:
• What are the strategic components of the Fiber Optic Network?
• HOW:
• How does the County continue to leverage, maintain and sustain the Fiber Optic
Network and continue to benefit from it?
WHY?
• Cost of County’s Telephone and Data communication had been dramatically
increasing over the past years, yet failed to meet the demand for increased
bandwidth to allow enterprise implementation of Data Center solutions.
• In addition to the County’s own departments, there is a statutory and
constitutional requirement to pay for communication costs of the Court
related entities.
• The County’s FIBER OPTIC NETWORK was a strategic investment
implemented to save money, increase level of service and meet future
needs. Information Systems Succeeded!
Why: More Bandwidth was needed!
1 Gbps is over 664 Times
the Bandwidth of a T-1
Connection
T-1
10 Mbs (1.5 4 Mbps)
100 Mbps
Fiber
Connection
(1 Gbps)
Why: To Save Money for data and phone services
Approximate Annual Savings (Phone Services):
Number of active VOIP phones ~ 1151
Average annual voice savings per phone ~ $173.71
Approx annual Clerk of Court savings ~ $97,891
Total Annual Voice Savings ~ $297,835 (+ $54,000 by Sheriff’s recent joining)
Approximate Annual Savings (Data Services):
Number of active data sites ~ 120
Average annual data savings per site ~ $6,250
Total Annual Data Savings ~ $750,000
Total Approximate Telecommunication Services Annual Savings:
$1,101,835 (less O&M)
What are the strategic components of the Fiber
Optic Network?
• A County owned/operated utility consisting of the
following items:
• Fiber Optic Cable/Conduit located along
public/private right-of-ways and easements
• Pull Boxes and Splice Boxes for storing fiber slack and
splice enclosures
• Switches, routing equipment and lasers to pump data
around the various fibers
• Backup power and equipment to ensure constant
availability
What are the strategic components of the Fiber
Optic Network?
The North and South Head End Facilities aggregate voice and data traffic and beam
it north or south across the backbone fiber to the intended destination. All County
fiber networks initiate/terminate in at least one of the head end facilities.
Crestview
NHE
FWB Ring SHE Mid-Bay Ring
How does the County continue to leverage, maintain
and sustain the Fiber Optic Network and continue to
benefit from it?
BY SUSTAINING and MAINTAINING THE FIBER OPTIC UTILITY NETWORK
Perform UTILITY LOCATES required to help prevent damage to cables
Maintain highly accurate NETWORK MAPS
Maintain highly accurate SPLICE DIAGRAMS
Perform UTILITY RELOCATIONS as required by FDOT, Eglin AFB or others.
REPAIR damaged fiber optic cable, conduit and pull boxes
MAINTAIN HEAD ENDS including buildings, cooling systems and backup generators
ASSIGN 24/7 SUPPORT PERSONNEL to handle maintenance calls at any time
ADDITIONAL FIELD OPERATIONS PERSONNEL to review plans, perform CEI, and
other important OSP duties.
ASSIGN 24/7 NETWORK ADMINISTRATOR to solve network issues at any time
How does the County continue to leverage, maintain and
sustain the Fiber Optic Network and continue to benefit
from it?
Perform UTILITY LOCATES required to help prevent damage to cables
Okaloosa County GIS is approaching 5000 utility locates per year…with
2 County employees.
According to the Common Ground Alliance, there were approximately 165,000
reported incidents of underground utility damage in the US during 2010.
How does the County continue to leverage, maintain and
sustain the Fiber Optic Network and continue to benefit
from it?
Maintain highly accurate NETWORK MAPS to facilitate:
Facilitates accurate and timely utility locates
Saves critical time in network re-routing if required due to outages
Simplified planning for new fiber laterals when required
Assists in plans review and design
How does the County continue to leverage, maintain
and sustain the Fiber Optic Network and continue to
benefit from it?
Maintain highly accurate SPLICE DIAGRAMS to facilitate:
Simplified planning of future network modifications
Fast and efficient rerouting during network problems
Accurate documentation of existing network routes
How does the County continue to leverage, maintain
and sustain the Fiber Optic Network and continue to
benefit from it?
Perform UTILITY RELOCATIONS as required by FDOT, Eglin AFB or others.
Recently required utility relocations:
FDOTs Hwy 85 construction at Airport ~ $100,000 (mostly reimbursed)
FDOTs Hwy 85/SR123 Flyover ~ $5,000
FDOTs Cinco Bayou & Shalimar Bridge relocations ~ $2,500
Known upcoming required utility relocations (to name a few):
FDOTs Gap Creek Bridge relocation ~ $10,000
FHWAs Duke Field – 7th SFG Overpass relocation ~ $18,500
How does the County continue to leverage, maintain
and sustain the Fiber Optic Network and continue to
benefit from it?
REPAIR damaged fiber optic cable, conduit and pull boxes
Recent required repairs include
Eglin Pkwy fiber cut near Kmart
Line was accurately marked but was cut by boring contractor
Cost to repair was $38,000
Hwy 85 backbone fiber cut
Cost to repair was $15,000
Hwy 123 Fiber Pinch (Cost to repair will be ~ $20,000)
How does the County continue to leverage, maintain
and sustain the Fiber Optic Network and continue to
benefit from it?
MAINTAIN HEAD ENDS infrastructure to ensure 24/7 operations
Maintain cooling systems to safeguard equipment
Maintain backup power supplies and generators
Maintain specialized fire suppression equipment
Operate and maintain security systems for County and Partner personnel
How does the County continue to leverage, maintain
and sustain the Fiber Optic Network and continue to
benefit from it?
View the Fiber Optic Network as a critical County Telecommunication Utility and
prioritize accordingly. Virtually all County communications is dependant on this
utility.
NEED 24/7 SUPPORT PERSONNEL to handle maintenance calls at any time
NEED 24/7 NETWORK ADMINISTRATOR to solve network issues at any time
NEED to create a GIS centric fiber optic asset management system to map, plan,
design and manage the county fiber optic network
FIBER OPTIC NETWORK
HOW HAS THIS INVESTMENT BENEFITED THE COUNTY?
SIGNIFICANT COST SAVINGS on reoccurring data and communication charges
DRAMATICALLY INCREASED BANDWIDTH at a much lower cost
BROUGHT ON CONSTITUTIONAL OFFICERS and others to help reduce BCC costs
BROUGHT ON PARTNERS to help offset the infrastructure and maintenance costs
ROOM TO EXPAND by utilizing additional fiber available on existing routes
FIBER OPTIC NETWORK
HOW HAS THIS INVESTMENT BENEFITED THE COUNTY?
BROUGHT ON CONSTITUTIONAL OFFICERS and others to help reduce BCC costs
Clerk of Court
Property Appraiser
Sheriff
Supervisor of Elections
Tax Collector
Also brought on board the following entities
Judiciary
Library Cooperative
Public Defender
State Attorney
OCWS SCADA System
FIBER OPTIC NETWORK
HOW HAS THIS INVESTMENT BENEFITED THE COUNTY?
BROUGHT ON PARTNERS to help offset the infrastructure and maintenance costs
POTENTIAL PARTNER
POTENTIAL PARTNER
OCSD’s Bandwidth Needs Increasing
The State Educational Technology Directors Association (SETDA)
has released bandwidth recommendations in their publication
“The Broadband Imperative: Recommendations to Address K-
12 Education Infrastructure Needs”
• Recommended minimum EXTERNAL internet connection to the
Internet service provider (ISP) for enhanced K-12 teaching, learning,
and improved school operations are as follows:
• 100 Mbps per 1,000 students/staff by 2014-2015
• 1 Gbps per 1,000 students/staff by 2017-2018
POTENTIAL PARTNER
OCSD’s Bandwidth Needs Increasing
The State Educational Technology Directors Association (SETDA)
has released bandwidth recommendations in their publication
“The Broadband Imperative: Recommendations to Address K-
12 Education Infrastructure Needs”
• Recommended minimum INTERNAL wide area network (WAN)
connections from the district to each school and among schools
within each district for enhanced K-12 teaching, learning, and
improved school operations are as follows:
• 1 Gbps per 1,000 students/staff by 2014-2015
• 10 Gbps per 1,000 students/staff by 2017-2018
POTENTIAL PARTNER
PRELIMINARY Estimated Costs to Bring ALL Schools online:
• Invest in Existing Fiber Infrastructure = $1.15 Million
• New Construction Costs = $2.62 Million
• Annual O&M Fee = $78,000
CURRENT FIBER OPTIC RELATED PROJECTS
7SFG Fiber Acceptance Testing and reroute after 288 FOC install at Gen Bond.
2113 Lewis Turner telecom build out for ACC CSS 53/TA Eglin AFB
Sheriff VOIP
Admin Ring Out
Various splice locations
Sheriff telecom buildout to substation at 313 Love Joy Rd
Pagenet Relocation from Annex
GAL: Jud Network to old Hospital from Annex
Traffic Ops move from Annex to SHE and South Yard
Gen Bond 2.5 mile conduit, box and fiber R/R + splicing and acceptance testing to
Military (7SFG)
123 pinch fiber replacement, conduit proof, new boxes, etc
Okaloosa Ln CSX dir bore under railroad
SCADA: Okaloosa Ln conduit/fiber install to Del Cerro and other SCADA locations in
the area.
CURRENT FIBER OPTIC RELATED PROJECTS (Continued)
PJ Adams widening, plans review, telecom system relocation and new traffic signal.
SCADA: PJ Adams to Wildhorse Dr SCADA water tank
SCADA: Old Bethel Rd/ SCADA water tank build out
FDOT: Gap Creek Bridge conduit and fiber relocation
Fiber splicing temp re-route
SCADA: Duke Field SCADA
Hurlburt Overpass – conduit relocation and new buildout
SCADA: West County water tank build out
FDOT: Hwy 98 Main St to Commons widening and relocation
Crestview Jail – fiber troubleshooting for ring out.
Elder Services telecom buildout:
FWB
Crestview
Niceville
CURRENT FIBER OPTIC RELATED PROJECTS (Continued)
OCT Crestview Telecom build out
Sheriff – telecom build out to gun range on hwy 90 – possible funding issue too
SCADA: Emerald Breeze SCADA build out
Duke area backbone/fiber ring out
New traffic signal MLK/fam camp near super elevation
SCADA: Eglin Main SCADA build out
SCADA: Planning for LS north of Shalimar/12th St
SCADA: BWB water tank fiber relocation due to sand blasting and painting
FDOT: 428208-1-52-01 SR85 RT Aux Ln from 12th Av to N of Joe Martin Cir 30% plans
Fiber to Wright landfill
Wright landfill – Eglin fiber cut.
MBB Camera
N SR 123 widening and overpass – utility relocation
CURRENT FIBER OPTIC RELATED PROJECTS (Continued)
Hwy 20 Roberts Rd to Walton county line - repaving and various driveway mods –
fiber relocation
RTK GPS and add to asset management system: new Duke Field SCADA project
Relocate Crestview PSAP from Old Bethel Rd to Crestview Police station on Stillwell
Blvd.
New Traffic signal at Stillwell Blvd.
SCADA: Okaloosa Ln Well
Concrete collar project for underground pull boxes
SCADA: Additional 20+ SCADA projects in various levels of planning, design or
construction.
Historical County Communication Expenditures
$1,000,000 $971,136
$900,000 $881,592
$800,000
$741,973 $737,914
$701,382
$700,000 $667,681
$600,000
$538,730
$500,000 $483,971
$414,997
$400,000
$300,000
2003 2004 2005 2006 2007 2008 2009 2010 2011
FIBER NETWORK
IMPLEMENTATION
FIBER OPTIC NETWORK
HOW HAS THIS INVESTMENT BENEFITED THE COUNTY?
ROOM TO EXPAND by utilizing additional fiber available on existing routes
REPRESENTATIVE FIBER
OPTIC CABLE FIBER
UTILIZATION
Buffer Tube Containing 12
Individual Fibers
Fiber Available for Expansion
Fiber In Use
Combined BCC & IS Communication Expenditures
$969,132.00
$412,985.00
2003 2011
Currently Realizing Savings of OVER $550,000
PER YEAR Compared to 2003 Spending!