READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — 2013 meeting #1144 (date undetermined) — 3-8 Capital Improvement — reading text
Part 6 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 24-3-8 Capital Improvement.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
B 50' X 250'
FY15 301 1,100,000 Sheriff's Admin Compound - Addition B Construct and finish 15,000 engineered building
FY15 301 11,400,000 Shalimar Annex B Complete Renovation per approved plans
FY15 301 250,000 Shalimar Annex B Finish out interior office spaces
FY15 301 900,000 old FWB Hospital - Renovation B To create usuable space for county needs
FY15 301 150,000 Sustainable Okaloosa Committee I Sustainable Upgrades
FY15 301 8,500 PW - Traffic B Carport for Bucket Truck with shed
FY15 301 13,000 Brackin Building - Roof B Materials to Recoat Roof
FY16 301 31,000 Front Entrance gate E Replacement
FY16 301 100,000 Re-surface jail parking lot I Seal coating applied on FY03. Seal coating or re-surfacing needed again
FY17 301 40,000 Retrofit Corridor & Vestibule Doors (21) E Replace obsolete equipment (c.1992) Sliding doors
FY17 301 36,000 Dumb Waiter E Replace antiquated dumb waiter at jail
FY17 301 28,000 Sally port gates (2) E Replacements in bus sallyport
FY18 301 40,000 Retrofit Corridor & Vestibule Doors (21) E Replace obsolete equipment (c.1992) Sliding doors
FY18 301 60,000 Generator E Replacment for original 1992 diesel generator
Page 4-33
Okaloosa County
Capital Improvement Program
Fiscal Years 2014-2018
ROAD & BRIDGE CONSTRUCTION
FY Fund Amount Project Name Cat Narrative
FY14 302 975,000 PJ Adams I Building cash match for TRIP Grant - Total needed $2.2M by FY14 CGT
FY14 302 450,000 Green Acres Road I Reclaim, repair base & resurface. CGT
FY14 302 900,000 Martin Luther King Blvd I Reclaim, repair base & resurface CGT (Total project cost $2.2M)
FY14 302 500,000 Fairchild Road (North) I Pave from Airport Road to asphalt. CGT (Total project cost $2.25M)
FY14 302 500,000 Okaloosa Lane I Pave from Aplin Road to Serenity Lane. (Total project cost $2M) CGT
FY14 302 175,000 Davis Road I Pave road under Dusty Roads Exemption. LOGT
FY14 302 600,000 Mount Olive Road I Mill & resurface roadway. LOGT
FY14 302 250,000 Old Ebeneezer Road I Resurface existing cold mix - LOGT
FY14 302 200,000 Bridge Conversion/Replacement I Annual timber bridge conversion and bridge replacement. LOGT
FY14 302 250,000 Foxwood Phase III I Drainage reconstruction and resurfacing LOGT
FY14 302 200,000 Open Graded Cold Mix Restoration I Stabilize open graded cold mix roads with various treatments. LOGT
FY14 302 110,000 Boom Axe E Replace
FY14 302 195,000 Loader 170 HP 3YD E Replace
FY14 302 225,000 Loader 205 HP 4.75 YD E Replace
FY14 302 40,000 Tractor 73 PTO HP E Replace
FY14 302 15,000 Batwing Mower 15` PTO E Replace
FY14 302 75,000 Flatbed Dump W/Crew Cab E Replace
FY14 302 98,000 Dump Truck E Replace
FY14 302 98,000 Dump Truck E Replace
FY14 302 75,000 Flatbed Dump W/Crew Cab E Replace
FY14 302 600,000 Hydraulic Crane E Replace
FY14 302 100,000 District One Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY14 302 100,000 District Two Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY14 302 100,000 District Three Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY14 302 100,000 District Four Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY14 302 100,000 District Five Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY15 302 100,000 District One Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY15 302 100,000 District Two Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY15 302 100,000 District Three Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY15 302 100,000 District Four Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY15 302 100,000 District Five Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
Page 4-34
Okaloosa County
Capital Improvement Program
Fiscal Years 2014-2018
ROAD & BRIDGE CONSTRUCTION
FY Fund Amount Project Name Cat Narrative
FY15 302 200,000 Bridge Conversion/Replacement I Annual timber bridge conversion and bridge replacement. LOGT
FY15 302 1,200,000 Martin Luther King Blvd I Reclaim, repair base & resurface CGT (Total project cost $2.2M)
FY15 302 750,000 Fairchild Road (North) I Pave from Airport Road to asphalt. CGT (Total project cost $2.25M)
FY15 302 100,000 Materials - Millings I Stabilize dirt roads with millings. LOGT
FY15 302 200,000 Open Graded Cold Mix Restoration I Stabilize open graded cold mix roads with various treatments. LOGT
FY15 302 200,000 Roadway Striping I Apply/re-apply pavement markings. LOGT
FY15 302 100,000 Stormwater Pipe Lining I Annual pipe lining for failing roadway drainage pipes. LOGT
FY15 302 128,000 Grader Leases E Road Grader Leases - LOGT
FY15 302 74,000 Sign Materials I LOGT
FY15 302 400,000 Road Maintenance I LOGT
FY15 302 500,000 Green Acres Road I Reclaim, repair base & resurface LOGT
FY15 302 100,000 Dairy Road I Dirt To Pave / Stormwater Basin LOGT
FY15 302 100,000 Hare Street I Dirt to Pave - LOGT
FY15 302 105,000 Taylor Road I Dirt to Pave - LOGT
FY16 302 100,000 District One Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY16 302 100,000 District Two Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY16 302 100,000 District Three Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY16 302 100,000 District Four Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY16 302 100,000 District Five Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY16 302 200,000 Bridge Conversion/Replacement I Annual timber bridge conversion and bridge replacement. LOGT
FY16 302 100,000 Materials - Millings I Stabilize dirt roads with millings. LOGT
FY16 302 200,000 Open Graded Cold Mix Restoration I Stabilize open graded cold mix roads with various treatments. LOGT
FY16 302 200,000 Roadway Striping I Apply/re-apply pavement markings. LOGT
FY16 302 100,000 Stormwater Pipe Lining I Annual pipe lining for failing roadway drainage pipes. LOGT
FY16 302 128,000 Grader Leases E Road Grader Leases - LOGT
FY16 302 74,000 Sign Materials I LOGT
FY16 302 400,000 Road Maintenance I LOGT
FY16 302 400,000 Red Barrow Road - Bridge I Bridge Replacement LOGT
FY16 302 300,000 PJ Adams I Mill & resurface from Wild Horse to I-10 LOGT
Page 4-35
Okaloosa County
Capital Improvement Program
Fiscal Years 2014-2018
ROAD & BRIDGE CONSTRUCTION
FY Fund Amount Project Name Cat Narrative
FY17 302 100,000 District One Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY17 302 100,000 District Two Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY17 302 100,000 District Three Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY17 302 100,000 District Four Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY17 302 100,000 District Five Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY17 302 200,000 Bridge Conversion/Replacement I Annual timber bridge conversion and bridge replacement. LOGT
FY17 302 100,000 Materials - Millings I Stabilize dirt roads with millings. LOGT
FY17 302 200,000 Open Graded Cold Mix Restoration I Stabilize open graded cold mix roads with various treatments. LOGT
FY17 302 200,000 Roadway Striping I Apply/re-apply pavement markings. CGT
FY17 302 100,000 Stormwater Pipe Lining I Annual pipe lining for failing roadway drainage pipes. CGT
FY17 302 128,000 Grader Leases E Road Grader Leases - LOGT
FY17 302 74,000 Sign Materials I LOGT
FY17 302 400,000 Road Maintenance I LOGT
FY17 302 325,000 Helms Farm Road I Stormwater Improvements and Road Stabilization - LOGT
FY17 302 300,000 Senterfitt Road Bridge I Bridge Replacement LOGT
FY18 302 100,000 District One Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY18 302 100,000 District Two Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY18 302 100,000 District Three Overlay I Annual Allocation. Pavement Preservation Fund (302-3204)
FY18 302