READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 11-14-2006(workshop) — reading text
Part 16 of 42. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13251-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
with Gercak, McDonald,
Scott, Wayne, and Wilson in favor (Fiasco and Glover absent).
CONDITIONAL USE PERMIT - MARINA
Consideration of a request for a conditional use permit for a marina. The request is located at 38
Miracle Strip Parkway SW. Requested by Brian J. Lambert, AlA, agent for Santa Rosa Sound
Complex, LLC, owner.
The City Attorney gave the oath to all individuals who expected to speak on the issues.
Mr. Mitchell went over the staff recommended conditions of a Development Order. He reported
staff recommended approval of the conditional use permit and the issuance of a Development
Order with the conditions specified. He submitted the staff report for the record. The applicant had
no objection.
Brian Lambert, agent for the owner, stated there was no objection to the conditions of the
Development Order.
Glenda Glover arrived at 5: 05 p. m.
The City Attorney gave the oath to Jim Tucker, 590 L' Ombre Court, NE.
Mr. Tucker questioned the reason for the restriction on the use of the property within 50' of the
water. He expressed that it seems a little like taking all that square footage of away from
property
him and that if it is going to be removed as a place where he can perform his normal business, then
the tax assessor should not tax him for that piece of property that he cannot use. He commented
on the unfaimess of taking people' s property and from his
perspective if he cannot use it that is the
same as taking it. He expressed if he cannot use that property for his business. then he should not
be taxed on it and questioned the laws that can take property without just compensation.
Regular MPB meetina 1 0- 5- 06
CONDITIONAL USE PERMIT - MARINA
The City Attorney gave the oath to Emil Pagliari, owner of the marina next door at the Crab Shack.
Mr. Pagliari explained they are very particular to follow the requirements in place that must be
followed in place in the event of a spill, and the protection devices required for the transfer of gas.
He expressed his support of Mr. Tucker and the request for a conditional use permit.
The CDS Director further explained the conservation element under the Comprehensive Plan states
that the City shall continue to provide specific criteria and performance standards which
prioritize
shoreline uses giving water dependent uses first priority. She went over the permitted uses and
noted what is permitted is very limited. She said limiting boat repair is not inconsistent and is in
compliance with what is allowed elsewhere in the Shoreline Zone. It was commented there are a
number of other locations with boats within 50' of the shoreline, and it was questioned whether
there could be a restriction for the use of the SO' to allow boats to be stored. The CDS Director
explained those locations are non- conforming uses, but this situation is a new use which needs to
be brought into conformance with the current code and the Comprehensive Plan, and it would not
be allowed.
The City Attorney advised the Board is looking at a Conditional Use Application, which is
very
particular and slightJy outside the zoning categories and uses that are usually permitted in the area.
She said to keep in mind that it has to have particular conditions on it to make it suitable and
compatible with the other uses in the area.
The Chairman opened the public hearing. As there was no one who wished to
speak, the public
hearing was closed.
Ms. Wilson moved to approve the request and issue a Development Order with the
conditions specified. Mr. Scott seconded motion.
The City Attorney was asked if the Board could add a condition to allow vessels to be stored within
the SO' so that waste is not drained in the area.
The City Attorney responded the Board approved a Conditional Use a few months
ago for property
not far from it for Sunrise with the same condition. She noted the condition states that "nor
may any
boatyard operation be conducted in the designated SPZ" and they could work on the definition of
boatyard but it would take some time to determine what is a major or minor operation. She said the
regulation is from the State and the Code states it is to protect 1 DO' but it would be no less than 50'
and that is a discretionary measure of staff.
Mr. Mitchell further explained that was one of the issues in the 1990 Plan that was considered
deficient in the Comprehensive Plan when it was first drafted and remedial
changes were needed to
include language for shoreline protection in order to be found consistent with Florida Statutes.
The Chairman called for the vote on the motion and it carried
unanimously with Gercak,
Glover, McDonald, Scott,Wayne, and Wilson in favor (Fiasco absent).
CONDITIONAL USE - AUTOMOTIVE REPAIR AND SERVICE
Consideration of a request for a Conditional Use Permit for automotive repair and service. The
request is located at 12 Chicago SE. Requested by Dawnn Spurr, agent for Absolute Installation,
Inc., owner.
Mr. Mitchell reported the applicant requests a continuance on their request for Conditional Use.
Staff would like to request continuance of the request to the November
meeting.
Marina Siting Page 1 of2
Home I Staff I Statutes and Rules I DR! Procedures I Camp Plan Procedures I ORCINOl Reports On-
Marina Siting
What is marina siting?
Nith the passage of Chapter 2002- 296, Laws of Florida, the Legislature added Section 380. 06(24)( k), F .S., the
for allowing an exemption of marinas from the DRJ review process. The law provides that marinas
process
from DRI review ifthe local government has adopted a boating facility siting plan or policy within its compreher
Department of Community Affairs, with assistance from the Department of Environmental Protection (DEP) c
Fish and \ NUdlife Conservation Commission ( has a best practices guide PreparinQ a Bo
FWC), prepared
Sitina Plan: Best Manaaement Practices for Marina Sitina Guide. to assist local governments in devE
facility siting plans.
The legislation recognizes that the boating facility siting process has certain advantages over the DRI process.
it do
program provides an effective process for evaluating and mitigating the impacts of a proposed marina,
locational guidance to ensure the site is appropriate and can be pemitted according to local and state laws.
Boating Facility Siting Plan, local governments can encourage marina development at appropriate locatio!
planning process, whHe directing marinas away from sites that would adversely impact important resources.
The legislation directed the Department to develop guidelines, including model plans, policies and criteria
governments with development of their siting plans. In preparing the boating facility guide, the Department
interagency work group consisting of DEP and FWC and obtained Input from stakeholders through an info
attended by representatives of local governments, state agencies, environmental groups and the marina indust
The guide reviews procedures for incorporating the boating facility siting plan into the comprehensive plan
siting criteria including criteria for manatee protection, and suggests best practices for developing a siting p
also provides model plans including a review of the seven Manatee Protection Plans approved by the FWC, a
overview of GIS applications and available data sets that can be used in conducting suitability analyses.
Siting marinas can be challenging due to competing objectives that must be reconciled. Local government
siting plans provide a framework for analyzing conditions within the community to identify locations that can
boating interests while protecting manatees, seagrass beds and other marine resources. An important objectr
was to develop a guide that would ensure effective coordination between the site planning process and
process. The siting process provides certain advantages for the local govemment and stakeholders in the proc1
Improves PredictabHity~ By defining appropriate locations for marinas, local govemments. can improve the I
the permitting process. This will reduce pemitting costs and ensure stakeholders have input in the siting proce:
Saves Tune~ The DRI review process can be lengthy. Through appropriate siting, the need for special ·
mitigation can be reduced, resuiting in a shorter, streamlined permitting process.
Avoids Duplication: The DRJ review of marinas generally focuses on permit-ing standards and mitigation rec
often duplicate the stateaE1Ms permitting programs. The siting plan is a value-added process that can com
than dupUcate permitting programs.
Considers Community Needs~ The permitting process occurs on a case- by-case, ap licant-driven basis
consider the long- term needs of the community. The siting plan provides process
a to comprehensively evalua
future demands for marinas so that user needs may be met, while minimizing unnecessary impacts on the envi
Improves Monitoring~ The siting plan provides a process for identifying the factors that impact natural reSOL
This process provides a basis for monitoring the impacts of marinas over time and making adjustments. to
impacts are minimized.
The ~~! de is ~ useful. sites. !n . ar~as. w~ .
wh~ther plan~ ing fo~_.,:"" arin!. arine resou~ce~
tool.. . signifi?B~ ~
http:// www.dca.state. fl.uslfdcp/ dcp/ marinasitinglindex. cfm 10/24/ 2006
Marina Siting Page 2 of2
d
populations or in areas involving less complex conditions. The guide is designed to assist local governments,
Citizens also the guide to better understand the siting process and how to n
community organizations. can use
participate in the weal government planning process.
Examples of Marina Siting Plans:
Collier County
Dade County
Duval County
Indian River County
Martin County, Part 1, Part 2
