Preserved among the July 11, 2017 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1421). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used July 1, 2017; the meeting date was corrected using the agenda/minutes heading and matching source filename.
Original publication
Workshop 5-30-2017
Date
July 11, 2017
Publisher
Okaloosa County Board of County Commissioners
Where to find it
3
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)
Source date and document identity checked for this intake. Machine text has not received independent human proofreading.
HOW FAR THIS HAS BEEN CHECKED
File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
Workshop 5-30-2017 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
May 30 , 2017
Workshop
A workshop of the Okaloosa County Board of County Commissioners
was called to order at 1: 30 p . m. at the County Administration
Building in Shalimar . Members present were Carolyn N. Ketchel ,
Chairman; Graham Fountain, Vice Chairman ; Nathan Boyles ; Trey
Goodwin; and Charles K. Windes, Jr. Also present were Gary
Stanford , Director of BCC Services ; John Hofstad , County
Administrator; Gregory Stewart, County Attorney; and members of
the media .
Mrs. Ketchel stated that due to a scheduling conflict for several
members of the Board the workshop for June 27 , 2017 has been
rescheduled for June 21 , 2017 at 1 : 30p . m. at the County
Administration Building in Shalimar .
STORMWATER MANAGEMENT
Mr . Jason Autrey , Public Works Director, presented a slide show
and gave an overview of projected stormwater projects for Okaloosa
County . He stated the Stormwater Division of Public Works provides
stewardship of the Okaloosa County stormwater assets and
compliance with applicable regulatory obligations as required by
the National Pollutant Discharge Elimination System (NPDES).
He added that the Stormwater Division conducts regular point
inspections because they want to stay ahead of the curve and remain
in good standing in regards to regulation . He then introduced
Scott Henson to provide detail on the Municipal Separate Storm
Sewer System (MS4) compliance.
Mr. Henson stated there are 3 components to the MS4 (included in
the slide presentation)
• MS4 Compliance
• Stormwater Infrastructure Maintenance
• Stormwater Construction
He gave a brief overview of the components and stated the NPDES
MS4 process requires compliance with NPDES Generic Permit for
Discharge of Stormwater, and Okaloosa County submits their permits
annually.
May 30 , 2017 -1- Minute Book 76, Page 404
Okaloosa County Board of County Commissioners
Mr. Henson also gave a comparison between southend and northend
needs for the County . The southend piping is deteriorating and
needs a lot of maintenance , where the northend is very rural and
stormwater issues come in swales . The cost for the current project
list totals $7 million .
Mr . Scott Bitterman with Public Works provided a description of
three projects needing attention.
The first project is the Golf Links Project off Lewis Turner
Boulevard. There are multiple buildings and the foundation of one
had been washed out to the point everyone had to be removed and
the building reconstructed as it was in danger of sliding into the
water. Cost of correcting this issue is a p proximately $250 , 000 .
Mr . Hofstad provided some additional information in regards to the
Golf Links Project, in that it involves three jurisdictions. The
stormwater issue begins in FDOT' s jurisdiction , the Golf Links
property is within the City limits of Ft . Walton Beach , and the
end-point for the stormwater is in the unincorporated area of the
County .
The second project is the Baker Recreation Center . There are
currently two ponds in this location however they are not adequate
in size to handle the run off . After giving an overview , he
advised the cost of this project would be approximately $450 , 000 .
The third project is the Meigs Drive Stormwater Improvement . This
project would cost approximately $650,000 and is an ongoing issue ,
to the extent they leave the "Road Closed" signs off to the side
at this location because of the frequent need to be displayed . The
pipes most recently used in this location are metal a nd will
deteriorate over time , a more permanent solution is needed .
Mr. Jason Autrey then discussed budget . These three projects total
$1 . 6 million including other fees, such as cost of engineers . The
County has an on - going obligation of $1 . 2 million a year just to
maintain current systems . In-coming revenue per year for
stormwater is $1
Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.
Citation & reuse
Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — July 11, 2017 — Workshop 5-30-2017.” July 11, 2017. Workshop 5-30-2017. Crypt of Echoes evidence ID LED-2026-c76e20a12bad46138ae746b1bf3f7aca. https://cryptofechoes.com/evidence/LED-2026-c76e20a12bad46138ae746b1bf3f7aca. Accessed [date].
Catalogue citation: Okaloosa County Board of County Commissioners, Workshop 5-30-2017, meeting materials for July 11, 2017. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=15219&MeetingID=1421
Preserved county public-record source. Third-party attachments may retain their original rights.