AMENDMENT 01 TO EXHIBIT B— OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PM & DCP COMPENSATION & HOURLY PER DEIM RATE SCHEDULE AND DIRECT EXPENSES
Amendment 01 to Exhibit B—Compensation and
Hourly Per Diem Rate Schedule and Standard Rates
for Direct Expenses for Owner’s Representative and
Design Criteria Professional Services for the Arbennie
Pritchett WRF 5 MGD Expansion Design Build Project
The purpose of this document is to describe Constantine Engineering, Inc.’s compensation and
hourly per diem rate schedule of charges.
Compensation
As compensation for providing the services described in Amendment 01 to Exhibit A—Scope of
Basic Services for Owner’s Representative and Design Criteria Professional Services for the
Arbennie Pritchett WRF 5 MGD Expansion Design Build Project, CLIENT shall pay CONSULTANT
in accordance with the Agreement based on either a percent complete for identified Lump Sum (LS)
task or rate based for Time and Material (T&M) task. T&M task will be billed based on the hourly
per-diem rate schedule per employee grade, as defined in Table 1, for the actual time worked on the
Project. CONSULTANT’s standard Direct Expense rates will be identified and will be reimbursed
as defined in Table 2.
The Hourly Per Diem Rates are 1/8th of the tabulated per diem rate for a normal 8-hour workday.
Table 1. Hourly Per Diem Rate Schedule
Hourly Per Hourly Per
Diem Rate Diem Rate
Classification ($) Classification ($)
Principal 175.00 CADD Designer 71.00
Senior Reviewer/Consultant 175.00 CADD Technician 69.00
Program Manager 175.00 Construction Contract Administrator 157.00
Senior Project Manager 180.00 Construction Manager 131.00
Project Manager 159.00 Construction Inspector 76.00
Senior Professional Engineer 164.00 Construction Tech 66.00
Professional Engineer 116.00 Field Tech 2 76.00
Engineering Intern II 91.00 Field Tech 1 65.00
Engineering Intern I 82.00 Clerical/Administrative 49.00
Senior Environmental Scientist 127.00 2 Man Line Verification Field Team $183.00 (1)
Environmental Scientist 90.00 1-Man GPR/Locations Crew $140.00 (2)
Senior GIS/Database Programmer 95.00 2-Man Manhole Inspection Crew $159.00 (3)
GIS Technician 95.00 1-Man GPS Crew $117.00 (4)
Senior CADD Designer 73.00
(1) Note this rate includes the costs for vacuum excavation verification and sub-meter global positioning
system (GPS) with satellite differential real-time correction equipment, and expendables, excluding orange
buttons for permanent markers.
1
AMENDMENT 01 TO EXHIBIT B— OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PM & DCP COMPENSATION & HOURLY PER DEIM RATE SCHEDULE AND DIRECT EXPENSES
(2) Note this rate includes the costs for ground penetrating radar (GPR) location equipment; sub-meter GPS
with satellite differential real-time correction equipment, and expendables, excluding orange buttons for
permanent markers.
(3) Note this rate includes the costs for digital camera and sub-meter GPS with satellite differential real-time
correction equipment, safety equipment, and expendables to perform non-intrusive manhole inspections.
(4) Note this rate includes the costs for sub-meter GPS with satellite differential real-time correction equipment,
and expendables, excluding stakes, rebar, and orange buttons for permanent markers to perform asset locating
using sub-meter GPS equipment and data acquisition of above ground accessible assets.
Table 2. Standard Rates for Direct Expenses
Expense Category Rate ($)
Mileage Cost
Special Shipping Cost + 5%
CADD Computer Time Included in Per Diem
Lodging & Travel Cost
Additional Laboratory Tests & Analysis Cost + 5%
Extra Printing, Presentation Boards, Binding, & Reproduction Cost + 5%
Outside Services Cost + 5%
Special Owner Requested Computer Software (5) Cost + 5%
Special geographic information system (GIS) software including the Arc- ESRI products, hydraulic
(5)
modeling, or specific owner requested.
Table 2 applies only to Work Tasks 3, 5, 7, and 8. The other Work Tasks are Lump Sum cost and
will not have Direct Expenses.
The revised Total Budget Ceiling for this AGREEMENT is $1,287,400.00. The estimated individual
Work Tasks specified in Exhibit A-Scope of Services, for this AGREEMENT are presented in Table 3,
below:
Table 3. Breakdown of Budget Ceiling
Original Work Revised Work Task Amounts Compensation
Work Task Description Task t Amounts Method
1. Design/Build Team Procurement $ 223,400 $ 223,400 Lump Sum
Management
2. DCP Development/Design Services $ 300,300 $ 300,300 Lump Sum
/Design Coordination
3. Services During Construction, and $ 425,500 $ 425,500 Time &
Resident Observation Services Material
4. Agency Coordination and Public $ 14,700 $ 14,700 Lump Sum
Involvement
5. System Startup, Performance $ 51,400 $ 51,400 Time &
Evaluation, and Contract Close Out Material
6. Preparation of Process Operation $ 42,100 $ 42,100 Lump Sum
and Maintenance Manual
7. Miscellaneous Evaluations and $ 32,500 $ 32,500 Time &
Analysis Material
8. I&C Programming & Integration $99,500 $99,500 Time &
Material
2
AMENDMENT 01 TO EXHIBIT B— OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PM & DCP COMPENSATION & HOURLY PER DEIM RATE SCHEDULE AND DIRECT EXPENSES
9. Septage/FOG Receiving System $98,000 Lump Sum
Expansion
Total Overall Budget Ceiling $1,287,400.00
$1,189,400.00
CONSULTANT will keep CLIENT informed of progress so that the Total Overall Budget Ceiling
and/or work effort can be adjusted if found necessary. CONSULTANT is not obligated to incur
costs beyond the indicated Total Overall Budget Ceiling, as may be adjusted, nor is CLIENT
obligated to pay CONSULTANT beyond these limits. The Scope and Total Overall Budget Ceiling
for this AGREEMENT can be increased with an Authorized Amendment to this AGREEMENT
executed by both parties. When any amount has been increased, CONSULTANT’s excess costs
expended prior to such increase will be allowable to the same extent as if such been incurred after
the approved increase.
Time and Material (T&M) Work Tasks: Items 3, 5, 7, and 8 in the above table will be performed as
time and material compensation. The budget ceilings are an approximation and may require budget
adjustments as the PROJECT progresses. Such adjustment may be approved by the CLIENT without
an Amendment, provided the Total Overall Budget Ceiling is not exceeded. Above-mentioned
adjustments would occur with the submittal of each invoice, and would be approved by the
CLIENT via payment of the invoice.
******** END *******