READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 17, 2016 — TO4HMMMeigsDrive0001 — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
TO4HMMMeigsDrive0001 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Phone #: (___)
Address Fax #: (___)
City, State Zip Code Email:
PARTY RESPONSIBLE FOR PAYMENT (If different than Client):
Name Phone #: (___)
Address Fax #: (___)
City, State Zip Code Email:
CLIENT’S NAME:
AUTHORIZED BY:
(Please Print or Type) Title Date
Signature:
(Must be signed by a Principal or Officer of the Company)
Larry M. Jacobs & Associates, Inc. ▼ 328 E Gadsden St. ▼ Pensacola, FL 32501 ▼ 850-434-0846 ▼ Fax 850-433-7027▼ www.lmj-a.com
Figure #2
TERMS AND CONDITIONS
Larry M. Jacobs & Associates, Inc. (LMJ) its officers, stockholders, and employees, hereinafter referred to as the Geotechnical
Engineer of Record (GER), shall perform the services outlined in this agreement for the stated fee agreement.
Access To Site and Hidden Utilities
Unless otherwise stated, the GER will have access to the site for activities necessary for the performance of the services. The GER will
take precautions to minimize damage due to these activities, but has not included in the fee the cost of restoration of any resulting
damage. The GER shall not be responsible for damage to hidden utilities. It is the Clients’ responsibility to provide the GER with the
locations of said hidden utilities.
Fee
The total fee shall be understood to be an estimate, based on an agreed upon Scope of Services, and shall not be exceeded without
approval of the Client.
Indemnification
The Client shall indemnify and hold harmless the GER and all of its personnel from and against any and all claims, damages, losses and
expenses (including reasonable attorneys fees) arising out of or resulting from the performance of the services, provided that any such
claims, damage, loss or expense is caused in whole or in part by the negligent act of omission, and/or strict liability of the Client,
anyone directly or indirectly employed by the Client (except the GER) or anyone for whose acts any of them may be liable.
Hidden Conditions
A geotechnical condition is hidden if it is not encountered in the planned geotechnical investigation which incorporates currently
accepted standards of Geotechnical Engineering. If the GER has reason to believe that such a condition may exist, the client shall
authorize and pay for all costs associated with the investigation of such a condition and, if necessary, all costs necessary to correct said
condition. If (1) the client fails to authorize such investigation or correction after due notification, or (2) the GER has no reason to
believe that such a condition exists, the client is responsible for all risks associated with this condition, and the GER shall not be
responsible for the existing condition or any resulting damages to persons or property. The GER shall also not be responsible for the
release or aggravation of any hazardous materials encountered by the geotechnical investigation.
Risk Allocations
In recognition of the relative risks, rewards and benefits of the project to both the Client and the GER, the risks have been allocated so
that the Client agrees that, to the fullest extent permitted by law, the GER’s total liability to the Client, for any and all injuries, claims,
losses, expenses, damages or claim expenses arising out of this agreement, from any cause or causes, shall not exceed the total amount
of $50,000, the amount of the GER’s fee (whichever is greater) or other amount agreed upon when added under special conditions.
Such causes, include, but are not limited to the GER’s negligence, errors, omissions, strict liability, breach of contract or breach of
warranty.
Termination of Services
This agreement may be terminated upon 10 days written notice by either party should the other fail to perform his obligations
hereunder. In the event of termination, the Client shall pay the GER for all services, rendered to the date of termination, all
reimbursable expenses, and reimbursable termination expenses.
Ownership Documents
All documents produced by the GER under this agreement shall remain the property of the GER and may not be used by this Client for
any other endeavor without the written consent of the GER.
Applicable Law
Unless otherwise specified, the laws of the principal place of business of the GER shall govern this agreement.
Mediation
In an effort to resolve any conflicts that arise during the design or construction of the project or following the completion of the project,
the Client and the GER agree that all disputes between them arising out of or relating to this agreement shall be submitted to non-
binding mediation unless the parties mutually agree otherwise.
Page 2
December 22, 2015
Heath Jenkins PE
Hatch Mott McDonald
5111 N. 12th Avenue
Pensacola, Florida 32504
Re: Road Improvements Meigs Drive, Okaloosa County.
WSI Reference #2015-592
Dear Mr. Jenkins,
As requested, the following is our proposed scope of services and estimated costs necessary to
secure the required wetland resource permits for the proposed road improvements project located
in Bay County, Florida. This proposal includes a review of furnished project information, presents
our proposed scope of services, and contains deliverables and fee information.
SCOPE OF SERVICES
Activities remaining are basically focused on the preparation of Joint Application for Works in the
Waters of Florida and agency negotiations, as described above.
It is anticipated that the project will qualify for “minimal impacts project” guidelines as described
below. If impacts exceed the .50 acre threshold, regulatory interactions are increased and time
frames from obtaining authorization are compounded. Additionally, the Project is located near the
range of the Panama City crayfish
TASK 1 – APPLICATION PREPARATION AND AGENCY NEGOTIATIONS
Wetland Sciences, Inc. will prepare and submit to appropriate regulatory agencies necessary
applications for both State and Federal wetland resource permits. The following is a brief summary
of our proposed action plan:
State of Florida
The activity should qualify under the General Permit to Counties and Municipalities for paving, or
maintaining an existing County or Municipally owned and maintained roads, 62-330.448 Florida
Administrative Code. To ensure coverage under this general permit impacts to jurisdictional
wetlands cannot exceed one half acre. Wetland Sciences, Inc. will prepare a notice of intent to use
the noticed general permit by submitting and completing Form 62-346.900(2), “Notice of Intent to
Conduct a Noticed General Permit in Northwest Florida”.
Pursuing a noticed general permit would save the county time since the State must verify coverage
by a noticed general permit within 30-days after receipt of a complete application and permit fees
as verification by noticed general permit only requires a $250 fee. If for some reason the activity
does not qualify for a noticed general permit then we would pursue an individual permit. This
process would take additional time (DEP is required to issue individual permits within 90-days
after receipt of a complete application) and permit fees (individual permit requires $710 permit
1829 Bainbridge Ave. ● Pensacola, Florida 32507 ● Telephone: (850) 453-4700 ● Facsimile: (850) 453-1010
fee). Our fees to process an individual application would increase due to permit review
complications.
Federal
The activity should qualify under the Nationwide Permit #14 Program. This program authorizes
activities required for the construction, expansion, modification, or improvement of linear
transportation projects (e.g. roads, highways, railways, trails, airport runways, and taxiways) in
waters of the United States.
Both the State noticed general permit and Federal nationwide permit program authorize the
discharge of up to ½ acre of non-tidal regulated wetlands. Impacts greater than ½ acre will require
an individual permit. The exact form of authorization will be determined during the design, and
impact quantification process, but preliminary guidance suggests impacts can be maintained below
½ acre of impacts.
ESTIMATED FEES
The estimated costs to complete the services outlined above are presented in the following table.
Meeting Field Reporting Total Billing
Professional
Personnel Hours Hours Hours Hours Salary Overhead Profit Rate Total
Sr.
Scientist 4 8 20 32 $40.00 120.00% 10.00% $96.80 $3,097.60
Total
4 8 20 32 Fees $3,097.60
Markup
Expenses Number Rate Cost Percent Cost Total
Mileage 100 $0.52 $52.00 0.00% $52.00 $52.00
Permit
fees 1 $250.00 $250.00 0.00% $250.00 $250.00
Total
Expenses $302.00
Total this
task: $3,399.60
We are looking forward to working with you on this project. If you have questions regarding this
proposal, please do not hesitate to call.
Sincerely,
WETLAND SCIENCES, INC.
Craig D. Martin
Sr. Scientist
3308 Gulf Beach Hwy. ● Pensacola, Florida 32507 ● Telephone: (850) 453-4700 ● craig@wetlandsciences.com
