Steele Road Bridge FDOT Off-System Agreement — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Rev.: 05/15 FPID #.: 433910-1-52-01
COUNTY: Okaloosa
FAP #.: 00B3 190 B
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
OFF SYSTEM PROJECT AGREEMENT
This Agreement is between the State of Florida Department of Transportation,
“DEPARTMENT,” and Okaloosa County, a political subdivision of the State of Florida
“COUNTY.”
1. Highway Bridge Replacement and Rehabilitation Program funds are available for
the costs of the replacement, rehab, or inspection of bridges located off of the Federal-aid system
under 23 CFR 650.413(c); and
2. Steele Road over Penny Creek, Bridge No. 574013, requires replacement; and
3. Steele Road over Penny Creek is on Steele Road located in Okaloosa County,
Florida, a road not on the State Highway System; and
4. The parties agree that it is in the best interest of the State of Florida and the
COUNTY for the DEPARTMENT, if necessary, to act for the COUNTY in the acquisition of the
real property through voluntary acquisition and through the use of the power of eminent domain,
if necessary to complete this project, as authorized by Section 336.467, Florida Statutes; and
5. The parties agree that it is in the best interest of each party for the
DEPARTMENT to undertake and to complete all aspects of the bridge replacement work,
including but not limited to the design, construction, construction inspection, utilities, permits,
easements and other associated tasks.
NOW THEREFORE, in consideration of the mutual benefits to be derived by the terms
of this Agreement, the parties hereby agree as follows:
6. The recitals in paragraphs 1-5 above are true and correct and are made a part of
this Agreement.
7. The parties agree that the DEPARTMENT shall undertake and complete Project
No. FPID 433910-1-52-01, generally described as the replacement of Bridge No. 574013 Steele
Road over Penny Creek (the “PROJECT”), from Beginning CMP 0.241 to End CMP 0.307 on
Steele Road. The PROJECT is further described in the Construction Plans dated June 2015
Phase I (30%) submittal, including any revisions thereof as exist on file with the
DEPARTMENT (the “PLANS”). The PLANS and any revisions thereof as exist on file with the
DEPARTMENT are hereby incorporated by reference and made a part of this Agreement. The
COUNTY shall cooperate with and shall support the DEPARTMENT’s work efforts in these
regards. The DEPARTMENT shall have final decision authority with respect to the design of
the PROJECT and the design review process.
8. The COUNTY shall, through the passage of a formal resolution of the County
Commission, consent to and authorize the DEPARTMENT for the COUNTY, if necessary, to
take property (both real and personal) that is necessary to complete the PROJECT and, if
Page 1 of 7
Rev.: 05/15 FPID #.: 433910-1-52-01
COUNTY: Okaloosa
FAP #.: 00B3 190 B
necessary, to further do all acts necessary, including securing all environmental and regulatory
permits, easements, temporary construction easements and rights of entry associated with the
PROJECT, in the name of the COUNTY. Said authority and action shall be deemed to include
the DEPARTMENT’S use of the power of eminent domain to condemn the property necessary
for the PROJECT and to exercise prudent engineering judgment in the design and construction of
the PROJECT. The COUNTY shall be responsible to establish, in accordance with
DEPARTMENT standards, final right of way survey monumentation.
a) The recording of documents transferring real property acquired under this
Agreement in the official records of the appropriate county shall constitute and be deemed as
acceptance of ownership by the COUNTY. Recording of said documents shall be the
responsibility of the DEPARTMENT.
9. The COUNTY shall provide to the DEPARTMENT all documents necessary to
establish encumbrances and encroachments, if any, within the existing COUNTY right of way
necessary for completion of the PROJECT. The DEPARTMENT shall be responsible for
performing all title work necessary for any additional right of way that is required for the
PROJECT. In the event there is any action necessary to be taken to acquire ownership or to
extinguish any interest in or encumbrance or encroachment on any property within the
COUNTY’S existing right of way, the COUNTY shall take all actions reasonably requested by
the DEPARTMENT to accomplish the ends required. In the event title ownership issues cannot
be resolved so as to allow the PROJECT to move forward, the DEPARTMENT retains the right
to terminate this Agreement on that basis. Further, the COUNTY acknowledges that the right of
way must be cleared of all ownership interests, encumbrances or encroachments within the limits
of construction at least 90 days prior to the DEPARTMENT advertising the PROJECT for
construction. The DEPARTMENT shall have the sole discretion to determine the need to clear
any ownership, encroachment or encumbrance.
10. The COUNTY hereby appoints the DEPARTMENT as its agent for purposes of
the construction, reconstruction and relocation of utilities under section 337.403(1), Florida
Statutes. The COUNTY agrees to fully cooperate with the DEPARTMENT in the construction,
reconstruction and relocation of utilities that may be located within the existing or acquired right
of way. The parties agree to meet on a periodic basis, as determined to be necessary by the
DEPARTMENT, during the planning, design, construction and post-construction phase to
identify, plan and to relocate utilities. The responsibility for the costs associated with the
relocation of utilities shall be based on Florida law as it relates to said matters. The parties agree
that if existing utilities owned by the COUNTY are required to be reconstructed or relocated as
a result of the PROJECT that the costs associated therewith shall be deemed to be a cost of the
PROJECT to be paid for the by the COUNTY.
11. The COUNTY acknowledges that the DEPARTMENT will be utilizing federal
funds on the PROJECT and as a result thereof the COUNTY agrees to maintain the PROJECT in
perpetuity according to DEPARTMENT standards. The COUNTY further recognizes and
acknowledges that if the DEPARTMENT will be utilizing federal funds on the PROJECT that
the National Environmental Policy Act (“NEPA”) process will need to be completed and the
DEPARTMENT reserves the right to adjust the plans and or design of the PROJECT to meet the
Page 2 of 7
Rev.: 05/15 FPID #.: 433910-1-52-01
COUNTY: Okaloosa
FAP #.: 00B3 190 B
needs of the permits. The COUNTY agrees to fully cooperate in the provision of any and all
studies and or data that may be necessary for the NEPA process and for all other permit matters.
12. The COUNTY acknowledges and agrees that the right of way as described in the
PLANS and the improvements and structures located within the right of way, are and will remain
under the ownership of the COUNTY and that the DEPARTMENT will not have any ownership
interest in the right of way, improvements or structures located thereon. Notwithstanding the
requirements hereof, the DEPARTMENT is authorized to temporarily use the COUNTY’s
existing right of way for construction of the PROJECT and maintenance during construction
shall be the responsibility of the DEPARTMENT and its contractor.
13. The parties understand and agree that the DEPARTMENT and the COUNTY
shall cooperate with and keep each other well informed of the work efforts and progress
hereunder. In the event change orders or supplemental agreements become necessary during the
prosecution of the work the COUNTY agrees that it will sign all documents necessary to allow
the change order to be finalized and to allow the supplemental agreements to be fully executed.
The DEPARTMENT shall have the sole authority with respect to make all decisions relating to,
and including the need for, change orders and supplemental agreements.
14. All payment and performance bonds shall be issued in favor of the
DEPARTMENT. All warranties shall be made in favor of the COUNTY.
15. Upon completion of the PROJECT, the DEPARTMENT shall issue a Notice of
Final Acceptance to the contractor with a copy of said notice being provided to the COUNTY.
Upon issuance of the Notice of Final Acceptance, the COUNTY shall be immediately
responsible for the perpetual maintenance of the PROJECT. The DEPARTMENT shall also
have the right to assign interim maintenance responsibility to the COUNTY for specified
portions of the PROJECT before the issuance of the Notice of Final Acceptance. Said
assignment of maintenance responsibility shall be sent by the DEPARTMENT to the COUNTY
in writing with sufficient description to place the COUNTY on notice of the interim maintenance
responsibility. Notwithstanding the issuance of the Notice of Final Acceptance, the
DEPARTMENT shall have the right to assure completion of any punch list by the contractor.
Additionally, the COUNTY understands and agrees that the DEPARTMENT shall transfer all
permits to the COUNTY as the operational maintenance entity and the COUNTY agrees to
accept said transfer and to become fully responsible to comply with all operational and
maintenance conditions of the permits.
16. This Agreement shall become effective as of the date both parties hereto have
executed the Agreement and shall continue in full force and effect until the PROJECT is
completed by the DEPARTMENT and the improvements have been turned over to the
COUNTY by the DEPARTMENT by formal notice from the DEPARTMENT. The
DEPARTMENT reserves the right to unilaterally cancel its performance hereunder if it
determines that it is in the best interest of the public to do so. This discretion shall include, but
shall not be limited to budgetary and bid cost considerations.
Page 3 of 7
Rev.: 05/15 FPID #.: 433910-1-52-01
COUNTY: Okaloosa
FAP #.: 00B3 190 B
17. Pursuant to Section 287.058, Florida Statutes, the DEPARTMENT may
unilaterally cancel this Agreement for refusal by the COUNTY to allow public access to all
documents, papers, letters or other material subject to the provisions of Chapter 119, Florida
Statutes and made or received by the COUNTY in conjunction with this Agreement except for
the obligation of the COUNTY to maintain the PROJECT and said Agreement shall be perpetual
as to that obligation.
18. In the event that any election, referendum, approval or permit, notice or other
proceeding or authorization is required to be undertaken by the COUNTY to enter into this
Agreement or to undertake the PROJECT, the COUNTY will expeditiously initiate and
consummate, as provided by law, all actions necessary with respect to any such matters with
time being of the essence.
19. The COUNTY shall initiate and prosecute to completion all proceedings or
actions necessary to enable the COUNTY to provide any necessary funds for completion