READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-26-12 regular — reading text
Part 40 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31266-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
d
m
D.
62- 785.700( 17))
No comment required.
Post Active Remediation Monitoring Within 60 days of sample collection.
PARM) Report
Levelin Off Determination Within 60 tla s of sample collection. Within 60 days of recei t.
Within 60 days of receipt.
Post Active Remediation Monitoring Within 60 days of sample collection.
PARM) Plan resampling proposal
Rule 62- 785. 750 4 e , F. A. C.
Site Rehabilitation Completion Within 60 tlays of the final sampling event. If Within 60 tlays of receipt. If the
SRCR not approved then submit brownfield site meets the
Report ( SRCR)
modifications, etc. within 60 days of requirements of Chapter 62 -785,
Department' s response. F. A. C. for the issuance of a
SRCO, a SRCO will be issued.
Within 60 days of receipt
Pilot Study Work Plan When seeking approval before
implementation of a Pilot Study pursuant to
Rule 62- 785.700( 2), F. A.C.
No comment required.
Notices for Field Activities except Within seven ( 7) days but not less than 24
for Start of Interim Source Removal hours prior notice to the Department to
or Emergency Response Action perform field activity.
situations.
Submittal to the Department of Within 60 days of receipt of the Department' s Within the same time frame for
review of the original submittal.
addenda, responses, or response.
modification to plans or reports,
pursuant to Chapter 62 -785, F. A.C.
Submittal of Form and Actual See text of rule for " Initial Notice of No comment required.
Notice required in subsection Contamination Beyond Property Boundaries"
62- 785. 220( 2), F. A.C. in subsection 62- 785. 220( 2), F. A.C.
Submittal of Actual and See text of rule for " Subsequent Notice of No comment required.
Constructive Notice required in Contamination Beyond Source Property
subsection 62- 785.220( 3), F. A. C. Boundaries for Establishment of a Temporary
Point of Compliance (TPOC)" in subsection
62- 785. 220( 3), F. A.C.
ubmttal f proof of Constructive When seeking an SRCO with conditions, the No comment required.
01F
Notice required in subsection 62-
785. 68'0( 8) A.C.
PRFBSR must provide constructive notice of
the Department' s intent to approve a no
Further Action Proposal with controls.
Page iv of xv
Se leuld : 3uawgaeAy
gllm juewagjBV uogejlggegaa plagumoJS : 0980 MS ReMMJed du1S alaejIW SZ - "
a
ATTACHMENT C - - SITE ACCESS AGREEMENT s
aUN
Page v of xv
gl!m luamaar6V uopel!Ilgegakl plallumoug : OSSt) MS RemSred d1j1S aloealW SZ' VNSS leml l : luawgaelly r
a
NO
SITE ACCESS AGREEMENT
PERMISSION TO ENTER PROPERTY
BROWNFIELDS REDEVELOPMENT PROGRAM
a
Ym
a
I . The City of Fort Walton Beach, the real property owner (" undersigned" or " owner"), hereby gives
permission to the State of Florida, Department of Environmental Protection ( "Department ") and its agents
and subcontractors to enter the undersigned' s property ( "the property") located at 25 Miracle Strip Parkway,
SW, Fort Walton Beach, Florida as described in Attachment A attached to the BSRA for the brownfield site
assigned the Brownfield Site Identification Number BF661101000, beginning on the date of execution of the
BSRA and ending on such date as deemed appropriate by the Department or the successful completion of the
BSRA, whichever occurs first.
2. This permission is contemplated to be used for the following activities that may be performed by the
Department, its agents, representatives or subcontractors:
a. Having access to areas where contamination may exist.
b. Investigation of soil and groundwater including, but not limited to, the installation of groundwater
monitoring wells, the use of geophysical equipment, the use of an auger for collection of soil and sediment
samples, the logging of existing wells, videotaping, preparation of site sketches, taking photographs, any
testing or sampling of groundwater, soil, surface water, sediments, air, and other materials deemed
appropriate by the Department and the like.
C. Removal, treatment and/ or disposal of contaminated soil and water, which may include the
installation of recovery wells or other treatment systems.
3. Upon completion of the investigation, the Department will restore the property as near as practicable to its
condition immediately prior to the commencement of such activities.
4. The granting of this permission by the undersigned is not intended, nor should it be construed, as an
admission of liability on the part of the undersigned or the undersigned' s successors and assigns for any
contamination discovered on the property.
5. The Department, its agents, representatives or subcontractors may enter the property during normal business
hours and may also make special arrangements to enter the property at other times after agreement from the
undersigned.
6. The Department acknowledges and accepts its responsibility for damages caused by the acts of its employees
acting within the scope of their employment while on the property.
7. The Department acknowledges and accepts any responsibility it may have under applicable law ( Section
768. 28, Florida Statutes) for damages caused by the acts of its employees acting within the scope of their
employment while on the property.
8. In exercising its access privileges, the Department will take reasonable steps not to interfere with the
Owner' s operations, or the remediation and redevelopment activities pursuant to the BSRA.
Signature of Real Property Owner
Date
Page vi of xv
luawyoeRV r
411M 1UBW38JBV uollel!IlgeyaN PIDIIUMOA9 : 098t) MS APHO red dulS 31DUAW SZ - VNS9 leuld :
t°w Site Access Agreement aO1
Brownfield Site ID #:661101001 v
u
June 1, 2012
Page _ 1_ of _2_
aw
Accepted by the Department by the following authorized agent:
Signature of Department representative
Page vii of xv
05/ 05/ 2011 Revised BSRA Model
q; px; uawaojBV uope; lllgeyay plagUMOAS : O990 MS AemVed du78 aloenW SZ- VUSS leuH quawgoeuv N
a
ATTACHMENT D - - CERTIFICATION OF REDEVELOPMENT AGREEMENT YN
a
Page viii of xv
05/ 05/ 2011 Revised BSRA Model
SS leuld : lu8w43el} tl a,
Lill m luawaojBV uogeNllge4ab plat ;umoie : ogal,) MS RemHJed dPls aloenW SZ - "
a
CERTIFICATION OF REDEVELOPMENT AGREEMENT Y
ua
a
The City of Fort Walton Beach certifies it is the owner of the property subject to this BSRA
and desires to see the property through the entire redevelopment process until the site is
returned to a productive use. The City has been preliminarily speaking with restaurants
regarding required site parameters to see what may fit. Redevelopment of the site would
best be marketed as a location for small scale retail establishment or restaurant given it's
location, size, and current zoning as commercial.
The City of Fort Walton Beach and the PRFBSR are the same entity.
Page ix of xv
05/05/2011 Revised BSRA Model
41!x^ luawaajBV uolRE1111geyaa Plagumolg : 0990 MS RemMled du1S 013e11W SZ - VUSH leuld :ivawyoelltl
a
Y
ATTACHMENT E -- CONTRACTOR CERTIFICATION FORM aW
Page x
