READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-26-12 regular — reading text
Part 39 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31266-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
property:property:
LotsLots threethree
( ( 3)3) endend fourfour
( ( 4).4). BlockBlock
" " W,W, SeebraexeSeebraexe FirstFirst Addition,Addition, accordingaccording toto platplat t1weaf,t1weaf, asas roeonded roeonded inin
PlatPlat BookBook 2,2, pagepage 5555 oftheofthe PublicPublic RecordsRecords ofof OkaloosaOkaloosa County,County, FloridaFlorida andand anyany mobsmobs home,home, fotlurefotlure antant
ImprovementImprovement locatedlocated onon saidsaid propertyproperty
waswas soldsold to:to: CityCity ofof FortFort WeltonWelton Beach,Beach, Florida,Florida, forfor$ $ 149,149, 839.839. 00,00, whorewhore addressaddress b:b: P.P. O.O.
BoxBox 4009,4009, FortFort WeltonWelton Beach,Beach, Florida,Florida, 32649.32649.
WITNESS WITNESS mymy handhand andand thethe sealseal oror thethe CourtCourt onon thethe 23rd23rd dayday ofof December.December.
2009.2009.
DONDON W.W. HOWARD HOWARD
PreparedPrepared byby andand copiescopies to:to: ClarkClark ofof CcCc uu
JOSEPHJOSEPH D.D. LORENZ,LORENZ, Esq.Esq.
12701270 NorthNorth EglnEgln Pwk"Pwk" y,y, Eta.Eta. C•C• 1212
Shalimar,Shalimar, FLFL 5267952679 l.l.JJ
7'7' 4`4`
SallySally BussellBussell Fox,Fox, Esq-Esq-
3030 S.S. SpringSpring GuamGuam
PenaaoobLPenaaoobL FLFL 3250232502
` ` lele
Lea9aLea9a AA AndersenAndersen
725725 Jess"Jess" JewellJewell Parkway,Parkway, SE.,SE., SIS.SIS. 100100
Gainesville,Gainesville, CIACIA 3050130501
awnsawns
I HIHI 111111111111 11 1133 1IRC!1IRC!
20092009 CACA 000018000018 SS
K.K. e04e.e04e. 0'0'WIYCLrmr WIYCLrmr
nmunomnmunom RefsRefs mm
4/d4/d y><
y><04,- -04,4s'
4s'
cvcv
srsr eoleol
/. /.
I
gllm luawaalBV uollepligegay plallumolg : OSOO MS RemVvd dl 0S
- aloellW SZ- VHS9 leu! d : lu
CL
a N M a
7
v m
M a
mC7OY
d
in
c
M o
o V
m o
Nm RH
d
A3
N N p, tL1
TN._r ryd
O aN NN« LL
e
8
m
J
47Im luawaej6V uoBel! I! 9eLjsN Plagumoi9 : ogq L) MS Rem) led clujS aloenW gZ- V21SS leuld : lu8wy3el7V
a
ATTACHMENT B - - BROWNFIELD SITE REHABILITAITON SCHEDULE vY
aUW
Page ii of xv
4tpa luawaejBV uope7111g0488 Plal; umOJ13 : 0980 MS Al?" Ped d!r7S al3e4W SZ - VHS9 leuld :w8w43euv
a
Attachment B
Table I
Yu
a
Brownfield Site Rehabilitation Schedule
Type of Report or Activity PRFBSR Action or Submittal Department Review or
Time Frames Comment Time frames
Notice of Interim Source Removal Within 24 hours of initiation of the action. No comment required.
Action or Emergency Response
Action situations.
Interim Source Removal Proposal When seeking approval before Within 30 days of receipt
implementation of an alternative product
recovery method, groundwater recovery, soil
treatment or disposal technique (see Rule
62- 785. 500).
Interim Source Removal Plan When seeking approval before Within 30 days of receipt.
implementation of an alternative product
recovery method, groundwater recovery, soil
treatment or disposal technique (62- 785.500,
F. A.C.
Interim Source Removal Status Within 60 days of completion of source No comment required.
Report removal activities and every 60 days
thereafter or when the field activity is
terminated, whichever occurs first.
Interim Source Removal Report Within 60 days of completion of Interim Within 60 days of receipt.
source removal activities.
Site Rehabilitation Plan (SRP) or Optional: SRP submitted within 270 days of Within 60 days of receipt
Combined Document; ( Optional executing SSRA. May Include multiple tasks.
submittal)
See Rule 62- 785.450, F.A.C.
Site Assessment Report (SAR) SAR submitted within 270 days of executing Within 60 days of receipt.
BSRA, if applicable.
Risk Assessment Report ( RAR) Optional: within 60 days of SAR approval.) Within 90 days of receipt,
No Further Action (NFA) Proposal When the site meets the criteria for NFA ( See Within 60 days of receipt
Rule 62- 785. 680, F. A. C.).
Well Survey and Sampling Results Within 60 days of discovery of contamination Within 60 days of receipt.
pursuant to paragraph beyond the property boundaries
62-785. 600( 3)( h), F. A. C.
Natural Attenuation with Monitoring When the site meets the criteria for Natural Within 60 days of receipt.
NAM) Plan Attenuation with Monitoring (See Rule
62- 785. 690, F. A.C..
Natural Attenuation with Monitoring Within 60 days of sample collection. No comment required.
NAM Report
Remedial Action Plan ( RAP) Within 90 days of approval of a SRP, SAR or Within 60 days of receipt.
RAR.
As -Built Drawings Within 720 days of initiating operation of the No comment required.
active remediation system.
Initiate Operation of Active Within 720 days of RAP approval. No comment required.
Remedial Action
Proposals submitted pursuant to Optional during active remediation Within 60 days of receipt
subsection 62- 785J00( 15), F. A.C.
Remedial Action Status Report Within 60 days of the anniversary date of No comment required.
Monthly or quarterly status reports initiating operation of active remediation
may be required for submittal -- system.
depending on site conditions and
Advisory Committee.
Page iii of xv
4ili, luawaau6y uol1ellllge4oiJ plallumouf3 a 0980 MS AeMVred chAS olOUJIIN SZ - tli)SS leuld guawboegy n
u Post Active Remediation Monitoring
PARM) Plan
When the site meats the criteria for NFA (see
Rule 62- 785. 680) or Leveling -Off (see Rule
Within 60 days of receipt.
a
