READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-26-12 regular — reading text
Part 28 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31266-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
provide the program or service and in consideration of fees
within the surrounding localities:
2. 2. Deletion of Fees:
2.2. 1. Tabling and/or Rehearing of Municipal Planning Board meetings initiated by
applicant. $ 100 plus advertising and direct expenses. Development applications
will no longer be reviewed by the Municipal Planning Board. With
implementation of the City' s IQM2 MinuteTraq system, there are virtually no
expenses associated with forwarding an agenda item to the next available
meeting.
2. 2. 2. Conditional Use Request. $ 220. 00 filing fee plus $ 300. 00 deposit toward legal
ad plus direct expenses. The conditional use application and process was
eliminated in the new Land Development Code.
2. 2. 3. Development Orders, as broken down by gross floor area. $0.85 per 100 .square
feet to $ 1. 85 per 100 .square feet. This section was deleted and replaced with
two new flat fees for Expedited Development Order applications and Major
Development Order applications in order to continue streamlining the
development review process.
2.2. 4. " Directions" Comprehensive Plan $ 75. 00 per copy. This document is no longer
current. Should a citizen request an entire copy or pages from any planning
documents, a fee structure is available to charge by page.
ooCm. 1964A Page l
Packet Pg. 107
10. 4
RESOLUTION ( ID # 1864)
2. 2. 5. Designation of a Historic Site or Structure, Demolition ofa Structure Over 50
Years Old, or Request for Waiver from Archaeological and Historic
Preservation Act. $ 200 filing ,fee. This process no longer exists and the
application is no longer applicable. Historic preservation review has been
incorporated into the regular development review process.
2. 3. Addition of Fees:
2.3. 1. Notice of Intent to File an Appeal of Administrative Decision. $ 75. 00. The
ability to file a notice of intent prior to an application was added to the new
Land Development Code in order to allow applicants to initiate the process
within the required time frame without incurring major costs. The fee covers
staff time to process and document the request.
2.3. 2. Request for Administrative Waiver. $ 125. 00. This application and process
replaces the variance process for minor requests. The fee covers staff time to
review, provide determination, and document the request.
2. 3. 3. Minor Plat. $ 270. 00. The Minor Plat application replaces the subdivision plat
application for minor requests approved at a staff level. The process time for
review and approval is equivalent to that of a preliminary plat, thus, the fee is
equivalent to the preliminary plat fee.
2.3. 4. Planed Unit Development Application. $ 1, 650. 00. The revised Land
Development Code includes clear, streamlined procedures for review of a
Planned Unit Development ( PUD). The previous LDC referred to several
different applications in order to process and review a PUD, and therefore staff
had to charge several different fees in order to process a PUD application using
the current fee schedule. The proposed fee combines the rezoning fee and the
major development order fee for a total flat fee of $1, 650. 00.
2. 3. 5. Pre -Application Conference. $ 75. 00. The revised Land Development Code
includes the provision of a pro -application conference prior to the submittal of a
development order, which allows the application to " round- table" their project
with City staff from every applicable Department during one sitting. The fee
covers the staff time to prepare for and conduct the meeting.
2. 3. 6. Posted Property Notice, per sign. $ 45. 00. The revised Land Development Code
requires properties with a site -specific planning application to place a sign at
their property notifying the public of the proposed development This notice
replaces part of the previous process of holding several public hearings. The
revised LDC allows the applicant to pay a flat fee to the City to post the
property in lieu of it being the applicant' s responsibility in order to provide
more flexibility. The fee covers the City' s cost to produce and install the sign.
237. Mailed Notices. $ 21. 50. The revised Land Development Code requires that
letters be mailed to surrounding property owners for certain planning and
development applications. The revised LDC allows the applicant to pay a flat
fee to the City in lieu of it being the applicant' s responsibility in order to
PackM Pg. 106
0. 4
RESOLUTION ( ID # 1864)
provide more flexibility. The fee includes postage and printing costs for the
average number of properties that surround a typical site. The fee also covers
staff time to produce and mail the letters.
23. 8. Application for Expedited Development Order. $ 39.00. The new Land
Development Code was streamlined to provide a clear process for two types of
development applications. The Expedited Development Order Application fee
proposed is $ 39. 00 because it is the planning application equivalent of a
building permit base application fec. The fee only covers the staff time involved
in receiving application, reviewing the application for sufficiency, and preparing
the final memorandum and development order for the application. The fee does
not cover the technical review of the application.
23. 9. Application for a Major Development Order. $ 725.00. The new Land
Development Code includes a clear process for two types of development
applications. The Major Development Order review includes those applications
that take much more processing time and must be forwarded to City Council for
final review and approval. The fee includes the cost of a legal advertisement
plus the staff processing time.
2. 3. 10. Minor Amendment to Development Order. $75. 00. The new Land Development
Code includes a clear process for revising already submitted development order
applications. The fee covers staff time to determine whether the request is
consistent with the City' s Land Development Code as well as review the
original development order against the requested amendment.
2. 3. 11. Major Amendment to Development Order. $ 450. 00. The fee covers the legal
advertisement cost of the application as well as the processing time to review
the request and place on the City Council agenda for final approval.
2.4. Revisions to Existing Fees:
2. 4. 1. Appeals of Administrative Decisions. Revised from $415. 00 to $ 1, 500. 00. This
process now includes appeals of or " contesting" development applications
approved at a staff level. The application would be reviewed and prepared by
staff and include a " de nova" hearing by the Board of Adjustment, which means
the review and process time would start from the beginning as if it were a new
application. It would then be forwarded to the Board of Adjustment and
possibly City Council for final approval. The fee covers the costs of legal
advertisements and staff review and processing time. The fee is also meant to
discourage frivolous appeal applications.
2. 4. 2. Variance Request. Revised from $ 415. 00 to $ 925. 00. The proper variance
Process is equivalent to the processing and review time of a rezoning request;
therefore, the fee is equivalent to the rezoning fee.
2. 4. 3. Site Plan Review. Revised to clarify language and streamline the fee structure.
The current fee schedule for Site Plan Review has a category for residential and
a category for commercial. The proposed fee uses the lower fee of the two, and
Packet Pg. 109
10. 4
RESOLUTION ( ID # 1864)
combines the fee structure into only one category. The fee continues to be
applied " per 100 square feet ", however, the language has been revised to
include a review fee for improved site area or gross floor area, whichever is
greater. This captures many projects that do not necessarily include a building.
The language was also revised to clarify that the Site Plan Review fee includes
all multi- family residential and commercial projects.
2. 5. The fee schedule is also being revised to remove an obsolete fee for " Special event
boxes w/ two 60 gal plastic liners ". This type of sanitation collection is no longer
offered.
2. 6. The fee schedule is also being revised to remove the 20% cap for adjustments to golf
club green, cart, and tournament fees. The purpose of eliminating the cap is to enable
the Golf Club Manager, with concurrence of the Recreation Director and City Manager,
to reduce rates to promote play during slow periods. Recent promotions include kids
play free with a parent and complimentary green fees for city employees ( must pay cart
fee).
3. FINANCIAL INFORMATION:
3. 1. Resolution 2012 -15 amends the City' s Comprehensive Fee Schedule, which authorizes
the City to collect fees for certain services.
3. 2. The amended fee schedule will likely affect the amount of annual revenue collected for
the specified services. The amount of revenue collected, however, is based on the
number of LDC applications received or off p
- eak city employee golf rounds played.
4. RECOMMENDATION:
4. 1. Staff respectfully recommends City Council approval of
