READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-26-12 regular — reading text
Part 10 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31266-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Name: Charles R. Faulkner, Jr.
Its: Vice President
Muel afiejolS jaluM jol japio hsel : ooBL) suopaadsul Muel JaleM JapJO Msel leul& lO :luawyaegy M
IG
aOI
YU
a
N
quel aBejo1S raleM rol3ap30 ysel : 0981) suo!loadsul 8ue1 jaleM raPJ0 Hsel ieuiBIJ0 4u8w43elly
ry
D
II II
GOODWYN MILLS I CAWOOD
May 9, 2012
i
Ms. Helen Spencer
City Clerk
City of Fort Walton Beach
107 Miracle Strip Parkway SW
Fort Walton Beach, Florida 32548
RE: Physical Assessment of Water Storage Tanks
Executed Task Order
Dear Ms. Spencer:
Please find attached one original executed copy of the referenced Task Order for your files. If you
have any questions or require any additional information, please contact me at your convenience.
Best Regards,
D
a14;
Chuck Faulkner, PE
Attachment
GOODWYN. MILLS AND CAWOOD, INC.
1715E 13— ka Street, Swta E
Fl Walton eeaah. FL 3] SdB
7. 1 850 6830711 Fan 850683.8711
GMCNETWORK. COM
uel a6eaolS aa7em iol aapap Hsel 098 L) suo!loadsu „ uey aalepp aapa0 „ sey feuftio :luswuloegy
1
0
10 Carbon THIS PAPER WAS MADE WITH
FS(_ Neutral CEPTIPED UEHEWARIP ENERGY
Muad so--
6. 6. b
TASK ORDER
for
CONTRACT FOR GENERAL CONSULTING SERVICES
This task order is executed by the parties on the dates signed, shall become effective as of
the date signed by the last party, and incorporates by reference the entire Contract for General
Consulting Services between the City of Fort Walton Beach, a Florida municipality, with its
principal place of business at 107 Miracle Strip Parkway SW, Fort Walton Beach, Florida, ( "City")
and the Consultant:
Goodwyn, Mills and Cawood, Inc.
171 Brooks Street SE, Suite E
Fort Walton Beach, Florida 32548
Telephone Number: 850. 683. 0711
Facsimile Number: 850. 683. 8711
Section 1. Scope of Work
The Consultant shall perform the following services ( the " Work "):
0
Working closely with City Staff, perform a physical assessment of existing concrete potable
water and reuse water storage tanks and develop an Inspection Report that sets forth recommended w
maintenance items for each tank. Specific tasks to accomplish this shall include: r
0
m
Perform preliminary water storage tank surveys of each of the City' s three ( 3)
concrete storage tanks to assess the condition of the interior and exterior walls and
v
coating systems, screens, valves, hatches, fencing and other related appurtenances. O
The interior inspection will be limited to observing the inside of the full tank from
the top access hatch. This scope is not intended to include draining tanks, interior
wash downs, or video camera inspection of the interior of the tank. c
Provide Survey Reports with pictures and recommendations signed and sealed by a
professional engineer licensed in the State of Florida. The Report will identify tank,
coating and appurtenance condition assessments and maintenance recommendations.
Documents will be packaged in formats to be readily accessible to Staff, Developers,
Contractors and/ or Engineers.
Review these documents with appropriate City Staff, Management and Elected Officials as
directed by the Engineering & Utility Services Director.
Section 2. Project Schedule
The Consultant shall follow the following project schedule:
Time
Activity
1 Week after Task Order
Preliminary Water Tank Survey
Perform onsite observation and assessment of
PackM Pg. 39
8. 6.h
three ( 3) water storage tanks to include photos
and recommendations
2 Week after Preliminary Survey
Water Tank Survey Reports
Draft three ( 3) survey reports and recommendations
Meet with City Staff and thoroughly review reports
and recommendations
Final Documents with all Comments 1 Weeks after Final Comment
Incorporate final comments into documents
Review with City
Section 3. Price & Payment of Project
The Consultant shall be compensated as follows:
Fixed Price. The Consultant' s compensation shall be a fixed price ( lump sum) of $5, 440 to
be paid as work progresses in the following manner:
Reuse Tank at FWB Golf Course
820
Preliminary Water Tank Survey
1, 100
Survey Reports Submitted for Review
Final Documents 800
Sub -Total 2, 720
Concrete Tanks at Hughes and at Hill Avenue
820
Preliminary Water Tank Survey
1, 100
Survey Reports Submitted for Review
Final Documents 800
Sub -Total $ 2, 720
Reimbursable Expenses. The Consultant' s compensation shall include printing costs with a
1. 2 multiplier.
Section 4. Insurance/ Payment /Performance Bond
Insurance documents included in General Services Agreement.
Section 5. Time of Completion
Work shall commence upon the execution of this Task Order and be completed per the
schedule outlined above in Section 2.
Packet Pg. 40
8. 6. b
CITY OF FORT WALTON BEACH, FLORIDA
2012
By '
Dated
Michael Beedie, Acting City Manager
Attest:
Helen Spencer, City Clerk
CONSULTANT
2012
By:
Dated
Printed Name: Charles R. Faulkner, Jr.
Its Vice President
PadtM Pg. 41
to.l
City ENGINEERING
Council of Fort Walton Beach
0
To:
& UTILITY SERVICES
MEMORANDUM
Michael D. Beedie, Acting City Manager
From: Michael Beedie, Engineering & Utility Services Director
Date: June 26, 2012
Subject: 2012 -11 Adopts FY 12 - 13 CDBG Annual Action Plan
1. BACKGROUND:
1. 1. The City of Fort Walton Beach is an entitlement community with the Community
Development Block Grant ( CDBG) Program through the U. S. Department of Housing
Urban Development ( HUD). Each year, City staff develops an annual action plan for
the distribution of the entitlement funds.
1. 2. For FY 2012 -13, the City expects to receive an entitlement grant of $124, 541 through
the CDBG program. This amount is approximately 1. 6% less than FY 2011 - 12.
13. City staff works closely each year with the Citizen' s Advisory Committee ( CAC) and
the public to develop a plan that is consistent with the needs of the community and the
mission of HUD.
2. DISCUSSION:
2. 1. The Citizen' s Advisory Committee accepted applications from the pubic for potential
projects to be funded with the FY 2012 -13 entitlement grant. After several public
meetings and review of the applications, the following projects were recommended for
approval:
2. 1. 1. Planning and Administration
The City of Fort Walton Beach Engineering & Utility Services Department
administers the CDBG program and is responsible for conducting all public
hearings and meetings, advertising the report, advertising for and accepting
applications, reviewing applications, staffing the Citizen' s Advisory Committee,
administering funds to sub -grantees, preparing the Annual Action Plan,
preparing the CAPER each year, and preparing the Five -Year Consolidated Plan
every five years, among other administrative duties.
2. 1. 2. World Changers
Given the overwhelming success and accomplishments of this program in past
years, the City and CAC recommended funding this program for FY 2012 -13.
The World Changers program provides repairs and upgrades to homes of low to
moderate income families.
2. 1. 3. Chester Pruitt Youth Enrichment Program
Chester Pruitt is a local youth recreation center that offers summer programs,
Page 1
DOC m. 18478
Packet Pg. 42