READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 6, 2015 — Agenda Packet — reading text
Part 3 of 34. These parts divide the reading text for browsing; they are not the source document's page numbers.
Agenda Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
$2,261,493 $2,547,225 $2,742,529 $195,304 7.7%
Capital Outlay $23,326 $221,228 $1,338,649 $1,393,966 $55,317 4.1%
Debt Service $0 $0 $0 $0 $0 0%
Grants & Aids $0 $0 $0 $0 $0 0%
Other Uses $0 $0 $0 $0 $73,512 0%
TOTAL $8,187,729 $8,518,479 $10,437,555 $10,960,963 $523,408 5.0%
Packet Pg. 25
CTTF Overview Accounts
FY14 FY15 FY16 FY15/FY16 Increase/
Code Category Approved Approved Proposed +/- Decrease
10 SALARIES & WAGES $4,566,312 $4,520,805 $4,601,575 $80,770 1.8%
20 BENEFITS $1,964,892 $2,030,876 $2,149,381 $118,505 5.8%
31 PROFESSIONAL SERVICES $30,500 $3,000 $103,000 $100,000 3333.3%
34 CONTRACT SERVICES $138,508 $134,518 $135,454 $936 0.7%
40 TRAVEL & PER DIEM $5,850 $6,200 $7,250 $1,050 16.9%
41 COMMUNICATIONS SERVICES $26,540 $27,740 $32,160 $4,420 15.9%
42 FREIGHT & POSTAGE $2,100 $2,000 $2,000 $0 0%
43 UTILITY SERVICES $109,000 $123,500 $192,500 $69,000 55.9%
44 RENTS & LEASES $6,820 $6,820 $8,320 $1,500 22.0%
45 RISK MANAGEMENT ALLOCATION $153,652 $168,913 $162,313 -$6,600 -3.9%
46 REPAIR & MAINTENANCE $881,950 $964,644 $912,573 -$52,071 -5.4%
47 PRINTING & BINDING $ 950 $950 $930 -$20 -2.1%
49 MISCELLANEOUS CHARGES $12,525 $29,675 $39,950 $10,275 34.6%
Packet Pg. 26
CTTF Overview Accounts Continued
51 OFFICE SUPPLIES $6,300 $6,300 $6,800 $500 7.9%
52 OPERATING SUPPLIES $885,021 $819,005 $648,562 -$170,443 -20.8%
53 ROAD MATERIALS & SUPPLIES $205,000 $223,000 $457,557 $2,000 105.2%
54 BOOKS/PUBS/SUBS & MEMBERSHIPS $8,360 $11,860 $5,460 -$6,400 -54.0%
55 TRAINING & EDUCATION EXPENSES $18,700 $19,100 $27,700 $8,600 45.0%
60 CAPITAL OUTLAY $594,845 $1,338,649 $1,393,966 $50,057 4.1%
99 RESERVES $0 $0 $73,512 $73,512 0%
TOTAL $9,617,825 $10,437,555 $10,960,963 $523,408 5.0%
Packet Pg. 27
Packet Pg. 28
1 Program
Description 2 test Major
Accomplishments 3 test Program
Goal
Provides Support Traffic Signals Infrastructure
Advanced Traffic Assisted FDOT: Successfully Manage
Control System (ATCS) US 98/Cody Flyover the ATCS and
Maintenance and SR 123 North Flyover Signalized
Operation Intersections to
Safe, Efficient Design of US 98
widening Project in encourage Signal
Operation of All Destin Enhancements &
Signalized Intersections Upgrades of existing
Provides Safety for the Intersection
Improvements for SR systems
Traveling Public 189 and SR 393 (Mary Improve Traffic Flow
Esther during peak times
Revenues Coordinated Fiber
Fuel Taxes, Intergovern- Trunk Cut @ SR 123 Plan and Design for a
mental Revenue, FDOT Traffic Operations
Grant, Charges for Mgt Center
Services and Other
Miscellaneous Revenue Packet Pg. 29
Traffic Performance Measures
Actual Approved Proposed
Performance Measures
FY 14 FY 15 FY 16
Number of Employees 6 6 6
Input Operating Budget $170,594 $172,841 $215,084
Capital Outlay $32,200 $42,200 $79,050
Routine Intersection Inspections planned 1,718 862 1,770
Traffic Signal Timing Issue Citizen/Sheriff 102 138 100
Emergency Issue: flash or dark 102 100 100
Output
Utility Locate Tickets Issued: 4569 2744 5,000
Incident: Traffic Equip Damage 20 46 45
Total Work orders 550 282 300
Packet Pg. 30
Traffic Performance Measures (continued)
Actual Approved Proposed
Performance Measures
FY 14 FY 15 FY 16
Routine Intersection Inspections completed 1466 758 1,770
Efficiency
Utility Locate Tickets that Require Processing 1205 496 1,100
Routine Inspections 85% 88% 100%
Effectivenes
Funding Ratio FDOT to County 1.56 : 1 1.79 : 1 3.07 : 1
Packet Pg. 31
Traffic Expenditures
Expenditures Budget
FY13 FY14 FY15 FY16 FY15/FY16 Increase/
Category Actual Actual Approved Proposed +/- Decrease
Personnel Services $308,436 $324,453 $341,637 $353,349 $8,733 3.4%
Operating Expenses $114,622 $142,683 $172,841 $215,084 $42,243 24.4%
Capital Outlay $23,326 $45,513 $43,014 $79,050 $36,036 83.8%
Debt Service $0 $0 $0 $0 $0 0%
Grants & Aids $0 $0 $0 $0 $0 0%
Other Uses $0 $0 $0 $73,512 $0 0%
Total $446,384 $512,649 $557,492 $720,995 $163,503 29.3%
Packet Pg. 32
Traffic Accounts
FY14 FY15 FY16 FY15/FY16 Increase/
Code Category Approved Approved Proposed +/- Decrease
10 SALARIES & WAGES $244,394 $253,918 $251,538 -$2,380 -0.9%
20 BENEFITS $82,445 $87,719 $101,811 $14,092 16.1%
34 CONTRACT SERVICES $21,000 $17,010 $17,010 $0 0%
40 TRAVEL & PER DIEM $2,950 $3,300 $3,300 $0 0%
41 COMMUNICATIONS SERVICES $2,500 $2,500 $2,500 $0 0%
42 FREIGHT & POSTAGE $1,000 $1,000 $1,000 $0 0%
43 UTILITY SERVICES $30,000 $30,000 $60,000 $30,000 100.0%
44 RENTS & LEASES $20 $20 $20 $0 0%
45 RISK MANAGEMENT ALLOCATION $9,526 $10,557 $8,068 -$2,489 -23.6%
46 REPAIR & MAINTENANCE $71,719 $72,443 $93,295 $20,852 28.8%
47 PRINTING & BINDING $50 $50 $30 -$20 -40.0%
Packet Pg. 33
Traffic Accounts
FY14 FY15 FY16 FY15/FY16 Increase/
Code Category Approved Approved Proposed +/- Decrease
49 MISCELLANEOUS CHARGES $100 $5,500 $6,075 $575 10.5%
51 OFFICE SUPPLIES $300 $300 $300 $0 0%
52 OPERATING SUPPLIES $27,279 $26,011 $19,336 -$6,675 -25.7%
54 BOOKS/PUBS/SUBS & MEMBERSHIPS $950 $950 $950 $0 0%
55 TRAINING & EDUCATION EXPENSES $3,200 $3,200 $3,200 $0 0%
60 CAPITAL OUTLAY $32,200 $43,014 $79,050 $36,036 83.8%
TOTAL $0 $0 $73,512 $73,512 0%
Packet Pg. 34
Packet Pg. 35
Program Description
Provides Services to the Public
Roadway Design
Stormwater Management
Topographical and Construction Surveying
Land Development Review and Permitting
Construction Inspections
Construction Contract Administration
Packet Pg. 36
Major Accomplishments
Tanglewood and Overbrook Stormwater
Pond Improvements
Shalimar Gateway Landscaping
Foy Shaw Parkway Project Study
Department of Corrections Parking Lot
In Progress- Martin Luther King Jr., Blvd.
and Green Acres Blvd. Reconstruction
Inspections & Plan Reviews
Packet Pg. 37
FY16 Engineering & Administration Includes:
Salaries, Benefits and Operating Expenses for:
Engineering Staff (5) | Survey Staff (5) | Development Review Staff
including Inspectors (4)
Included Salaries and Benefits only for:
Public Works Director (1) | Road Division Management Staff (2) |
Administrative Staff (5) | Supply Staff (4)
Includes 2 New Positions:
Program Technician II (Administrative)
Supply Specialist (Supply)
Packet Pg. 38
Expenditures
Expenditures Budget
FY13 FY14 FY15 FY16 FY15/FY16 Increase/
Category Actual Actual Approved Proposed +/- Decrease
Personnel Services $1,028,745
