READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2011-28--final budget — reading text

Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-29737-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

10.500. 00 401- 1310 5336214 Dec 2011 72950 09/ 13/ 11 Tbompeon Pump & Mnnufamud 400' Wellpoint System 11; 311. 66 401 1350 535- 6402 Oct 2011 72374 07/ 11/ 11 Covered Systems & hommenati W ell 8 Electrical U,, r d, 13. 80000 4015026 5334680 Nov 2011 69655 08/ 27 / 10 Hatch Moo MacDonald PSI & Force Main Evaluaion & Enger eving 31, 96911 401 5031 535 3100 Dec 2011 72179 0620/ 11 C112MHill Sanitary Sewer Evaluation Study 67, 38L50 401 5032 535 3100 Face 2011 67209 1124 /09 Herey Met,,, Coloration Water Meter Replacement 23, 906. 00 401 5367- 533 6368 Face 2011 116291 09/ 14/ 11 He,,, Meter Cotporatiov Water Meer Replacement ten1nu Mw „tier 4095. 00 4015367533 6368 Dec 2011 70248 10 /27/ 10 CH2MHill R, claimN Weer Master Plan- RWSAStudy 28. 650. 00 401- 53965353100 N0v2011 116325* 09/ 14/ 11 Teledyne lsco. Inc Sewer Flaw Morivm 50, 000. 00 401- 5398 535 6402 Oct 2011 72763 08/ 25 / 11 The Water Spigot TCLPonGrit 1. 13000 401 4965355200 Oct 2011 Utilities Fund 258, 742. 27 116290* 09/ 14/ 11 Hatch Mott MacDonald Stoneware, Marmr Plan 205, 000 W 405 13%0- 538 3100 tin 2012 71896 05 /16 /11 Goodwyn. Mills. & Cawood Topographic Survey- Biotdemion Retrofit 1, 000. 00 405- 1583 5383100 Tice 2011 Stormwarer Fund 206, 000. 00 Purchase Order Encumbrance Carryover - All Funds rrequi it on number: purchme order not yet i, med

Download this text file with its original spacing ↓