READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 04-26-11 regular — reading text

Part 52 of 65. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-26904-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

shall be a 3. 00" with a 3. 00" valve, terminating with a male 3. 0" National Standard hose thread adapter. Proposals shall provide details regarding exact location, construction, and operation of each discharge. Meets Exceeds Comments: Y V3 H L d 222. DISCHARGE OUTLETS ( Front) There shall be a preconnected hose bed area within or on the front bumper extension. The J hose bed must be capable of storing 200' of double jacketed 1. 75" fire hose and nozzle and an M additional 1 00' of 2. 50" double jacketed fire hose. The 2. 50" shall be connected to an Elkhart 0 Rapid Attack Monitor ( RAM) that shall be mounted in a RAM Truck Storage Mount. a Two separate discharges shall be plumbed with 2. 50" piping with a 2. 50" full flow ball valve controlled at the pump operator's panel. F 3 The discharges shall have a 90- degree swivel and terminate with 1. 50" and 2. 50" a MNHT. Each swivel shall swing side to side same as a crosslay. 00M N Automatic drains shall be provided at all low points in the plumbing. Proposals shall provide significant detail regarding the construction, materials, and hose securing devices for the front bumper pre- connected hoselines. Meets Exceeds Comments: 223. DISCHARGE CAPS Chrome plated, rocker lug, caps with chains shall be furnished for all side discharge outlets. The cap shall incorporate a thread design to automatically relieve stored pressure in the line when disconnected. Meets Exceeds Comments: 224. OUTLET BLEEDERS A .75" bleeder valve shall be provided for each outlet 1. 50" or larger. Automatic drain valves are acceptable with some outlets if deemed appropriate with the application. Proposals shall provide details regarding the location and operation of outlet bleeders, valves, and water discharge location. Meets Exceeds Comments: Page 63 of 93 225. DISCHARGE OUTLET CONTROLS The discharge outlets shall incorporate a quarter -turn ball valve with the control located at the pump operator's panel. The valve operating mechanism shall indicate the position of the valve or an indicator shall be provided to show when the valve is closed. The passenger side discharges shall be controlled by a controller with the manual override located on the passenger side pump panel. In addition to valve position, each controller shall include a pressure display. The controller unit shall have solid state electronics to provide easy, two ( 2) button open and close valve position capability with valve position indicator lights, and current limiting valve motor stopping capability. The unit shall be in water resistant brass housing and shall come with all required installation cables and harnesses. All other outlets shall have manual swing handles that operate in a vertical up and down motion. These handles shall be able to lock in place to prevent valve creep under pressure d Meets Exceeds Comments: V V o J M 226. AERIAL OUTLET 0 The aerial waterway shall be plumbed from the pump to the water tower line with 5. 00" pipe and a 4. 00" valve. The waterway shall be capable of flowing a minimum of 1500 gallons per a minute. Proposals shall include details regarding valve location and operation. L Meets Exceeds Comments: 3 a 227. CROSSLAY HOSE BED 00MN There shall be a cross -lay hose bed( s) capable of carrying one ( 1) cross -lay of 200' of 2. 5" double jacketed hose and two ( 2) cross -lays of 200' of 1. 75" double jacketed hose. U_ Removable trays will be provided for each cross -lay to provide ease in loading and unloading NU hose. aa Proposals shall provide details regarding the location, construction, and operation of each cross -lay and associated tray, and the method to be used to secure each cross -lay end on each side of the vehicle. d Meets Exceeds Comments: Jo d s 228. TRAY, CROSSLAY R There shall be one ( 1) additional tray provided for the cross -lays. The tray shall be identical in a design and shall be shipped with the loose equipment. Meets Exceeds Comments: 229. FOAM SYSTEM A foam system shall be provided. The system shall consist of a minimum 40- gallon foam cell that has a direct connect outlet at the operator's pump panel. A 125 gpm foam eductor, capable of connecting to the foam cell outlet shall be included with the vehicles loose equipment. Page 64 of 93 14.2. b The system shall plumbed and installed to have the ability to deliver the following minimum foam solution flow rates at accuracies that meet or exceed NFPA requirements at a pump rating of 150 psi. 100 gpm @ 3 percent 300 gpm @ 1 percent 600 gpm @ 0. 5 percent Proposals shall provide details regarding the location of the foam cell, construction, piping, refill, drain, and operation of the foam system. Options for automatic systems will be considered. Meets Exceeds Comments: Y 230. PUMP CONTROL PANEL Pump controls and gauges shall be located midship at the left (driver's) side of the apparatus and properly identified. The aerial waterway discharge and 3. 00" discharge shall have a gpm flowmeter in addition to a standard pressure gauge. o r It is preferred the main pump operator's control panel be completely enclosed and located in a forward section of the body compartment to protect against road debris and weather elements. Proposals shall include significant details regarding the location, construction, layout, and operation of the apparatus pump panel; to include pump and plumbing access a details. M Meets Exceeds Comments: 231. PUMP OPERATOR' S PLATFORM A pull out, flip down platform shall be provided at the pump operator's control panel The front edge and the top surface of the platform shall be made of bright aluminum treadplate. The platform shall be approximately 13. 75" deep when in the stowed position and approximately 22. 00" deep when extended. The platform shall be as wide as possible. The platform shall lock in the retracted and the extended position. The platform shall be wired to a " step not stowed" indicator in the cab. Meets Exceeds Comments: 232. PUMP AND GAUGE PANEL The pump operators panels and gauge panels shall be constructed of stainless steel with a brushed finish, or other material and finish agreeable to the customer. Discharges, valves, and operational hardware shall all be color -coded with appropriate tags and /or labeling. Proposals shall provide details on pump and gauge panel construction and materials; including the construction and operation of all gauges, indicators, and items found at the pump panel location. Page 65 of 93 Meets Exceeds Comments: 233. AIR HORN BUTTON An air horn control button shall be provided at the pump operator's control panel. This button shall be properly labeled and put within easy reach of the operator. Meets Exceeds Comments: 234. WATER LEVEL GAUGE, CAB SIDES There shall be two ( 2) additional water level indicator, LED modules, installed ONE EACH SIDE OF CAB BEHIND CREW DOOR. Y V This light module shall include four (4) colored levels, and function similar to the water level L indicator located at the operators panel: Ld First green module indicates a full water level. JM Second blue module indicates a water level above 3/ 4 full. M Third amber module indicates a water level above 1/ 2 full. 0 Last red module indicates a water level above 1/ 4 full and empty. Above 1/ 4 this light shall be steady burning. a U_ At empty this light shall be flashing. L M This module shall be activated when the ignition switch is activated.

Download this text file with its original spacing ↓