Continue to Upgrade Water and Sewer Lines Throughout the CRA
Consider Narrowing Excess Right -of -way and Creating or Extending
Alleyways in the CRA
Increase the Use and Screening of Joint Use Dumpsters
Consider an Underground Utilities Program in the CRA
Consider Narrowing Excess Rights -of -way and Creating or Extending
Alleyways in the CRA
Aging infrastructure can be a significant impediment to successful redevelopment While Fort
Walton Beach is a leading center for technology and job growth, deficiencies still exist such as
utility lines, water & sewer, streets, and sidewalks. A continual program for updating
infrastructure can make the area more attractive for redevelopment, in cum, attracting more
residents, businesses, and visitors.
The CRA maintains annual sidewalk and pavement improvement Capital Improvement Programs
CIP). The purpose of the pavement improvement program is to perform preventative
maintenance on roads to prevent them from deteriorating to a point requiring a complete
rehabilitation. The CRA could also consider utilizing funding to match needed road
improvement projects including capacity projects, congestion management, and other
transportation projects, including bike lanes.
The annual sidewalk improvement program is designed to increase pedestrian safety and provide
a pedestrian- friendly urban environment in the CRA. The sidewalk program should consider the
classification of each road, as some roads require wider sidewalks further away from the main
street.
City of Fort Walton Beach
2012 Community Redevelopment Plan
1. Continue the annual pavement improvement program and possibly expand the program to
include other road improvement projects, such as capacity building, bicycle lanes, congestion
management, and enhanced pedestrian features.
2. Continue adding sidewalks and improving existing sidewalks where needed. If possible,
construct wider sidewalks, allowing for multiple modes of non -motorized transit to occur
simultaneously. Develop a prioritized list of sidewalk improvement projects.
Aging and failing water and sewer lines make the Fort Walton Beach CRA less attractive for
redevelopment compared to newly built areas. Upgrading these lines to accommodate higher
density may attract more developers to the CRA.
1. Consider implementing a yearly program to utilize CRA funds to complete needed
underground infrastructure in the CPA. Though infrastructure can be costly to update, this
program can attract developers into the CRA and make the area more competitive compared
to other newly built areas.
Offer incentives to incoming developers, such as a Development Infrastructure grant
program, that may provide up to 75% of qualifying expenses necessary to upgrade
infrastructure for incoming commercial and residential projects in the CRA.
Objective 2. 3 — Increase the Use and Screening of Joint Use Dumpsters
In many locations, multifamily residents and businesses rely on individual garbage cans,
primarily due to space limitations for dumpsters. For small businesses, even the smallest
dumpster may be too large for the business needs.
However, in areas with small lots, narrow sidewalks, or
narrow streets, the proliferation of garbage cans, seen in
the photograph below, is
unsightly and potentially
unsanitary. The City could
coordinate with users to _
establish a location for
dumpsters to serve
multiple users, reducing the need for individual garbage cans.
In addition, dumpsters, whether currently in use or provided [ o
meet this objective, should be screened from view to the maximum extent possible.
2012
City of Fort Walton Beach
2012 Community Redevelopment Plan
1. Develop a program for establishing joint use dumpsters in areas now cluttered with
individual garbage cans.
2. Provide financial incentives for installing screening or landscaping to buffer existing
dumpsters to improve the appearance of these facilities throughout the CRA.
Traditional overhead utility lines connected by utility poles can create visual clutter and inhibit
urban center development patterns. Placing utilities lines underground contributes to an overall
pedestrian- friendly environment and may prove to be safer and more reliable during hurricanes
and other natural disasters. Converting overhead utilities to underground utilities is not without
its drawbacks. Therefore, the CRA should consider all aspects of an underground utilities
program and should evaluate the cost benefit for each individual project.
The City has completed several steps towards beginning an underground utilities program,
including a Feasibility Study in 2007 and obtaining estimates from Gulf Power for the Eglin
Parkway corridor. If the CRA wishes to pursue underground utilities, several more steps must be
taken.
1. Coordinate with Gulf Power to produce binding estimates for converting overhead utilities to
underground along major corridors, such as Eglin Parkway, Brooks Street, and Miracle Strip
Parkway.
2. Consider different funding scenarios to complete the entire project in one or more phases.
Several problems exist with phasing an underground utilities project including: the
substantial cost of a temporary to overhead construction pole, additional mobilization costs,
matching fixtures due to different manufacturers during different bids, and additional set -up
costs.
3. Coordinate with Gulf Power for placement of utility lines in alleys, especially during
implementation of programs to create or extend alleys and when underground placement is
not feasible.
4. Continue the CRA Streetscape grant program, which provides matching funds to private
businesses for underground utilities.
Objective
Extending Alleyways in the CRA
Several streets in the CRA have excess right -of w - ay that is currently underutilized. In some
areas, the right -of -way can be " transferred' to alleyways. Extending and creating alleyways
2012
City of Fort Walton Beach
2012 Community Redevelopment Plan
allows pedestrians a place to walk far away from traffic and noise and also allows businesses
adequate space for storage and loading/ unloading.
1. Implement a pilot study that will decrease the right -of -way ( ROW) on Chicago Avenue and
extend the alley that currently exists parallel to Chestnut Avenue and Chicago Avenue and to
the south of Oak Street. Extend that alley north to Ferry Road and south to First Street.
2. Based on the success of the alley extension pilot study, more alleys may be created and/ or
extended.
Just as infrastructure improvements are vitally important to support growth and redevelopment in
the CPA, transportation improvements are equally important. The transportation system should
provide for safe and efficient mobility allowing residents and visitors to travel from residential
areas to shops and restaurants. A good transportation system is also a key component of an
effective mixed -use district, supporting a compact mix of land uses. The following section will
outline the goal for the transportation system in the Fort Walton Beach CRA, as well as the
objectives and strategies formulated to achieve the goal.
City of Fort Walton Beach
2012 Community Redevelopment Plan
COMPONENT 3 - TRANSPORTATION
TRANSPORTATION GOAL:
ENSURE THE AVAILABILITY OF AN ADEQUATE AND SAFE MULTIMODAL
TRANSPORTATION SYSTEM THROUGHOUT THE CRA
Objectives:
Improve Safety Through Installing Traffic Calming and Congestion
Management Design Features
Promote the Use of and Enhance the Availability of Transit Facilities
Continue to Promote Walkable Areas Throughout the CRA Through the
Installation of Pedestrian -Friendly Features
Ensure Adequate Bicycle Facilities Throughout the CRA
Ensure Adequate and Accessible Parking Throughout the CRA
The transportation system within the Fort Walton Beach CRA is functional, but can be congested
and unsafe at times. Major arterial roads such as Miracle Strip Parkway ( U. S. Highway 98),
Eglin Parkway ( State Road 85), and Beal Parkway ( State Road 89) carry a capacity of up to
33, 500 AADT ( average annual daily traffic), 38, 000 AADT, and 15, 000 AADT, respectively.
Due to the already built -out nature of the City, and the CRA specifically, most road widening
projects to increase capacity through additional lanes on major roadways are not feasible.
Therefore, it is important to focus on transportation improvements that can improve mobility in
the CRA, such as enhanced pedestrian facilities, bikeways, and other congestion management
and traffic calming techniques. Providing multimodal transportation options in the CRA is
increasingly important in order to support the denser, mixed -use development pattern planned for
the CRA.
When traffic volumes approach or exceed capacity during peak hours or seasons, the resulting
congestion reduces mobility. Congestion management can include roadway design practices such
as limiting the number of driveways on arterials, installing needed turning lanes, intersection
improvements, rerouting through -traffic, and traffic signal synchronization. Other congestion
management strategies include ways to actually reduce capacity by encouraging other modes of
2012
City of Fort Walton Beach
2012 Community Redevelopment Plan
transportation including transit service, walking, and bicycling. Traffic calming principally
involves managing vehicle speed, modifying drivers' behaviors, and reducing traffic volume in
order to increase the safety level for all modes of travel. The most common practices for traffic
calming include installing speed tables, medians, street trees, pavement treatments, signage, and
diverters.
Existine Roadway Analysis:
rterial Median improvements, continuous
SR 85 ( Eglin Parkway)
surroimazily streetscape/ improved sidcwalks,
s7_
com luding wider sidcwalks, underground
Undi77_,
Uptoutilities, improved pedestrian
crossings, limit continuous curb cuts,
improved internal circulation
US 98 ( Miracle Strip 4 -lane divided major arterial Improved