READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2012-20--2012 CRA Plan Update — reading text
Part 12 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31348-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
means that trash cans are
scattered about, service and mechanical equipment is highly visible, and pavement is not well
maintained. The appearance is not inviting and often does not give the appearance of being a
major entrance to stores or other establishments, even though many visitors approach from this
side due to the proximity to nearby amenities.
The overall goal of this program is to leverage funding utilizing a public -private partnership to
encourage future fagade improvements along Brooks Street Screening and fagade treatments can
include:
Screening of utility /electrical equipment both on the rooflop and on the Brooks St. fagade
Undergrounding of utility power lines;
Use of a parapet wall or pitched roof to shield rooftop electrical equipment;
Parking lot repaving with integrated landscaped features, including landscaped medians,
islands, and landscaping surrounding the facade of the Brooks Street entrance with outdoor
sealing areas, benches, etc.;
Use of architectural elements to create visually interesting features on the Brooks Street
fagade where windows are not applicable ( i. e. through banding, differentiation of materials,
colors, use of arcades, etc.) while creating a " front porch" area;
Improved monument, wall, canopy or parapet signage with adequate lighting;
Implementation of a projected entryway or gateway to encourage pedestrian traffic through
this commercial property.
Ongoing CRA Project Maintenance
Finally, in order to ensure continued maintenance of completed CRA projects, this plan
establishes ongoing installation and maintenance of public infrastructure and projects is in the
best interest of the CRA district. The CRA funds numerous capital projects that extend beyond
the definition of typical public infrastructure projects. Specifically, ongoing maintenance
includes sewer lines, water lines, storrnwater management facilities, pavement, sidewalk, curb
and gutter, and any public property, facility, or rights -of w
- ay located in the CRA district.
Provision of ongoing maintenance helps further the ultimate goal of eliminating slum and blight
through upkeep of public projects and properties
2012
City of Fort Walton Beach
