READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2025-30 Adopting 'Vision Zero' Policy & Goal of Eliminating Traffic Deaths — reading text
Part 2 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-42264-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
3. Assistance
No. 16 Below Listings No.
693J.132540180
20.20. 939939
4. Award To 5. Sponsoring Office
City of Fort Walton Beach U.S. Department of Transportation
107 Miracle Strip Parkway SW Federal Highway Administration
Fort Walton Beach, FL 32548 Office of Safety
1200 New Jersey Avenue, SE
Unique Entity Id.: QUYPA5J8D8G4 HSSA- 1, Mail Drop E71- 117
TIN No.: 59-6000323 Washington, DC 20590
6. Period of Performance 7. Total Amount
Effective Date of Award— 15 Federal Share: 292,000
months Recipient Share: 73, 000
Other Federal Funds:
0
Other Funds: 0
Total: 365, 000
8. Type of Agreement 9. Authority
Grant Section 24112 of the Infrastructure Investment
and Jobs Act( IIJA, Pub. L. 117- 58, November
15, 2021)
10. Procurement Request No. 11. Federal Funds Obligated
HSA240315PR 292, 000
12. Submit Payment Requests To 13. Accounting and Appropriations Data
See Article 5. 15X0173E50.0000.055SR10500.
5592000000. 41010. 61006600
14. Description of the Project
A Comprehensive Safety Action Plan for the City of Fort Walton Beach that will evaluate
historical crash data and identify data- driven safety improvements within the City roadway
network. The project will aim to minimize fatal and serious injury crashes in Fort Walton Beach
by providing a safe, energy efficient, cost effective, and accessible multimodal transportation
system in the City.
RECIPIENT FEDERAL HIGHWAY ADMINISTRATION
15. Signature of Person Authorized to Sign 16. Signature of Agreement Officer
TRAVIS BRANDON Digitally signed by TRAVIS
7 72.---: _
17 / 202S WHEELER
BRANDON WHEELER
Date: 2025.09.23 09:01: 09- 05' 00'
Signa ::re Date Signature Date
Name: Jason Davis Name: Travis Wheeler
Title: City Manager Title: Agreement Officer
1 of 13
U.S. DEPARTMENT OF TRANSPORTATION
GRANT AGREEMENT UNDER THE
FISCAL YEAR 2023 SAFE STREETS AND ROADS FOR ALL GRANT PROGRAM
This agreement is between the United States Department of Transportation' s( the" USDOT") Federal Highway
Administration( the" FHWA") and the City of Fort Walton Beach( the" Recipient").
This agreement reflects the selection of the Recipient to receive a Safe Streets and Roads for All(" SS4A") Grant for
the Fort Walton Beach Comprehensive Safety Action Plan.
The parties therefore agree to the following:
ARTICLE 1
GENERAL TERMS AND CONDITIONS
1. 1 General Terms and Conditions.
a) In this agreement," General Terms and Conditions" means the content of the document titled" General
Terms and Conditions Under the Fiscal Year 2023 Safe Streets and Roads for All(" SS4A") Grant Program."
dated March 17, 2025, which is available at htt1_s:// www.transportation. iov/grants/ ss4a/ grant- avreements
under" Fiscal Year 2023." Articles 7- 30 are in the General Terms and Conditions. The General Terms and
Conditions are part of this agreement.
b) The Recipient acknowledges that it has knowledge of the General Terms and Conditions. Recipient also states
that it is required to comply with all applicable Federal laws and regulations including, but not limited to, the
Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards( 2 CFR
part 200); National Environmental Policy Act( NEPA)( 42 U.S.C. § 4321 et seq.); and Build America, Buy
America Act( IIJA, div. G §§ 70901- 27).
c) The Recipient acknowledges that the General Terms and Conditions impose obligations on the Recipient and
that the Recipient' s non-compliance with the General Terms and Conditions may result in remedial action,
termination of the SS4A Grant, disallowing costs incurred for the Project, requiring the Recipient to refund to
the FHWA the SS4A Grant, and reporting the non- compliance in the Federal- government-wide integrity and
performance system.
2 of 13
ARTICLE 2
APPLICATION, PROJECT, AND AWARD
2. 1 Application.
Application Title: Fort Walton Beach Comprehensive Safety Action Plan
Application Date: July 7, 2023
2. 2 Award Amount.
SS4A Grant Amount: $ 292, 000
2. 3 Federal Obligation Information.
Federal Obligation Type: Single
2.4 Budget Period.
Budget Period: See Block 6 of Page 1
2. 5 Grant Designation.
Designation: Planning and Demonstration
ARTICLE 3
SUMMARY PROJECT INFORMATION
3. 1 Summary of Project' s Statement of Work.
The City of Fort Walton Beach will develop a Comprehensive Safety Action Plan that will evaluate historical
crash data and identify data- driven safety improvements within the City roadway network. The project will
aim to minimize fatal and serious injury crashes in Fort Walton Beach by providing a safe, energy efficient,
cost effective, and accessible multimodal transportation system in the City. Development of the
Comprehensive Safety Action Plan will include community engagement in various parts of the City, with
particular attention on reaching the historically underserved populations of the City. The Plan will identify
priority safety projects within the City ranging from low-cost, quick implementation projects to high- cost,
more involved projects that may require further study and design to move forward.
The project will be completed in one phase.
3.2 Project' s Estimated Schedule.
Action Plan Schedule
Milestone Schedule Date
Planned NEPA Completion Date: October 30, 2026
Planned Draft Plan Completion Date: February 28, 2026
Planned Final Plan Completion Date: March 31, 2026
Planned Final Plan Adoption Date: April 30, 2026
Planned SS4A Final Report Date: May 31, 2026
3 of 13
3.3 Project' s Estimated Costs.
a) Eligible Project Costs
Eligible Project Costs
SS4A Grant Amount: 292, 000
Other Federal Funds: 0
State Funds: 0
Local Funds: 73, 000
In-Kind Match: 0
Other Funds: 0
Total Eligible Project Cost 365, 000
b) RESERVED
c) Indirect Costs
Indirect costs are allowable under this Agreement in accordance with 2 CFR part 200 and the Recipient' s
approved Budget Application. In the event the Recipient' s indirect cost rate changes, the Recipient will notify
FHWA of the planned adjustment and provide supporting documentation for such adjustment. This Indirect
Cost provision does not operate to waive the limitations on Federal funding provided in this document. The
Recipient' s indirect costs are allowable only insofar as they do not cause the Recipient to exceed the total
obligated funding.
ARTICLE 4
RECIPIENT INFORMATION
4. 1 Recipient Contact(s).
Daniel Payne
Public Works& Utility Services Director
City of Fort Walton Beach
107 Miracle Strip Parkway SW
Fort Walton Beach, FL 32548
850- 833- 9613
dpavne aAfwb. org
4 of 13
4.2 Recipient Key Personnel.
Name Title or Position
Jason Davis City Manager
4. 3 USDOT Project Contact(s).
Safe Streets and Roads for All Program Manager
Federal Highway Administration
Office of Safety
HSSA- 1, Mail Stop: E71- 117
1200 New Jersey Avenue, S. E.
Washington, DC 20590
202- 366-2822
SS4A.FHWAValdot. ov
and
Agreement Officer( AO)
Federal Highway Administration
Office of Assistance Agreements
1200 New Jersey Avenue, S. E.
Washington, DC 20590
HCFASS4A:ardot. vov
and
Division Administrator— Florida
Agreement Officer' s Representative( AOR)
3500 Financial Plaza, Suite 400
Tallahassee, FL 32312
850) 553- 2200
florida.fhwa@dot.gov
and
John McKechnie
Florida Division Office Lead Point of Contact
District Transportation Engineer
3500 Financial Plaza Suite 400
850- 553- 2236
ot.xov
ARTICLE 5
USDOT ADMINISTRATIVE INFORMATION
5. 1 Office for Subaward and Contract Authorization.
USDOT Office for Subaward and Contract Authorization: FHWA Office of Assistance Agreements
5 of 13
SUBAWARDS AND CONTRACTS APPROVAL
Note: See 2 CFR§ 200. 331, Subrecipient and contractor determinations, for definitions of subrecipient( who is
awarded a subaward) versus contractor( who is awarded a contract).
Note: Recipients with a procurement system deemed approved and accepted by the Government or by the
Agreement Officer( the " AO") are exempt from the requirements of this clause. See 2 CFR 200.317 through
200. 327.
In accordance with 2 CFR 200.308( f)(6), the recipient or subrecipient shall obtain prior written approval from
the USDOT agreement officer for the subaward, if the subaward activities were not proposed in the
application or approved in the Federal award. This provision is in accordance with 2 CFR 200.308( f)(6) and
does not apply to procurement transactions for goods and services. Approval will be issued through written
notification from the AO or a formal amendment to the Agreement.
The following subawards and contracts are currently approved under the Agreement by the AO. This list does
not include supplies, material, equipment, or general
