READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 5, 2013 — CAPITAL CONSTRUCTION PROJECTS - Financial Analysis- 10.01.2013 - ppt — reading text
Part 3 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 86-CAPITAL CONSTRUCTION PROJECTS - Financial Analysis- 10.01.2013 - ppt.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
$0 $266,656 $0 $274,656 $0 12,937
9/30/2015 CONTRACTS & GRANTS $33,460 $4,754 $34,464 $5,069 $35,498 $5,182 2,253
RENTS/UTILITIES IF NO CHANGE OCCURS $896,653 $61,064 $919,773 $65,192 $943,586 $66,780
TOTAL RENTS/UTILITIES W/O MOVES $896,653 $58,814 $909,033 $55,865 $758,547 $32,267
RENTS/UTILITIES WITH MOVES $886,227 $56,564 $736,454 $31,565 $0 $0 TOTAL
ANNUAL SAVINGS $10,427 $2,250 $172,580 $24,300 $758,547 $32,267 SAVINGS
NET RENT SAVINGS $9,302 $1,125 $160,430 $12,150 $742,414 $16,133 $912,145
net of utilities
* Fiscal Years 2014 - 2016 assumes a 3% annual increase due to projected CPI
** Most leases include utilities
*** FM expenses not included (estimated at $95,000/year)
**** Moving Dates updated to reflect project start date changing from 09.01.2013 to 03.01.2014
SUMMARY OF DATA
SUMMARY prepared 09/23/2013
ESTIMATED RENT PAYMENTS IN FY '16 (if no moves occur) $943,586
ESTIMATED RENT SAVINGS IN FY '16 (if all moves occur as shown) $912,145
Rent savings are adjusted for utilities
FM expenses (custodial, grounds, maintenance) not shown est. $95,000/yr
DEBT SERVICE (est.)
$10 million Bank Loan with 20 years term $820,000/yr
$10 million Insured Bond Issue with 30 years term $676,000/yr
$11 million Bank Loan with 20 years term $902,000
$11 million Insured Bond Issue with 30 years term $743,600
$12 million Bank Loan with 20 years term $984,000
$12 million Insured Bond Issue with 30 years term $811,200
$13 million Bank Loan with 20 years term $1,066,000
$13 million Insured Bond Issur with 30 years term $878,800
$14 million Bank Loan with 20 years term $1,148,000
$14 million Insured Bond Issue with 30 years term $946,400
$15 million Bank Loan with 20 years term $1,230,000
$15 million Insured Bond Issue with 30 years term $1,014,000
LORD & SON PROJECT COST ESTIMATE – SHALIMAR
SHALIMAR ANNEX PROJECT COST ESTIMATE
PRESENTED BY LORD & SON on September 17, 2013
Option 1: New two-story buiding of approx. 50,000-SF
$165 X 50,000-SF $8,250,000
Additional items: demolition, sitework, landscaping,
telecommunications, site lighting,
A/E fees, and Civil Engineering fee $1,505.00
Total - Option 1 $9,755,000
If the County elects to complete these sections of work with their forces, deduct:
Demolition ($195,000)
Sitework ($268,000)
Landscaping ($150,000)
Telecommunications ($200,000)
Site Lighting ($140,000)
Total Deducts ($953,000)
Total Option 1 with Deducts $8,802,000
LORD & SON PROJECT COST ESTIMATE – SHALIMAR
SHALIMAR ANNEX PROJECT COST ESTIMATE
PRESENTED BY LORD & SON on September 17, 2013
Option 2: New three-story buiding where third floor is shelled space only:
approximately 75,000-SF
$165 X 50,000-SF $8,250,000
25,000-SF third floor shell 395,000
Additional items: demolition, sitework, landscaping,
telecommunications, site lighting,
A/E fees, and Civil Engineering fee 1,505,000
Total - Option 2 $10,150,000
If the County elects to complete these sections of work with their forces as listed in
Option 1:
Deduct ($953,000)
Total Option 2 with Deducts $9,197,000
POSSIBLE CAPITAL PROJECTS
Property Name Option 1 Option 2
Shalimar Annex new $9,755,000 new $10,150,000
Shalimar Annex renovate- L&S 10,430,000 renovate - FM/L&S <$8,000,000
Crestview Courthouse space reallignment $250,000 renovate/space mod. $6,000,000
Sheriff - Shalimar Expansion L&S $1,750,000 FM-Sheriff $1,200,000
former No. Ag Extension Office remodel $90,000 new $1,350,000
BCC Direction?