READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 5, 2013 — 7SFG — reading text

Part 6 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 92-7SFG.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Sweeps. Where a bend or sweep is placed in PVC nonmetallic duct bank between manholes, the duct bank must be encased in concrete with a minimum compressive strength of 17,225 kilopascal (kPa) [2500 pounds per square inch (psi)]. 2.3.9. Labeling. The contractor shall label all equipment and cables they install in accordance with ANSI/TIA/EIA-606-A-2002 and as directed by the base communications organization. New ducts shall be permanently labeled on the wall of each building/manhole indicating the connecting building/manhole at the other end of the duct (for example, “To MH-200”). 2.3.10. Bonding. Shield bonding connectors, bond bars, braids, ribbons, clamps, etc., shall be provided to maintain cable shield continuity at splices and at ground connections. Bonding connectors shall be provided [AW RUS Bulletin 1753F-803 (PE-33). Shields shall be grounded and continuous throughout the cable distribution system. 2.3.11. Grounding. The contractor shall ground new copper cable to the Telecommunication Main Ground Bus-Bar (TMGB), in or near the new service entrance box located on the outside of each building. The contractor is required to provide one 6’ X 4’’ copper ground bar and ground it to the existing ground point in accordance with ANSI-J-607-A-2002, sections 5 and 6, unless a TMGB already exists. 2.3.12, Cable Terminations. Fiber optic cables shall be terminated by being fusion spliced to factory simplex pigtails with SC connectors. Intermediate cable splices should be minimized, and consist of fusion splices in a high quality re-enterable splice case. A dry type encapsulant shall be used to seal fiber splice cases. 2.4. Outside Plant Installation. This section describes the general outside plant installation. The sequence of installation is at the contractor’s discretion. 2.4.1. Manhole and Duct System Installation. N/A 2.4.2. Fiber Optic Cable Installation. Install outside plant fiber optic cable (FOC) as described below. 2.4.2.1. A 36-strand all-dielectric fiber optic cable shall be installed from building 4545 to PB 9406 located near the county lift station on the north end of the compound. The installation shall utilize the existing manhole and duct system from building 4545 to manhole SFG 27. 2.4.3 Sheath Limitations If the OSP sheath distance from the building entrance point to the PET or FO connector housing location is greater than 50 cable feet (15 m), the use of EMT or a splice case with transition to riser- rated cable is required. 3 CONTRACTOR REQUIREMENTS The contractor shall: @ Shall provide all personnel, equipment, tools, materials, supervision, and services necessary to perform this project. e Order all supplies to complete the project that is already not Government Furnished. ® Store all supplies throughout the project. 4 TASKS The contractor shall complete the following tasks during the project: e Install 36-strand all-dielectric single mode fiber optic in locatable pipe as required to meet the scope of work. Coordinate with the base comm. Plans and Programs office. Test all cables that are installed under this project. Fiber optic cable shall be tested for dB loss end-to-end, bi-directionally through patch cables. © Conduct a final walk-through/inspection with the base contracting rep, 96 CS Cable Maintenance rep and the 96 CS/SCXP rep. The contractor will fix any discrepancies identified in the walkthrough if needed. : e Provide an in-depth test plan to include standards being used, test equipment being used and other pertinent data as required by TIA/EIA standards and the Eglin AFB Cable and Wire Specifications, dated March 2013. 5 DELIVERABLES The contractor agrees to the following deliverables: vinta on a e Provide all test results to the 96 CS Plans and Programs Flight rep. The test results provided to Plans and Programs rep should be delivered to the Cable Maintenance rep. e All cables will be labeled and tagged IAW applicable standards and technica! orders. Information on cable identifiers will be identified/provided by 96 CS/SCOW personnel. All cables will be grounded IAW applicable standards. Upon completion of the project, base layout drawings will be updated by the contractor and provided as a deliverable item on this contract. Updated drawings are to indicate GIS/GPS coordinates, cable path, cable designator and any other pertinent information as related to this installation. 6 PERIOD OF PERFORMANCE & COSTING: N/A 7 PLACE OF PERFORMANCE Building 4545, 7th SFG compound, North Gate of Eglin AFB, FL. 8 TRAVEL ; Travel onto Eglin AFB to job locations will be the sole responsibility of the contractors and must not hinder the project’s completion. Payment for travel will not be part of the contract if the contractor is in the local area. 9 CLASSIFICATION/SECURITY Contractors are not required to have any security clearances but should meet the initial requirements in the Contractor Requirements section above. 10 GOVERNMENT FURNISHED PROPERTY None. 11 WARRANY Once the project is complete and all work has been accepted, the contractor’s obligation for the installation is complete and no further support is needed. The 96 CS will continue to provide all future technical support for any needed maintenance or repairs to the cabling that is installed from PB 5270 to Bidg 44 and PB 9406 to Bldg 4545. Any work required due to warranty on the fiber from PB 5270 to PB 9406 shall be accomplished by the county or their authorized communications contractor under the terms of the warranty. Any alteration, maintenance, or changes to the fiber between PB 5270 and PB 9406 by the Government will void the warranty. 12 PRINCIPLE POCS 96 CS/SCXP Contacts: MSgt Harley Campbell Voice: 882-3118 Email: harley.campbell@eglin.af.mil Mr. Christopher Dunham Voice: 882-5004 Email: christopher.dunham@eglin.af.mil 96 CS/SCOW Contacts: Mr. Marcus Sparks Voice: 882-6948 EMAIL: marcus.sparks@eglin.af.mil Mr. John Pasternak VOICE: 882-6947 EMAIL: john.pasternak@eglin.af.mil Mr Stephen Preble VOICE: 882-6946 EMAIL: stephen.preble@eglin.af.mil 7SFG (A) S86 Contacts: CW3 Braun, Robert robert.braun1@soc.mil 850-885-7264 CW2 Guardiola, Luis luis.guardiolaparrilla@soc.mil 850-885-7265 Mr Randal Collinsworth randal.collinsworth@eglin.af.mil Randal.collinsworth@us.army.mil Randal.collinsworth@ahqb.soc.mil 13 PAYMENT SCHEDULE The contractor will bill upon completion. 8 14 NON-PERSONAL SERVICES STATEMENT Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the statement of work. Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any manner that ~ results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The base contracting representatives and the base communications representatives will all need to be present and perform the final inspection and acceptance of the completed work. (ct Page | of 10 WD 05-3033 (Rev.-13) was first posted on www.wdol.gov on 06/25/2013 AS SRCLASALELE SSE LSE CASE SESE ESE CSS SS SEC LST ECT EP CES SSCP SSS ETC PITTS SET LSS CTS Le TL eT eS Ty REGISTER OF WAGE DETERMINATIONS UNDER THE SERVICE CONTRACT ACT By direction of the Secretary of Labor Diane C. Koplewski Division of Director Wage Determinations U.S. DEPARTMENT OF LABOR EMPLOYMENT STANDARDS ADMINISTRATION WAGE AND HOUR DIVISION WASHINGTON D.C. 20210 Wage Determination No.: 2005-3033 Revision No.: 13 Date Of Revision: 06/19/2013 State: Florida Area: Florida Counties of Escambia, Okaloosa, Santa Rosa **Fringe Benefits Required Follow the Occupational Listing** OCCUPATION CODE - TITLE FOOTNOTE 01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 01012 - Accounting Clerk II 01013 - Accounting Clerk III 01020 - Administrative Assistant 01040 - Court Reporter 01051 ~ Data Entry Operator I 01052 - Data Entry Operator IT 01060 - Dispatcher, Motor Vehicle 01070 - Document Preparation Clerk 01090 - Duplicating Machine Operator 01111 - General Clerk I 01112 - General Clerk II 01113 - General Clerk III 01120 - Housing Referral Assistant 01141 - Messenger Courier 01191 - Order Clerk I 01192 - Order Clerk II 01261 - Personnel Assistant (Employment) I 01262 - Personnel Assistant (Employment) II 01263 - Personnel Assistant (Employment) III 01270 - Production Control Clerk 01280 - Receptionist 01290 - Rental Clerk 01300 - Scheduler, Maintenance 01311 - Secretary I 01312 - Secretary II 01313 - Secretary III 01320 - Service Order Dispatcher 01410 - Supply Technician 01420 - Survey Worker 01531 - Travel Clerk I 01532 - Travel Clerk II 01533 - Travel Clerk III 01611 - Word Processor I 01612 - Word Processor II 01613 - Word Processor III 05000 - Automotive Service Occupations 0500S - Automobile Body Repairer, Fiberglass 05010 - Automotive Electrician 05040 - Automotive Glass Installer 05070 - Automotive Worker http://www.wdol.gov/wdol/scafiles/std/05-3033.txt?v=13 14.12 15.84 17.72 17.64 17.18 10.89 12.29 14.08 12.11 12.11 11.37 12.41 13.92 16.33 10.35 10.98 13.07 14.24 15.93 17.77 19.11 11.28 13.09 13.09 13.09 14.64 16.33 12.45 17.64 12.91 11.16 11,93 12.71 12.69 14.24 15.93 21.33 20.25 19.43 18.80 9/12/2013 05110 05130 05160 05190 05220 05250 05280 05310 05340 05370 05400 07000 - 07010 07041 07042 07070 07130 07210 072606 09000 - 09010 03040 09080 09090 09110 09130 11000 - 11030 11060 11090 11122 11150 11210 11240 11260 11270 11330 11360 12000 - 12010 12011 12012 22015 12020 12025 12030 12035 12040 120721 12072 12073 12100 12130 12160 12190 12195 12210 12221 12222 12223 12224 Mobile Equipment Servicer Motor Equipment Metal Mechanic Motor Equipment Metal Worker Motor Vehicle Mechanic Motor Vehicle Mechanic Helper Motor Vehicle Upholstery Worker Motor Vehicle Wrecker Painter, Automotive Radiator Repair Specialist Tire Repairer Transmission Repair Specialist Food Preparation And Service Occupations Baker Cook I Cook ITI Dishwasher Food Service Worker Meat Cutter Waiter/Waitress Furniture Maintenance And Repair Occupations Electrostatic Spray Painter Furniture Handler Furniture Refinisher Furniture Refinisher Helper Furniture Repairer, Minor Upholsterer General Services And Support Occupations Cleaner, Vehicles Elevator Operator Gardener Housekeeping Aide Janitor Laborer, Grounds Maintenance Maid or Houseman Pruner Tractor Operator Trail Maintenance Worker Window Cleaner Health Occupations Ambulance Driver Breath Alcohol Technician Certified Occupational Therapist Assistant Certified Physical Therapist Assistant Dental Assistant Dental Hygienist EKG Technician Electroneurodiagnostic Technologist Emergency Medical Technician Licensed Practical Nurse I Licensed Practical Nurse II Licensed Practical Nurse III Medical Assistant Medical Laboratory Technician Medical Record Clerk Medical Record Technician Medical Transcriptionist Nuclear Medicine Technologist Nursing Assistant I Nursing Assistant II Nursing Assistant III Nursing Assistant IV http://www. wdol.gov/wdol/statites/std/05-3033 txt?v=13 Page 2 of 10 17.06 21.33 18.80 21.33 15.93 18.16 18.80 20.25 18.80 13.79 21.33 11.59 10.08 11.82 7.77 9.09 14.46 10.07 17.32 12.78 17.32 13.62 15.53 17.32 9.37 9.37 14.58 9.89 9.89 10.85 8.86 9.60 12.60 10.85 11.18 15.59 16.21 22.78 23.13 14.96 29.32 22.21 22.21 15.59 14.86 16,86

Download this text file with its original spacing ↓