Okaloosa County BOCC — October 5, 2013 — 7SFG — reading text
Part 5 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 92-7SFG.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Registration
302 West D Ave, Bldg 272
Eglin AFB FL 32542
Anticipate a three-day lead time for Security Forces to process the documents and conduct the required background
check. Once the background check is complete, a copy will be returned to the POC listed on the envelope. The
prime contractor can provide paperwork for their subcontractor(s) and submit as many documents per envelope as
necessary.
(c) When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s
license, current vehicle registration, valid vehicle insurance certificate and social security card to obtain a vehicle
pass. All deliveries to contractor work sites on Eglin AFB main base must go through the North Gate, located off
SR-85 South. Trucks trying to enter the East, West or the Northwest (old ACC) gate will be turned around and told
to use the North Gate. Contractors’ work trucks carrying equipment and tools are also required to use the North
Gate.
(d) During performance of the contract, the contractor shall be responsible for obtaining required identification for
newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer
requires access to the work site. A new access badge will not be issued when the old/expired badge is not retumed
to Security Forces, Any lost badges have to be explained in writing using a company letter head, and signed by an
authorized company representative. The lost badge letter must be sent to the Contract Specialist and then signed by
the Contract Specialist or Contracting Officer, and then the letter will be sent to Security Forces for their review.
After Security Forces has the letter a new badge may be issued.
(e) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall
comply with 4F/ 3/-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel
Security Program Management citing the appropriate paragraphs as applicable.
(f)} Upon completion or termination of the contract or expiration of the identification passes, the prime contractor
shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the
issuing office. :
(g) Failure to comply with these requirements may result in withholding of final payment.
(End of clause)
FA2823-13-C-3010
Page 20 of 20
WIDE AREA WORK FLOW DODAAC AND EMAIL DISTRIBUTION TABLE
SF 1449
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL
EMAILS CORRECTLY THROUGH WAWF.
Invoice Type: INVOICE AND RECEIVING REPORT (COMBO)
*Contract Number: See Block #2 of the award
*Delivery Order: See Block #4 of the award if applicable
*Issue Date: See Block #3 of the award
*Issue DODAAC: See Block #9 of the award
*Admin DODAAC: See Block #16 of the award
Inspected By DODAAC/Ext:
*Ship To Code/Ext: See Contract Line Item
Ship From Code:
*Pay DODAAC: See Block #18a of the award
ADDITIONAL EMAIL NOTIFICATIONS:
1. Christopher.Dunham@eglin.af.mil
2, latricia.gordon@eglin.af.mil
3, thomas.hooper!@soc.mil
4, meclaina@soc.mil
5, david jimenez. 1 1 @us.af.mil
Payments may be expedited electronically via the Internet through the Wide Area Work Flow (WAWF) system.
WAWF may be accessed at https://wawf.eb.mil.
WAWE Training may be accessed online at http://www.wawftraining.com.
Payment information may be accessed using the DFAS website at https://www.dfas.mil. Your purchase
order/contract number or invoice will be required to inquire status of your payment.
LIST OF ATTACHEMENTS
1. Statement of Objectives dated 7 August 2013
2. Wage Determination WD 05-3033 (Rev-13) dated 25 June 2013
(om a oa
STATEMENT OF OBJECTIVES
For
Alternate Fiber Optic Path to Support 7th SFG Compound
Eglin AFB, FL
7 August 2013
1.0 INTRODUCTION. This Statement of Objectives (SOO) defines the requirements for the
contractor to Engineer, Furnish, Install and Test (EFI&T) the installation of 36 strands of single
mode fiber between building 4545 at the 7th Special Forces Group (SFG) Airborne (A)
compound, located west of Duke Field to building 44 on Eglin AFB, The distance from building
4545 to building 44 is approximately 25 miles. The cable shall be installed all applicable
industry standards. Eglin AFB Cable and Wire Specs dated March 2013 may also be used to
address any questions regarding base cable installation requirements.
1.1 General Requirements. The contractor shall provide all equipment, tools, materials, supplies,
transportation, labor, supervision, management, and other incidentals necessary to EFI&T the
requirements as stated in this SOO. The contractor shall provide 36 strands of fiber optic cable
from PB 9406 to PB 5270 to the Government. The contractor shall furnish and install a new 36-
strand, all dielectric, outdoor rated single mode fiber optic cable from the existing Air Force
Main communications room in building 4545 to the county lift station north of the 7th SFG (A)
compound utilizing current manhole and conduit infrastructure. Mount a new fiber
splice/termination center in the existing rack in building 4545. At the lift station pull box (PB)
9406 the contractor shall splice all 36-strands of fiber from Building 4545 into the fiber optic
cable that is being provided to the Government by Okaloosa County. At PB 5270 the contractor
will splice the identified fiber strands into the existing government fiber cable. The government
owned cable will provide the end connectivity at building 44. Fiber terminations at building 44
will not be required under this contract. The termination of the government fiber from the North
Gate to building 44 was accomplished under a previous contract. A pre-test of the strands to be
spliced under this contract shall be accomplished by the contractor. This is to ensure that the
existing government owned cable is free of faults/troubles prior to splicing into it. The contractor
shall provide all equipment, supplies, and materials. It shall be new and not refurbished. No
material shall be provided by the government. The contractor shall provide a 20 year warranty
for the provided fiber between PB 9406 and PB 5270.
2.0 SPECIFIC TASKS AND REQUIREMENTS.
2.1. Restoration. The contractor shall restore all disturbed grounds to the “as found” condition or
better after installation. Base grounds restoration requirements shall be complied with.
2.2,Project Residue. For the installation, all residues from this project shall be disposed of off base
and IAW Federal, State, local and base environmental laws and regulations.
2.3.Outside Plant General Requirements, The contractor shall engineer, furnish, and install the
manhole /duct/duct infrastructure as defined herein. If required, the contractor shall pump out
any manholes.
2.3.1.
2.3 Ze
2.3.36
2.3.4,
2.3.5.
Any distances that may be provided in this SOO are approximations and should NOT be used
for ordering materials or determining duct lengths. Surveying contractors shall identify their
proposed route and obtain all cable footages as required to accomplish this contract.
The contractor shall complete and process all permits as required to complete installation.
(for example, the digging permit, AF Form 103)
The contractor shall be responsible for any required trenching and/or boring necessary to lay
the duct/conduit system if required. Contractor is also responsible for backfilling ditch lines
and compaction of fill materials with appropriate compaction tools. Directional drilling will
be used for major road crossings. Otherwise, crossing of paved surfaces may be performed
by pavement cuts and resurfacing with appropriate matching road material. This does not
prevent the contractor from using directional drilling if it is more cost effective. Ducts will
be appropriately protected when placed under paved surfaces.
The contractor shall coordinate with base agencies to ensure flags are placed over existing
base infrastructure prior to digging or directional drilling and will take precautions to protect
existing infrastructure. Contractor will be responsible for costs associated with repair of any
damages caused during installation when the infrastructure is clearly flagged. The AF 103
(Digging Permit) shall be submitted through Civil Engineering well in advance of digging
activities. Contractor is responsible for maintaining all markings.
Standards Compliance. The contractor shall comply with all ANSI/T IA/EIA and base
installation standards.
2.3.5.1. Installation. Installation of underground conduits/ducts, shall be IAW RUS
Bulletin 1751F-643; RUS Bulletin 1753F-151; and T.O 31W3-10-22. Ducts across
roads, sidewalks, parking areas, or areas to be paved, etc. shall be installed a
minimum of 36" below grade. In manholes with knockouts, ducts shall start at the
bottom knockout, allowing for upward expansion in the manholes. All ducts not
installed across roads, sidewalks, parking areas, or areas to be paved, etc. shall have
a minimum of 36 inches ground cover, where possible. The contractor shall provide
other protective measures, concrete cap, ¢tc., in those areas where the minimum
ground cover cannot be achieved. Grading of ducts shall be accomplished IAW
RUS Bulletin 1751F-643.
2.3.5.2. Bends and Sealing. All bends between manholes shall be a minimum 40-foot
radius with the sum of bends in all directions not exceeding a total of 90 degrees.
Only one 90-degree bend shall be allowed between manholes. Ducts shall have bell
ends and enter a manhole perpendicular to the surface of the wall through which it
is entering. All ducts/innerducts entering manholes must be sealed. Universal duct
plugs or removable putty sealants may be used. Upon completion of conduit
sections, a test mandrel 4” (6.4mm) smaller than the inside diameter of the conduit
shall be pulled through two diagonally opposite ducts to ensure proper alignment.
In addition, all ducts shall be cleared of loose materials such as concrete, mud, dirt,
stones, etc.
on om
2.3.5.3. Pull Rope. All vacant ducts (or ducts with a single innerduct) shall be provided
with a waterproof corrosion resistant pull rope for future cable installation. The pull
rope shall extend into the manhole and be secured to the cable rack or pulling iron,
etc.
2.3.5.4. Utility Separation. When communications ducts cross either power duct or buried
power cable, maintain a minimum separation of 3 inches of concrete or 12 inches of
well-tamped earth between the two or 12 inches of well tamped earth when parallel;
for pipes (e.g., gas, water, oil) maintain 6 inches when crossing or 12 inches when
parallel.
2.3.5.5. Spacers and Tracer Wire. Along the length of the duct run, if the ducts are
installed by trenching, spacers shall be placed at an interval of four (4) spacers per
20 feet and cable warning tape shall be buried one (1) foot below the surface and
shall follow the duct route. The tape shal! be a minimum of three inches wide and
orange in color with the appropriate warning message. At least one duct will have
tracer wire embedded as part of its construction.
2.3.6. Entrance Conduits into Existing Manholes. When new entrance conduits/ducts or sleeves
are required, the contractor shall bore and install the necessary holes and install the ducts or
sleeves, if knockout doesn’t exist. Penetration shall not be in such a location through the wall
as to block use of existing ducts in the manhole. New ducts will be a minimum of 18 inches
from either the manhole floor or ceiling, if practical. The minimum bending radius for entry
conduit/ducts shall be no less than 10 times the inside diameter of the conduit. Ducts and
openings around ducts shall be sealed to prevent moisture from entering the manholes.
2.3.7. Excavation/Building Penetrations. All wall penetrations, including inside buildings, shall be
restored to meet the required base fire ratings.
2.3.8. Conduit Bends or